F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 1
PERFORMANCE-BASED WORK SPECIFICATION (PWS)
FOR THE REPAIR OF HOWELL INSTRUMENTS COMPONENTS
Purchase Request: FD2060-13-00535
Date: 3 May 13
CONTENTS
SECTION TITLE PAGE
I DESCRIPTION OF SERVICES 2
II SERVICES SUMMARY 2
III GOVERNMENT FURNISHED PROPERTY & SERVICES 3
IV GENERAL INFORMATION 4
V APPENDICES 10
PREPARING ORGANIZATION:
410 SCMS/GULB
ROBINS AFB GA
Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 99-06-16). Other requests for this document shall be referred to 410th SCMS/GULB, Robins AFB GA 31098.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 2
PERFORMANCE-BASED WORK STATEMENT (PWS)
Purchase Request: FD2060-13-00535
DESCRIPTION OF SERVICES. This Performance-Based Work Statement establishes the procedures to provide repair services for Howell Instruments items listed in Appendix C. The contractor shall perform all actions necessary to return reparable items to a serviceable condition.
These components provide the necessary functions that enable the safe operation of JETCAL® Analyzers used on most USAF engines and aircraft. The contractor shall repair, test, and return each item in a serviceable condition within Turnaround Time (TAT) because on time delivery is a pertinent requirement due to critical mission operations. If or when deficiencies occur, which should be Low to None, the contractor shall expedite all efforts to rectify the errors with minimal delay or compromise of quality outcome. The contractor shall punctually deliver correct data submittals.
2.0 SERVICES SUMMARY
Performance Objective
PWS
Reference
Performance Threshold
Repair, test, and return each item in a serviceable condition within Turnaround Time (TAT)
4.3 Routine- delivered no later than ( NLT) 30 business days
after receipt of repairable or order whichever is later, 100% on time.
MICAPS - delivered NLT 15 business days after receipt of repairable or order, whichever is later, 100% on time.
SURGE– delivered NLT 15 business days after receipt of repairable or order, whichever is later, 100% on time.
Provide quality repair with low to no Product Quality Deficiency Reports (PQDR)
4.4 No more than one PQDR of total repaired assets in a
single contract year, with a goal of zero.
Submit data requirements correct and punctually
3.4, 4.6 4.15.2, 4.17.1, 4.17.2
Data reported as stipulated on DD1423 and corrective actions are taken within seven calendar days of notification of error by the Production Management Specialist Seller.
3.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, MATERIAL, and
SERVICES (GFP/GFE/GFM/GFS).
3.1 No Government Furnished Material/ Government Furnished Equipment (GFM/GFE) is authorized.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 3
3.2 The contractor shall furnish all material, support equipment, special tools, test equipment, and services required for the repair of the end item.
3.3 Reporting Loss of Government Property (APR 2012)
a. Definitions. As used in this clause— “Government property” is defined in the clause at FAR 52.245-1(a), Government Property. “Loss of Government property” means unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to—
(1) Items that cannot be found after a reasonable search;
(2) Theft;
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
“Unit acquisition cost” means—
(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and
(2) For Contractor-acquired property, the cost derived from the Contractor’s records that reflect consistently applied, generally acceptable accounting principles.
b. Reporting loss of Government property.
(1) The Contractor shall use the Defense Contract Management Agency (DCMA) eTools software application for reporting loss of Government property. Reporting value shall be at unit acquisition cost. The eTools “LTDD of Government Property” toolset can be accessed from the DCMA home page External Web Access Management application at http://www.dcma.mil/aboutetools.cfm.
(2) Unless otherwise provided for in this contract, the requirements of paragraph (b)(1) of this clause do not apply to normal and reasonable inventory adjustments, i.e., losses of low-risk consumable material such as common hardware, as agreed to by the Contractor and the Government Property Administrator. Such losses are typically a product of normal process variation. The Contractor shall ensure that its property management system provides adequate management control measures, e.g., statistical process controls, as a means of managing such variation.
(3) The Contractor shall report losses of Government property outside normal process variation, e.g., losses due to Theft; Inadequate storage; Lack of physical security; or “Acts of God.”
(4) This reporting requirement does not change any liability provisions or other reporting requirements that may exist under this contract.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 4
3.4 Commerical Asset Visibility AF (CAVAF): The contractor shall report using the Commercial Asset Visibility (CAVAF). (CDRL A001, Data Item Description, DI-MGMT- 81634B). The contractor shall provide data related to the tasks and efforts conducted for each repairable unit. If CAVAF training is required, send an email to:
406scms.cav.af.ar@robins.af.mil. The contractor shall conduct production reporting on a daily or as transactions occur basis. The contractor shall obtain a valid DoD PKI certificate to log into CAVAF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required. Data reported as stipulated on DD1423 and corrective actions are taken within seven calendar days of notification of error by the Production Management Specialist Seller.
4.0 GENERAL INFORMATION: All data shall be reported as stipulated on DD1423 and corrective actions shall be taken within seven calendar days of notification of error by the Production Management Specialist Seller. Inspect, service test, or check completed end item in accordance with applicable manufacturer's specifications.
4.1 Original design of the asset thereof, or the design functional capabilities of the various component parts shall not be changed, modified or altered unless such changes are authorized in writing by the assigned engineer at 410th SCMS/GUEA and through the Procuring Contracting Officer (PCO).
4.2 Contractor furnished material or parts used for replacement shall equal or exceed the quality of those specified in the parts list. The material or parts shall be entirely suitable for restoration of the component part for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item.
4.3 The contractor shall complete production and ship serviceable asset no later than (NLT) 30 business days for routine assets, 15 business days for MICAPS, and 15 business days for SURGE requirements. The contractor shall forward any production problems (including delays in delivery) through the Administrative Contracting Officer (ACO) and the AFSC/PZAAC, Procurement Contracting Officer (PCO), Production Management Specialist Seller, (PMS), 410th
SCMS/GULB.
4.4 The contractor shall maintain a rate of no more than one Product Quality Deficiency Reports (PQDR) of total repaired assets per contract year, with a goal of zero.
4.5 When requested, the contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, Investigation, and Resolution USAF Deficiency Reporting. These defects may be reported from field or depot organizations.
Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the contractor's Quality Program at no additional cost to the government. The contractor shall establish and maintain a program, approved by the Government Representative.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 5
4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies. The Contractor shall be required to submit all appropriate data requirements to GIDEP Government/Industry Exchange Program (GIDEP) as it is generated in accordance with the CDRL of this contract. Part, component, material, equipment, or manufacturing process deficiencies (actual or potential) shall be reported to GIDEP. The contractor shall maintain a record of the status and disposition of all Alert/Safe Alert reports.
(CDRL A002, Data Item Description, DI-QCIC-80125B, GIDEP Alert Report) and Response to an Alert/Safe Alert (CDRL A003, Data Item Description, DI-QCIC-80126B, GIDEP Alert Response).
4.7 Once an item has been determined beyond economical repair (BER), the following procedure is established to disposition the Governments assets.
4.7.1 Determination that the items are BER, shall be made by the contractor and communicated to the ACO for verification within 10 days of work start date. The contractor shall not repair any item where the total cost of parts and labor exceed 75% of the government replacement cost of the item unless authorized through the ACO to the PCO to PMS Seller. The ACO shall contact the PCO for repair or disposal instructions.
4.7.2 Once determination that the items are BER and to be destroyed, the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M, Defense Demilitarization Manual, Appendix 3, Demil Code D, by mutilation (total destruction of items and components), melting, cutting, tearing, scratching, crushing, breaking, punching, neutralizing, etc.
4.7.3 Record of destruction to include the certificate shall be retained by the contractor as evidence of disposal. Such evidence shall be maintained for the period of performance.
4.7.4 Items shall be disposed, in a manner that the parts are never to be re-issued or used.
4.8 Inventory Inspection: Visually inspect each item received to determine proper identification, completeness, and condition. Report to the ACO any discrepancies, missing, or incomplete parts.
4.9 Preservation: Upon receipt of equipment, contractor shall provide adequate preservation necessary to protect the equipment while in storage prior to being placed in work. Any oil, grease, lubricants, and any special preservatives required to protect the equipment shall meet specifications IAW T.O. 1-1-689-1, Cleaning and Corrosion Control, Volume I Corrosion Program and Corrosion Theory.
4.10 Finishing.
4.10.1 Replace damaged, illegible, or missing instruction or data plates.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 6
4.10.2 Permanently and legibly mark each repaired end item with the contractor’s identification. This identification shall include the contractor’s name, the Air Force contract number, and date of repair and shall be affixed to the end item by decal or similar permanent means.
4.10.3 All painted portions of the end item shall be inspected to determine if repaint is required. Loose and scaled paint shall be removed. All bare metal surfaces shall receive corrosion treatment prior to application of primer and paint. Severely marred surfaces shall be repainted. Application of primer and paint shall be IAW T.O. 1-1-8, Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment.
4.10.4 Upon completion of final tests and government inspection and acceptance, seal all ports, vents and openings with plugs, caps, and plates or enclose in a sealed plastic bag, as applicable, to prevent the entry of foreign matter. Install plugs and caps that meet the requirements for any electrical connectors to prevent damage during handling and shipment.
4.11 Performance of Service During Crisis The Functional Commander/Director has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DoDI 1100.22, Policy and Procedures for Determining Workforce Mix and DFARS 237.76, Continuation of Essential Contractor Services.
4.12 Inspection of Services Clause: The Federal Acquisition Regulation (FAR) 52.246-4, Inspection of Services - Fixed Price, gives the Government the right to inspect Contractor Performance.
4.13 Green Procurement Program (GPP) GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using U. S. Government appropriated funds, including services and new requirements. FAR 23.404(b), Agency Affirmative Procurement Program, applies and states the GPP requires 100% of EPA designated product purchases that are included in the Comprehensive Procurement Guidelines (CPG) list that contains recovered materials, unless the item cannot be acquired: (a) competitively within a reasonable timeframe; (b) meet appropriate performance standards, or (c) at a reasonable price. The prime contractor shall be responsible for ensuring that all subcontractors comply with this requirement.
4.14 Security Requirements (UNCLASSIFIED)
4.14.1 General: Actual knowledge of, generation, or production of classified information is not required for performance of the contract.
4.14.2 Employee Clearances: Contractor employees that need access to Government owned Automated Information Systems (AIS) will require the minimum of a Favorable National
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 7
Agency Check (NAC). Submit a Standard Form 85P, Questionnaire for Public Trust Positions, (fingerprint cards if available) to the 638 SCMG/OMOS Security Office, 235 Byron, Ste 19A, Robins AFB GA 31098 for processing.
4.14.3 Security Incidents and Violations: The contractor shall immediately notify the 638 SCMG/OMOS Security Office of any actual security violation, security incident, or of any indication of a potential unauthorized disclosure or compromise of classified or sensitive but unclassified information.
4.15 Safety Requirements: The contractor shall comply 100 percent of the time.
4.15.1 Contractor Compliance. Contractors shall comply with Occupational Safety and Health Act (OSHA) Public Law 91-596, OSHA Standard 29 CFR 1910, and OSHA Standard 29 CFR 1925 for the protection of their employees. To ensure the protection of Air Force personnel, assets and interests, the contractor shall be solely responsible for compliance with all federal, state and local laws, codes, ordinances, regulations, the Occupational, Safety and Health Act (Public Law 91-596) and the resulting OSHA Standards 29 CFR 1910 and OSHA Standards 29 CFR 1925, all Air Force Occupational Safety and Health (AFOSH) Standards, and any applicable local guidance. The contractor shall establish and maintain a safety and health program. The Air Force is part of the OSHA Voluntary Protection Program (VPP).
All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html.
4.15.2 Mishap Notification: The contractor shall telephonically notify the Safety office within four (4) hours of all mishaps or incidents to DoD property entrusted by this contract operation. No more than one instance of late mishap notification per calendar year is acceptable. Follow all other reporting requirements as identified on the DD1423, CDRL A004 for Accident/Incident Report (Mishap Notification & Reporting) Data Acquisition Document Number DI-SAFT-81563.
4.15.3 Mishap Investigation. If requested by the Government Procuring Contracting Officer (PCO) or Administrative Contracting Officer (ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenances and training records until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is completed.
4.16 Packaging and Transportation: (MIL-STD-2073-1d, 10 May 02, Standard Practice for Military Packaging and MIL-STD-129P (4), 19 Sep 07, Military Marking for Shipment and Storage). When shipping containers are received that meet the requirements of the AFMC Form 158, Packaging Requirements, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with Governement Furnished Material (GFM) containers that meet the requirements of the AFMC Form 158, Packaging Requirements.
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 8
4.17 Item Unique Identification (IUID) Requirements: The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS).
All assets subject to marking must be recorded in the DoD IUID Registry.
4.17.1 IUID Marking Plan. The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by 410 SCMS/GUEA engineer prior to implementation. .(DI-MGMT-81803, CDRL A005).
4.17.2 IUID Marking Activity And Verification Report. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.
(DI-MGMT-81804, CDRL A006)
4.18 Contractor Manpower Reporting Requirements. Per reference SAF/AQ Memo, 13 Nov 12, the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The contractor shall completely fill in all required data fields at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement). Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
4.18.1 *Reporting Period: The Contractor shall input data by 31 October of each year.
4.18.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
4.18.3 User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the CMRA link at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement).
4.19 Procedure For Invoicing/Payment/Acceptance: The multi-functional team (MFT requests that data items be attached to acceptance forms through Wide Area Work Flow (WAWF). To allow for payment of separately priced data items, the MFT must use WAWF for acceptance. However, both separately priced and non-separately priced items must be accepted
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 9 in WAWF in order for the line item to be closed out in the contract. Information regarding Wide Area Work Flow-Receipt and Acceptance is available on the Internet at https://wawf.ef.mil.
5.0 APPENDICES:
Appendix A: References
Name of Publication Sections that Apply
Date of Publication
Title of Publication
MIL-STD-129P
With Change 4 Entire 19 Sep 07 Military Marking for Shipment and Storage
MIL-STD-130 Entire 17 Dec 07 DoD Standard Practice Identification Marking of US Military Property
DFARS 252.211–7003 Entire Jun 2011 Item Identification and Valuation
MIL-STD-2073-1d Entire 10 May 02 Standard Practice for Military Packaging
DFARS 237.76 Entire 24 Nov 10 Continuation of Essential Contractor Services DoDI 1100.22 Entire 12 Apr 10 Policy and Procedures for Determining Workforce
Mix.
FAR 23.404 Paragraph “b” 1 Oct 10 Agency Affirmative Procurement Program
OSHA Public Law 91-596
Entire 1 Jan 04 Occupational Safety and Health Act (OSHA) of
Occupational Safety And Health Standards
Part 1910 1 Jan 04 Occupational Safety and Health Act (OSHA) of
Safety and Health Regulations for Service Contracts
Part 1925 30 Dec 71 Occupational Safety and Health Act (OSHA) of
DoD 4100.39-M Entire May 2010 & Chg Ltr Oct 2010
Federal Logistics Information System
T.O. 00-35D-54
Entire Document
1 May 07 USAF Deficiency Reporting, Investigation, and Resolution
FAR 52.245-1
Entire Aug 2010 Government Property
FAR 52.246-4 Entire Aug 1996 Inspection of Services-Fixed Price
DoD 4160.21-M Appendix 3 14 Feb 97 Defense Demilitarization Manual
T.O. 1-1-689-1 Entire 01 Mar 05 Cleaning and Corrosion Control, Volume I Corrosion Control and Corrosion Theory
T.O. 1-1-8 Entire 12 Jan 10 Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment
F D 2 0 6 0 - 1 3 - 0 0 5 3 5 P W S Page 10
APPENDIX B
List of Applicable Terms
CAVAF – Commercial Asset Visibility data reporting system.
Mission Incapable (MICAP) – An asset that has caused an aircraft platform to be mission incapable.
Surge of exchangeable - The process by which increased requirements generated by external contingency demands are supported during wartime. Exchangeable surge includes increasing shop production above the level that can normally be produced by available peacetime resource levels, expedited contract actions, and other options for support that would not be authorized under peacetime operations.
Quality Deficiency – Attributed to errors in workmanship, nonconformance to specifications (initial failure), drawing standards, or other technical functional requirements, Product Quality Deficiency Reports are known as PQDRs.
Quality of Service – Repair provided continues to maintain reduced numbers of Quality Deficiency Reports.
Routine exchangeable repairs – Repair of routine Government requirements other than MICAP and Surge.
APPENDIX C
List of Howell Instruments NSNs
NSN Part No. Next Higher Assembly
5998‐01‐071‐8428 BH19993‐1 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐072‐2441 BH19998‐1 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐087‐7777 BH19996‐2 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐087‐7775 BH19994‐2 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐072‐2412 BH19999‐1 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐087‐7778 BH19997‐2 H301‐1,H302‐2,H301‐3,H301‐4
5998‐01‐297‐7684 BH26685‐1 BH112JB‐77
5998‐01‐300‐9618 BH26573‐1 BH112JB‐77, BH112JD‐80, H338S‐822
5998‐01‐365‐6058 BH27443‐1 BH112JD‐80
6130‐01‐586‐6003 BH27171‐8 BH112JD‐80