FA851713R00860_PDF_Sol_Attachments.pdf
PDF 2 MB Posted
- Attached to
- Repair of Fire Truck Components
- Solicitation number
- FA8517-13-R-00860
About this file
PDF_Solicitation Attachments_FA8517-13-R-00860
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA851713R00860______0002.pdf | ||
| PWS_12Mar13rev1.pdf | ||
| FA851713R00860______0001.pdf | ||
| CDRLS_A001thruA007.pdf | ||
| FA851713R00860.pdf | ||
| DD_Form_1348-1A_CAVAF_SOW.pdf | ||
| RFP_Pricing_Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F D 2 0 6 0 - 1 3 - 0 0 8 6 0 P W S
PERFORMANCE-BASED WORK SPECIFICATION (PWS)
FOR THE REPAIR OF FIRE TRUCK COMPONENTS
Purchase Request: FD2060-13-00860
Date: 12 March 2013
CONTENTS
SECTION TITLE PAGE
I DESCRIPTION OF SERVICES 2
II SERVICES SUMMARY 2
III GOVERNMENT FURNISHED PROPERTY & SERVICES 3
IV GENERAL INFORMATION 4
V APPENDICES 9
PREPARING ORGANIZATION:
410 SCMS/GULB
ROBINS AFB GA
Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 99-06-16). Other requests for this document shall be referred to 410 SCMS/GULB, Robins AFB GA 31098.
PERFORMANCE-BASED WORK STATEMENT (PWS)
Purchase Request: FD2060-13-00860
Date:1 March 2013
1.0 DESCRIPTION OF SERVICES. This Performance-Based Work Statement establishes the procedures to provide repair services for items on the National Stock Number (NSN) List which is Appendix C to this document. The contractor shall perform all actions necessary to return reparable items to a serviceable condition within Turnaround Time (TAT). These vehicle components provide the necessary functions that enable special purpose vehicles to perform duties related to emergency and safety operations to support Air Force flight lines. On time delivery is a pertinent requirement due to critical mission operations. The contractor shall provide quality repair with low to no Product Quality Deficiency Reports (PQDR). The contractor shall punctually deliver correct data submittals.
2.0 SERVICES SUMMARY
Performance Objective
PWS
Ref
Performance Threshold
Repair each item to serviceable condition within Turnaround Time (TAT)
4.3 Routine- delivered no later than (NLT) 30 business days
after receipt of repairable asset/receipt of order whichever is later, 100% on time.
MICAPS - delivered 15 business days after receipt of repairable asset, 100% on time.
SURGE– delivered 15 business days after receipt of repairable asset, 100% on time.
Provide quality repair with low to no Product Quality Deficiency Reports (PQDR)
4.4 No more than one PQDR of total repaired assets in a
single contract year, with a goal of zero.
Submit data requirements correct and punctually
3.4, 4.0,4.6 4.15.2, 4.17.1, 4.17.2
Data delivery shall be on time and free of errors. Any errors shall be corrected within seven calendar days of notification of error by the Production Management Specialist (PMS) Seller.
3.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, MATERIAL, and
SERVICES (GFP/GFE/GFM/GFS).
3.1 No Government Furnished Material/ Government Furnished Equipment (GFM/GFE) is authorized.
3.2 The contractor shall furnish all material, support equipment, special tools, test equipment, and services required for the repair of the end item.
3.3 Reporting Loss of Government Property (FEB 2011)
a. Definitions. As used in this clause— “Government property” is defined in the clause at FAR 52.245-1(a), Government Property. “Loss of Government property” means unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to—
(1) Items that cannot be found after a reasonable search;
(2) Theft;
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
“Unit acquisition cost” means—
(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and
(2) For Contractor-acquired property, the cost derived from the Contractor’s records that reflect consistently applied, generally acceptable accounting principles.
b. Reporting loss of Government property.
(1) The Contractor shall use the Defense Contract Management Agency (DCMA) eTools software application for reporting loss of Government property. Reporting value shall be at unit acquisition cost. The eTools “LTDD of Government Property” toolset can be accessed from the DCMA home page External Web Access Management application at http://www.dcma.mil/aboutetools.cfm.
(2) Unless otherwise provided for in this contract, the requirements of paragraph (b)(1) of this clause do not apply to normal and reasonable inventory adjustments, i.e., losses of low-risk consumable material such as common hardware, as agreed to by the Contractor and the Government Property Administrator. Such losses are typically a product of normal process variation. The Contractor shall ensure that its property management system provides adequate management control measures, e.g., statistical process controls, as a means of managing such variation.
(3) The Contractor shall report losses of Government property outside normal process variation, e.g., losses due to Theft; Inadequate storage; Lack of physical security; or “Acts of God.”
(4) This reporting requirement does not change any liability provisions or other reporting requirements that may exist under this contract.
3.4 Commercial Asset Visibility AF (CAVAF): The contractor shall report using the Commercial Asset Visibility (CAVAF). (CDRL A001, Data Item Description, DI-MGMT- 81634B).
http://www.dcma.mil/aboutetools.cfm
The contractor shall provide data related to the tasks and efforts conducted for each repairable unit. If CAVAF training is required, send an email to: 406scms.cav.af.ar@robins.af.mil. The contractor shall conduct production reporting on a daily or as transactions occur basis. The contractor shall obtain a valid DoD PKI certificate to log into CAVAF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required
4.0 GENERAL INFORMATION:
Inspect, service test, or check completed end item in accordance with applicable manufacturer’s specifications. The contractor shall report final test/inspection reports to evaluate compliance with system requirements, performance objectives, and, Original Equipment Manufacturer (OEM) specifications. (CDRL A002, Data Item Description-NDTI-80809B, Test/Inspection Report) Contractor shall repair submitted hardware, utilizing repair components that are equal to, or superior to OEM components. Data delivery shall be on time and free of errors. Any errors shall be corrected within seven calendar days of notification of error by the Production Management Specialist (PMS) Seller.
4.1 The original design of the asset or the design functional capabilities of the component, shall not be changed, modified, or altered unless such changes are authorized in writing by the PCO and by the engineer, 410 SCMS/GUEA.
4.2 Contractor furnished material or parts used for replacement shall equal or exceed the quality of those specified in the parts list. The material or parts shall be entirely suitable for restoration of the component part for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item. If there is a need to use parts other than the parts listed in the latest government furnished baseline, the standard parts approval procedures through the Defense Electronic Supply Center (DESC) or the Defense Industrial Supply Center (DISC) shall be followed. If a part is disapproved by DESC or DISC, the assigned 410 SCMS/GUEA engineer has approval authority.
4.3 The contractor shall complete production and ship serviceable assets 100% of the time.
Delivery shall be no later than (NLT) 30 business days for routine assets, 15 business days for MICAPS, and 15 business days for SURGE requirements. The contractor shall forward any production problems (including delays in delivery) through the Administrative Contracting Officer (ACO) and the AFSC/PZAAC Procurement Contracting Officer (PCO), Production Management Specialist Seller, (PMS), 410 SCMS/GULB.
4.4 If or when deficiencies occur, which should be Low to None the contractor shall expedite all efforts to rectify the errors with minimal delay or compromise of quality outcome. The repaired item shall maintain a rate of no more than one Product Quality Deficiency Reports (PQDR) of total repaired assets per contract year, with a goal of zero.
4.5 When requested, the contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, Investigation, and Resolution USAF Deficiency Reporting. These defects may be reported from field or depot organizations.
mailto:406scms.cav.af.ar@robins.af.mil
Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the contractor's Quality Program at no additional cost to the government. The contractor shall establish and maintain a program, approved by the Government Representative.
4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies. A component received which is not contractually covered shall be referred to the ACO for disposition. Contractor shall notify the PCO when a component is received which has major components missing within ten days after receipt of component. The contractor shall, at no additional cost to the Government, replace all missing major components/subassemblies unless the cost of the individual missing component or subassembly exceeds 10% of the current acquisition cost of the component being overhauled. The Contractor shall be required to submit all appropriate data requirements to GIDEP Government/Industry Exchange Program (GIDEP) as it is generated in accordance with the CDRL of this contract.
Part, component, material, equipment, or manufacturing process deficiencies (actual or potential) shall be reported to GIDEP. The contractor shall maintain a record of the status and disposition of all Alert/Safe Alert reports. (CDRL A003, Data Item Description, DI-QCIC-80125B, GIDEP Alert Report) and Response to an Alert/Safe Alert (CDRL A004, Data Item Description, DI- QCIC-80126B, GIDEP Alert Response).
4.7 Once an item has been determined beyond economical repair (BER), the following procedure is established to disposition the Governments assets.
4.7.1 Determination that the items are BER, shall be made by the contractor and communicated to the ACO for verification within 10 business days of work start date. The contractor shall not repair any item where the total cost of parts and labor exceed 75% of the government replacement cost of the item unless authorized through the ACO to the PCO to PMS Seller. The ACO shall contact the PCO for repair or disposal instructions.
4.7.2 Once determination that the items are BER and to be destroyed, the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M-1, Defense Demilitarization Manual, Appendix 3, Demil Code D, by mutilation (total destruction of items and components), melting, cutting, tearing, scratching, crushing, breaking, punching, neutralizing, etc.
4.7.3 Record of such to include the certificate shall be retained by the contractor as evidence of disposal. Such evidence shall be maintained for the required period of time.
4.7.4 Modification shall be issued by the ACO to identify all items that have been reviewed and determined BER and that the assets shall be destroyed in place.
4.7.5 Items shall be disposed, in a manner that the parts are never to be re-issued or used.
4.8 Inventory Inspection: Visually inspect each item received to determine proper identification, completeness, and condition. Report to the ACO any discrepancies, missing, or incomplete parts.
4.9 Preservation: Upon receipt of equipment, contractor shall provide adequate preservation necessary to protect the equipment while in storage prior to being placed in work. Any oil, grease, lubricants, and any special preservatives required to protect the equipment shall meet specifications IAW T.O. 1-1-689-1, Cleaning and Corrosion Control, Volume I Corrosion Program and Corrosion Theory.
4.10 Finishing
4.10.1 Replace damaged, illegible, or missing instruction or data plates.
4.10.2 Permanently and legibly mark each repaired end item with the contractor’s identification. This identification shall include the contractor’s name, the Air Force contract number, and date of repair and shall be affixed to the end item by decal or similar permanent means.
4.10.3 All painted portions of the end item shall be inspected to determine if repaint is required. Loose and scaled paint shall be removed. All bare metal surfaces shall receive corrosion treatment prior to application of primer and paint. Severely marred surfaces shall be repainted. Application of primer and paint shall be IAW T.O. 1-1-8, Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment.
4.10.4 Upon completion of final tests and government inspection and acceptance, seal all ports, vents and openings with plugs, caps, and plates or enclose in a sealed plastic bag, as applicable, to prevent the entry of foreign matter. Install plugs and caps that meet the requirements for any electrical connectors to prevent damage during handling and shipment.
4.11 Performance of Service During Crisis: The Functional Commander/Director has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DoDI 1100.22, Policy and Procedures for Determining Workforce Mix and DFARS 237.76, Continuation of Essential Contractor Services.
4.12 Inspection of Services Clause: The Federal Acquisition Regulation (FAR) 52.212-4, Inspection of Services - Fixed Price, gives the Government the right to inspect Contractor Performance.
4.13 Green Procurement Program (GPP) GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using U. S. Government appropriated funds, including services and new requirements. FAR 23.404(b), Agency Affirmative Procurement Program, applies and states the GPP requires 100% of EPA designated product purchases that are included in the Comprehensive Procurement Guidelines (CPG) list that contains recovered materials, unless the item cannot be acquired: (a) competitively within a reasonable timeframe; (b) meet appropriate performance standards, or (c) at a reasonable price. The prime contractor shall be responsible for ensuring that all subcontractors comply with this requirement.
4.14 Security Requirements: (UNCLASSIFIED)
4.14.1 General: Actual knowledge of, generation, or production of classified information is not required for performance of the contract. Cleared personnel are required to perform this service because security measures which are in force do not preclude access to classified information.
4.14.2 Employee Clearances: Contractor employees that need access to Government owned Automated Information Systems (AIS) will require the minimum of a Favorable National Agency Check (NACI). Submit a Standard Form 85, Questionnaire for Public Trust Positions, (fingerprint cards if available) to the 638 SCMG/OMOS Security Office, 235 Byron, Ste 19A, Robins AFB GA 31098 for processing.
4.14.3 Security Incidents and Violations: The contractor shall immediately notify the 638 SCMG/OMOS Security Office of any actual security violation, security incident, or of any indication of a potential unauthorized disclosure or compromise of classified or sensitive but unclassified information.
4.15 Safety Requirements: The contractor shall comply 100 percent of the time.
4.15.1 Contractor Compliance. Contractors shall comply with Occupational Safety and Health Act (OSHA) Public Law 91-596, OSHA Standard 29 CFR 1910, and OSHA Standard 29 CFR 1925 for the protection of their employees. To ensure the protection of Air Force personnel, assets and interests, the contractor shall be solely responsible for compliance with all federal, state and local laws, codes, ordinances, regulations, the Occupational, Safety and Health Act (Public Law 91-596) and the resulting OSHA Standards 29 CFR 1910 and OSHA Standards 29 CFR 1925, all Air Force Occupational Safety and Health (AFOSH) Standards, and any applicable local guidance. The contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
4.15.2 Mishap Notification: The contractor shall telephonically notify the Safety office within four (4) hours of all mishaps or incidents to DoD property entrusted by this contract operation. No more than one instance of late mishap notification per calendar year is acceptable. Follow all other reporting requirements as identified on the DD1423, CDRL A005 for Accident/Incident Report (Mishap Notification & Reporting) Data Acquisition Document Number DI-SAFT-81563.
http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 http://www.osha.gov/dcsp/vpp/index.html
4.15.3 Mishap Investigation. If requested by the Government Procuring Contracting Officer (PCO) or Administrative Contracting Officer (ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenances and training records until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is completed.
4.16 Packaging and Transportation: (MIL-STD-2073-1d, 10 May 02, Standard Practice for Military Packaging and MIL-STD-129P (4), 19 Sep 07, Military Marking for Shipment and Storage). When shipping containers are received that meet the requirements of the AFMC Form 158, Packaging Requirements, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements.
4.17 Item Unique Identification (IUID) Requirements: The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS).
All assets subject to marking must be recorded in the DoD IUID Registry.
4.17.1 IUID Marking Plan. The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by 410 SCMS/GUEA engineer prior to implementation.
(DI-MGMT-81803, CDRL A006).
4.17.2 IUID Marking Activity And Verification Report. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.
(DI-MGMT-81804, CDRL A007)
4.18 Contractor Manpower Reporting Requirements. Per reference SAF/AQ Memo, 13 Nov 12, the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The contractor shall completely fill in all required data fields at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement). Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
4.18.1 *Reporting Period: The Contractor shall input data by 31 October of each year. However, due to the delayed implementation, input of FY12 data is required by 31 Mar 13.
4.18.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
4.18.3 User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the CMRA link at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement).
4.19 Procedure for Invoicing/Payment/Acceptance: The multi-functional team (MFT) can request that data items be attached to acceptance forms through Wide Area Work Flow (WAWF) or submitted to government personnel as spelled out in the data Contract Data Requirements List (CDRL). To allow for payment of separately priced data items, the MFT must use WAWF for acceptance. Data CDRL will determine submittal requirements; however, both separately priced and non-separately priced items must be accepted in WAWF in order for the line item to be closed out in the contract. Information regarding Wide Area Work Flow-Receipt and Acceptance is available on the Internet at https://wawf.ef.mil.
5.0 APPENDICES:
Appendix A: References
Name of Publication Sections that Apply
Date of Publication
Title of Publication
MIL-STD-129P
With Change 4 Entire 19 Sep 07 Military Marking for Shipment and Storage
MIL-STD-130 Entire 17 Dec 07 DoD Standard Practice Identification Marking of US Military Property
DFARS 252.211–7003 Entire Jun 2011 Item Identification and Valuation
MIL-STD-2073-1d Entire 10 May 02 Standard Practice for Military Packaging
DFARS 237.76 Entire 24 Nov 10 Continuation of Essential Contractor Services DoDI 1100.22 Entire 12 Apr 10 Policy and Procedures for Determining Workforc
Mix.
FAR 23.404 Paragraph “b” 18 May 12 Agency Affirmative Procurement Program
OSHA Public Law 91-596
Entire 1 Jan 04 Occupational Safety and Health Act (OSHA) of
Occupational Safety And Health Standards
Part 1910 1 Jan 04 Occupational Safety and Health Act (OSHA) of
Safety and Health Regulations for Service Contracts
Part 1925 30 Dec 71 Occupational Safety and Health Act (OSHA) of https://wawf.ef.mil/
DoD 4100.39-M Entire May 2010 and Change Letter Oct
Federal Logistics Information System
T.O. 00-35D-54
Entire Document
1 May 07 USAF Deficiency Reporting, Investigation, and Resolution
FAR 52.245-1
Entire Aug 2010 Government Property
FAR 52.246-4 Entire Aug 1996 Inspection of Services-Fixed Price
DoD 4160.21-M-1 Appendix 3 1 Feb 95 Defense Demilitarization Manual
T.O. 1-1-689-1 Entire 0Ma05 Cleaning and Corrosion Control, Volume I Corrosion Control and Corrosion Theory
T.O. 1-1-8 Entire 12 Jan 10 Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment
T.O. 36A12-8-17-2. Chapter 8
1 Oct 2003
Aircraft Crash and Structural Fire Fighting Truck Type A/S32P-19 Maintenance and Overhaul Instructions
T.O. 36A12-8-17-4 ENTIRE 15Aug 2004 Aircraft Crash and Structural Fire Fighting Truck Type A/S32P-19 Illustrated Parts Breakdown
T.O. 36A12-8-16-4 Section II – Maintenanc e Parts List
28 Feb 2003 Technical Manual Illustrated Parts Breakdown Firefighting Truck Type A/S32 P-15
T.O. 36A12-8-16-2
ENTIRE 01 Apr 2007 Technical Manual Maintenance/Overhaul Instructions Firefighting Truck Type A/S32 P-15
T.O. 36A12-23-19-2 ENTIRE 31 Oct 2002 Technical Manual Truck, Tank Type A/S32 P-18 Overhaul Instructions
T.O. 36A12-23-19-4 ENTIRE 30 Apr 2007 Technical Manual Truck, Tank Type A/S32 P-18 Illustrated Parts Breakdown
T.O. 36A12-12-20-2 ENTIRE 15 Oct 2006 Technical Manual Truck, Tank Type A/S32 P-22 Type A/S32 P-24 Overhaul Instructions
T.O. 36A12-12-20-4 ENTIRE 30 Apr 2007 Technical Manual Truck, Tank
T.O. 36Y33-13-192 ENTIRE 1 Sep 1991 Technical Manual, Maintenance/Overhaul Instructions Allison Transmission MT-654-CR
T.O. 36Y33-13-194 ENTIRE 1 Sep 1991 Technical Manual, Illustrated parts Breakdown Allison Transmission MT-654-CR
APPENDIX B
List of Applicable Terms
CAVAF – Commercial Asset Visibility data reporting system.
Mission Incapable (MICAP) – An asset that has caused an aircraft platform to be mission incapable.
Surge of exchangeable - The process by which increased requirements generated by external contingency demands are supported during wartime. Exchangeable surge includes increasing shop production above the level that can normally be produced by available peacetime resource levels, expedited contract actions, and other options for support that would not be authorized under peacetime operations.
Quality Deficiency – Attributed to errors in workmanship, nonconformance to specifications (initial failure), drawing standards, or other technical functional requirements, Product Quality Deficiency Reports are known as PQDRs.
Quality of Service – Repair provided continues to maintain reduced numbers of Quality Deficiency Reports.
Routine exchangeable repairs – Remanufacture of routine Government requirements other than MICAP and Surge.
APPENDIX C
List of Applicable NSN/Part Number to End Item
NSN Part Number Nomenclature End Item 2520-01-282-6711 6885610, 039-9005 Transmission Truck, Tank Type
A/S32P-18 2520-01-318-5013 1425980, 23019330 Transmission Firefighting Truck
Type A/S32P-15 4320-01-332-5308 004536V, LDMA9 Pump Truck, Tank
Type A/S32 P-22 Type A/S32 P-24
2540-01-163-1671 1371220U Gear Box Structural Fire
Type A/S32 P-22 Type A/S 32 P-24 Illustrated Parts Breakdown
Fighting Truck Type A/S32P-19
2520-01-181-1335 1373890, 23010888 Transmission Structural Fire Fighting Truck Type A/S32P-19
2520-01-164-9056 1369320U Power Divider Structural Fire Fighting Truck Type A/S32P-19
2520-01-297-6614 2ET16 Transmission Refuel Truck Type A/S32R-11
File Number: FD2060-13-00860 Prepared By: djn/78 ABW/SEG/Version Dec 2012 1
APPENDIX C
Industrial Safety and Health Requirements for:
PR/Contract/Project#: FD2060-13-00860
Date: 2 May 13
Type Work: Repair, Fire Truck Components
PART I
Instructions: The contractor Safety and Health Plan (required IAW AFI 91-202, AFMC Supp 1 and AFPAM 91-210) shall address in detail the items listed in Parts II and III as applicable.
Repeating the referenced standard without addressing the company’s specific processes or procedures will not suffice. If task specific procedures are incorporated into a company local document, those procedures must be attached to the submitted Safety and Health Plan.
Referencing the company's local procedure/document in the Safety and Health Plan is not adequate. If the company's local procedure/document is not attached, the submitted Safety Plan will be returned unacceptable.
PART II
1. Environmental, Safety, And Occupational Health (ESOH): The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
2. Voluntary Protection Programs (VPP): The Air Force is part of OSHA’s VPP. All contractors are required to familiarize themselves with the requirements of VPP. Information on VPP can be accessed at http://www.osha.gov. The intent of the Air Force Safety Program is to prevent injuries and to communicate our safety expectations with potential offerors as well as those contractors awarded a government contract. The Air Force’s interest is to protect personnel working in or around contractor operations, and to protect Air Force equipment/property.
3. Contractor Employees: Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note:
The Air Force Occupational Safety Instruction is frequently annotated because many of the Air Force standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on
Prepared By: djn/78 ABW/SEG/Version Dec 2012 2 hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) Part 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs bilingual speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
4. Inspections: Air Force Environmental, Safety, Occupational Health and Fire protection officials or responsible Quality Assurance Evaluator (QAE) may periodically enter a contractor’s workplace to verify working conditions of Air Force personnel. If an Air Force employee observes improper procedures or unsafe conditions exits which place Air Force personnel or equipment/facilities in jeopardy, the contractor will remove personnel and/or equipment from the unsafe condition and immediately notify the Contracting Officer and the Installation Safety Office. Department of Labor (DoL), OSHA inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They can be considered “no notice” inspections. Noncompliance with safety requirements can result in work stoppage, inexcusable delays, and/or costly fines issued by the DoL. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. Fines and additional costs for violations levied against the contractor as a result of OSHA findings, and/or installation safety, fire, health or environmental are the sole responsibility of the contractor and shall not be passed through to the Government.
5. Mishap Notification: The contractor shall notify the contracting unit’s Safety Office telephonically at (478)-926-6271 during duty hours and (478)-327-2612 after hours, within four
(4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Installation Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
Prepared By: djn/78 ABW/SEG/Version Dec 2012 3
i. Other pertinent information
Note: If requested by Government Personnel (PCO/ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is finalized and closed out.
6. Impoundment Procedures: The contractor shall establish written impoundment procedures, as part of their Safety and Health Plan. Impound data must be included in the Mishap Notification Procedures as applicable. As a minimum, the procedures must address:
a. Appointment of Impound Authority in writing (copy faxed to QAP and Safety Office)
b. Impound Authority e-mail address and phone numbers
c. Specific instructions (cordon, facility locked facility, etc.) to secure the site or government asset, to prevent tampering with the aircraft, site or government assets
d. Specific instructions or measures to ensure only authorized personnel directly involved in management, SAFING, troubleshooting, or repair of aircraft or equipment gain access to the impound site
e. Additional guidance is located within AFI 21-101, AFMC Supplement 1
7. Contractor Safety and Health Program: The contractor shall establish and maintain an acceptable safety and health program.
a. Contractor Safety and Health Manager. As part of the Contractor Safety and Health Program, the contractor shall assign in their plan, by name and phone number, a person who will be the primary point of contact for safety and health issues for the on-site operation.
b. Contractor’s Safety and Health Plan. Contractor shall prepare a safety and health plan in accordance with PART I, PART II, and PART III; incorporating the listed elements in PART II and addressing in detail the flagged items below in PART III of this Appendix. The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan. The plan must be accepted by the government and will be incorporated into the awarded contract. Should a master safety and health plan remain on file with the contracting unit’s Safety Office, the contractor must ensure that it is current, updated, and includes all elements below. An addendum to the plan must include the processes noted below:
(1) Changes to the Plan. If, during the performance of this contract, changes to the contractor’s Safety and Health Plan are required, the contractor shall submit a revised Safety and Health Plan to the Contracting Monitor and/or Contracting Officer’s Representative (COR). The same process of review and negotiation (if applicable) involved in the original submission applies to any revision submitted after contract award. The accepted revised Safety and Health Plan shall then be incorporated by contract modification as an attachment or by reference.
Prepared By: djn/78 ABW/SEG/Version Dec 2012 4
(2) Tracking Rates. The Contractor’s Safety and Health Plan shall identify how their Total Case Incident Rate (TCIR) and Days Away, Restricted and/or Transferred (DART) rates, or comparable insurance rates or compensation injury rates will be tracked, and the corrective measures to be used if these rates begin to decline. The contractor must also describe the processes and procedures to be used to track their compliance with their Safety and Health Plan and how they will correct any deviations from the plan, when and if identified.
PART III
The following items represent a list of required elements, as applicable, for performance of this contract. The contractor’s safety and health plan shall address how compliance with these requirements will be ensured. The safety plan shall clearly define company procedures on specific tasks/processes, personnel qualifications, how facilities comply with fire requirements to include the electrical wiring and fire protection systems installed (i.e., fire suppression, fire detection, fire extinguishers, firewall ratings, etc) required equipment used to accomplish tasks and other necessary requirements to fulfill the checked items for the protection of government personnel and property. The contractor’s safety and health plan shall meet, but may exceed the referenced standards.
1. Walking/Working Surfaces: Contractor shall comply with the standards in: 29 CFR 1910, Subpart D and NFPA 101, Life Safety Code. All interior walking and working surfaces which are part of the means of egress shall remain clear at all times and comply with the requirements of NFPA 101. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls are in place to minimize tripping hazards, the accumulation of flammable/combustible materials, etc.
Portable metal ladders – methods and controls are in place to ensure inspection and safe use.
Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.
2. Housekeeping: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. Clean as you go will be enforced. Refuse, trash, and debris will be collected daily and not left on site to prevent hazards during high winds and inclement weather.
3. System Modification which Alters Form, Fit or Function: Contractor shall comply with:
Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI 63-131, Modification Program Management, 6 Nov 09, for system modifications, which alter form, fit, or function.
4. Personal Protective Equipment: Contractor shall comply with the standards in: 29 CFR 1910.132, 134, 136, Subpart I and 29 CFR 1926.28, 95, 100, 101, 102, & 951. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc. Contractor’s Safety Plan shall also address:
- Eye and face protection
- Head protection http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10112 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10112 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10909
Prepared By: djn/78 ABW/SEG/Version Dec 2012 5
- Foot Protection
- Electrical protective equipment
- Hand protection
- Safety harnesses, life lines, and lanyards.
5. Respiratory Protection Program Elements: Contractor shall comply with the standards in:
29 CFR 1910.134 and 29 CFR 1926.134. Respirators are required to be worn if employees are exposed to inhalation hazard. Contractor’s Safety Plan shall also address:
- Training
- Medical evaluation
- Fit tests
- Selection of respiratory equipment
- Storage of respiratory equipment
- Pre-use checks
6. General Environmental Controls: Contractor shall comply with the standards in: 29 CFR 1910, Subpart G, 29 CFR 1910, Subpart J and 29 CFR 1926, Subpart D. Contractor’s Safety Plan shall also address:
- Sanitation-toilet and washing facilities
- Accident prevention signs and tags
7. Hearing Conservation Program Elements: Contractor shall comply with the standards in:
29 CFR 1910.95 and 29 CFR 1926.52. Note: Noise exposures are based on ACGIH guidelines of 85 dB TWA. Contractor’s Safety Plan shall also address:
- Monitoring (survey of noise producing equipment)
- Audiometric testing
- Hearing Protectors
- Training
- Recordkeeping/Access to information and training material
8. Medical and First Aid: Contractor shall comply with the standards in: 29 CFR 1910, Subpart K and 29 CFR 1926, Subpart C. Contractor’s Safety Plan shall also address:
- Adequate first aid supplies
- Trained employee to render first aid
- Recordkeeping
- Reporting and investigating accidents/incidents
- Off-site physician(s)
- Maintenance of and employee access to exposure monitoring data and medical records
9. Confined Space Program Elements: Contractor shall comply with the standards in: 29 CFR 1910.120, 146 and 29 CFR 1926.21and 353 and AFI 91-203, Air Force Consolidated http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=12716 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10666 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10116 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10116 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10121 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10908 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9735 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10625 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10122 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10122 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10907 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9797 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9797 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10607 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf
Prepared By: djn/78 ABW/SEG/Version Dec 2012 6
Occupational Safety Instruction, 15 Jun 12, Chap 23. A confined space must meet the following three criteria:
(1) Is large enough and so configured that an employee can bodily enter and perform assigned work; and
(2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry.);
and
(3) is not designed for continuous employee occupancy. Examples: underground vaults, tanks, storage bins, manholes, pits, silos, process vessels, and pipelines.
Contractor’s Safety Plan shall address:
- Hazards of confined space
- Permit and Non-permit confined spaces
- Responsibilities of management, entry supervisor, authorized entrant, and authorized attendants
- Training requirements
- Permit handling and approval
- Emergency and rescue plans
- Testing and monitoring requirements
- Special hazards
- Posting requirements (applicable to subcontractor operated facilities)
10. Electrical: Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR 1926, Subpart K, AFI 91-203, Air Force Consolidated Occupational Safety Instruction, 15 Jun 12, Chap 8, and NFPA 70. All electrical wiring must be IAW National Electrical Code (NEC)
70. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:
- Selection and use of work practices
- Training (basic electrical safety knowledge)
- Use of equipment (handling, visual inspection, rating of equipment)
- GFCI Protection for outside contractor drops and wet/damp areas
- Arc Flash
11. Hazardous Energy Control Program Elements (Lockout-Tagout): Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR 1926, Subpart K, AFI 91-203, Air Force Consolidated Occupational Safety Instruction, 15 Jun 12, Chap 21, and NFPA 70.
Contractor’s Safety Plan shall also address:
- Purpose of hazardous energy control program
- Employee training
- Lockout/tagout procedures-Removal of locks and tags
- Periodic inspections
- Restoring equipment to normal operations http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf
Prepared By: djn/78 ABW/SEG/Version Dec 2012 7
- Arc Flash
- Portable Fire Extinguishers (proper type, inspection, maintenance, testing, and training)
12. Electronic/Electrostatic Discharge Sensitive Components: An electrostatic discharge program, when applicable, shall be implemented according to: MIL-HDBK-263B, Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), 31 Jul 94, MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), 25 Oct 95 and T.O. 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07or the commercial standard ANSI/ESD S20.20, Electrostatic Discharge Control Program-Protection of Electrical & Electronic Parts, Assemblies and Equipment, 4 Aug 99.
13. Machinery and Machine Guarding: Contractor shall comply with the standards in: 29 CFR 1910, Subpart O. Contractor’s Safety Plan shall also address:
- Control of rotating parts, flying chips, and sparks
- Inspection
- Maintenance
14. Hand and Portable Powered Tools and other Hand-Held Equipment: Contractor shall comply with the standards in: 29 CFR 1910, Subpart P and 29 CFR 1926, Subpart I.
Contractor’s Safety Plan shall also address:
- Inspection
- Proper use
- Guarding
- Maintenance
- Control of rotating parts, flying chips, and sparks
15. Soldering: Soldering shall be conducted in accordance with the requirements in T.O. 00- 25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07, Chapter 3 and 29 CFR 1910.253.
16. Compressed Gas and Compressed Air Equipment: Contractor shall comply with the standards in: 29 CFR 1910.169, Subpart M. Contractor’s Safety Plan shall also address:
- Employee Training
- Inspections
- Storage and Handling
17. Toxic and Hazardous Substances: Contractor shall comply with the standards in: 29 CFR 1910, Subpart Z and 29 CFR 1926, Subpart Z. Contractor’s Safety Plan shall also address a section related to working with toxic and hazardous substances, such as asbestos, benzene, lead, and styrene, where the following areas are addressed:
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10131 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10131 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10132 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10913 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10129 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10147 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10147 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10951
Prepared By: djn/78 ABW/SEG/Version Dec 2012 8
- Threshold Limit Values (TLV)-Exposure monitoring
- Medical surveillance
- Work practices
- Engineering controls
- Respiratory protection
- Protective clothing (PPE)
18. Hazardous Communications: Contractor shall comply with the standards in: 29 CFR
1910.1200. Contractor’s Safety Plan shall also address:
- Written Program-list of hazardous chemicals
- Identify the hazardous chemical(s) - labeling system
- MSDS data sheet location
- Employee information and training-methods used to inform employees of the hazards, and precautionary measures
19. Hazardous Materials: Contractor shall comply with the standards in: 29 CFR 1910.120, Subpart H – The Handling and Storing of Hazardous Materials (chemicals, compressed air, acetylene, etc). When handling the hazardous material the following must be accomplished:
Compressed gases – training, handling, storage, use, and PPE; flammable and combustible liquids – training, handling, storage use, and PPE. Contractor’s Safety Plan shall also address:
- Training, handling, storage, use and PPE
- Explosives and blasting agents
- Dipping and coating operations
20. Handling, Storage, and Use of Flammable/Combustible Liquids: Contractor shall comply with the standards in: NFPA 30, Flammable and Combustible Liquids Code, 2008 Edition, NFPA 33 Spray Application Using Flammable or Combustible Materials, 2007 Edition, DoDI 4145.19-R-1, Storage and Materials Handling, 15 Sep 79, Chapters 5 & 6, and DoDI 4140.25-M (for POL storage).
21. Materials Handling and Storage: Contractor shall comply with the standards in: 29 CFR 1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H & N and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:
- Storage and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .