PR: FD2060-20-30513 QASP REVISION: 0 1

Quality Assurance Surveillance Plan for

NP2000 Propeller System and Electronic Propeller Control System (EPCS)

Purchase Request: FD2060-20-30513

Date QAPC signs QASP.

PR: FD2060-20-30513 QASP REVISION: 0 2

1.0 Purpose

This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:

What will be monitored How monitoring will take place Who will conduct the monitoring How monitoring efforts and results will be documented

1.1 The contractor is responsible for implementing and delivering performance that meets contract standards using its own quality control plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to ensure that it meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

1.2 The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

Copies of the QASP and any revisions shall be provided to the contractor and the Contracting Officer's Representative (COR) to facilitate implementation of surveillance activities. In addition, the QASP should recognize and accommodate unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor.

1.3 Objective(s)

The C-130 System Program Office (SPO) has a requirement for the repair and production of C- 130H’s NP2000 eight-blade propeller Depot Level Reparable (DLR) items. UTAS Hamilton- Sundstrand (HS) is the Original Equipment Manufacturer (OEM) and is the owner of all the proprietary rights for the NP2000 system. Installation of the NP2000 propeller system on C- 130H aircraft has already begun and, once complete, will become the predominant propeller system for the USAF C-130H fleet. The NP2000 system, which includes the incorporation of the Electronic Propeller Control System (EPCS) components, replaces the current four-blade variant. This includes those components currently fielded and in production for the Department of Defense community.

The required support is for repair, production, modification, engineering technical services and demilitarization for the NP2K and EPCS. This includes all provisions of personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other non-personal services necessary to sustain the NP2K and EPCS.

PR: FD2060-20-30513 QASP REVISION: 0 3

1.4 Result(s)

The QASP is used for managing contractor performance assessment by ensuring that systematic quality assurance methods validate that contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards specified in the PWS. It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document contractor performance results to determine if the contractor has met the required performance standards for each objective in the PWS. Successful completion of the objectives for the performance of the contract constitutes success of the program.

1.5 Authority

Generally, Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. If commercial, quality assurance will be applied in accordance with commercial items clause.

2.0 Assessment Management

2.1 Services Summary

Performance Objective PWS Reference Performance Threshold Method of Surveillance

LRU Repair Turn- Around-Time (TAT)

4.3.2 TAT=40 business days or

less.

Surveillance will be conducted Monthly by the COR or designated MFT memberby confirming delivery & receipt

Maintain quality program

4.8

The Contractor shall maintain a quality program that meets or exceeds the requirements of ISO 9001:2019 or equivalent and results in no more than one (1) Quality Deficiency Report per year where the contractor is deemed to be at fault.

Surveillance will be conducted, by Equipment

Specialist reviewing Product Quality Deficiency Report (PQDR) through the JDRS system upon receipt.

Provide timely and accurate reporting in Commercial Asset

Visibility – Air Force.

4.2.3

The Contractor shall accomplish all Commercial

Asset Visibility – Air Force transactions daily or as transactions occur basis with zero (0) deficiencies.

Surveillance will be conducted, at a minimum, Monthly by the COR or delegated MFT member monitoring

CAV-AF.

PR: FD2060-20-30513 QASP REVISION: 0 4

2.2 COR Online File Documentation

The COR will establish and maintain an online file containing training and surveillance documentation in the Procurement Integrated Enterprise Environment (PIEE) via the Joint Appointment Module (JAM) and Surveillance and Performance Module (SPM). At a minimum, the following documentation will be maintained in JAM/SPM by the COR or PCO as applicable.

a. COR INFORMATION (COR Profile):

Training and Appointment:

DAU CLC 222 Contracting Officers Representative (COR) Online Training DAU CLM 003 Overview of Acquisition Ethics DoD Combatting Trafficking in Persons for Acquisition & Contracting Professionals Wide Area Workflow training/iRAPT Overview

Provide accurate and timely delivery of

Contract Data Requirements List

(CDRL)

data/documents.

4.2.3 thru

4.2.8.1 and

5.10

The Contractor shall provide material accurate and timely delivery of Contract Data

Requirements List data/documents with no more than one late submission of data/document(s) per contract year or any with more than three (3) minor or zero (0) major material deficiencies. The Contractor shall notify the Government if the delivery will not meet the scheduled delivery date and negotiate a revised delivery date.

The data/document shall be delivered by a revised delivery date acceptable to the Government.

Surveillance will be conducted by the appropriate

MFT member COR or delegated MFT member reviewing deliverables upon receipt.

documented, at a minimum, monthly by the COR in the

PAR.

Establish and maintain

Contractor Manpower Reporting.

5.8

Within 30 calendar days of contract/order award, the

Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data and submit the annual report no later than October 31 of the following fiscal year.

Surveillance will be conducted by the COR monitoring eCMRA.

documented monthly by the COR in the PAR.

PR: FD2060-20-30513 QASP REVISION: 0 5

QAPC-Led Training (Level C) Contract-Specific Training Refresher training

b. QASP

c. Designation of Contracting Officer’s Representative

d. Annual COR File Inspection Checklist(s)

e. COR ONLINE FILE:

i. COR Status Reports/Surveillance:

PAR(s) CAR(s)

ii. COR Trip Reports (if applicable):

iii. COR Correspondence Reports:

Meeting Minutes Contractor correspondence

iv. Miscellaneous Documents:

Contract, including modifications (if not in EDA) PWS, including revisions (if not in EDA) Amended QASP DD Form 254 (if not in EDA) CDRL(s) (if not in EDA) CDRL/Deliverables (if not in WAWF) Contractor Safety Plan Applicable status report(s) Master/Delivery Schedules Customer Complaint Records CAV-AF Repair Item Actions Report(s) iRAPT report(s) and/or other documentation of Contractor payment (if not in WAWF)

2.3 Plan for Corrective Action

2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative PAR. The COR will set a suspense date and forward the PAR to the PCO for submission to the Contractor.

The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date. The COR will upload the PAR in the CORT Tool under COR Status Reports.

PR: FD2060-20-30513 QASP REVISION: 0 6

2.3.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will initiate the CAR process.

However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the MFT by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT.

The COR will upload the CAR in the CORT Tool under COR Status Reports. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

2.3.3 CORs shall establish a tracking system for corrective actions that includes date COR submitted CAR to PM/FSM, date reviewed by PM/FSM, date reviewed by CO, date issued by CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date. In accordance with AFI 63-138, dated 11 May 2017.

2.4 Acceptance of Services

2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF). Services will be accepted by the COR.

2.4.2. CDRL deliverables shall be submitted using WAWF and directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.

3.0 Roles and Responsibilities of Multi-Functional Team (MFT)

NAME TITLE

Willie Williams Mods Section Supervisor

Lt Jordan Hanlin Program Manager

LaTonya Jones Program Manager Support

Carl Leslie Senior Procurement Officer

Benedicte Foulle Aviation Support Program Office

Laura Dietrich Contract Admin and Project Support

Todd Rissmiller Contracting Officer

James (Mike) Fisher Mechanical Engineer

PR: FD2060-20-30513 QASP REVISION: 0 7

James (Jim) Roberts Equipment Specialist

Anna Hancock Financial Management Specialist

Rose Gyampo Cost Analyst

Dave Broderick Project Manager

Jane Pemberton Contracts Administrator

Duane Johnson Deputy Program Manager

Jeff Gelzer Program Manager

Walter Hallman ANG LC-130 Modernization Manager

Krista Hunt USN C/KC-130T Systems Lead

Lawrence Haftel USN C-130 Senior Logistician

Craig Ransaw C-130 Logistics Manager

Scott Hudson C-130H Training System Manger

John Desbien AFRC Weapon System Manager

Shaun Coleman SCOS Weapon System Management Team

3.1 General Responsibilities

3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s) Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.

3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure Government requirements including quality of services, cost and schedule are met. The MFT will provide the results of their surveillance to the Contracting Officer’s Representative (COR) for input into the Performance Assessment Report (PAR) and to the MFT member updating the Contractor Performance Assessment Reporting System (CPARS).

3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors Quality Management System (QMS) that tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality directly relates to the CPARS category of “Quality”.

3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, PR: FD2060-20-30513 QASP REVISION: 0 8 and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.

3.2 Contracting Officer’s Representative (COR)

3.2.1 Registers in PIEE as a COR. Self-nominates in JAM as the designated COR for the contract. If required, files an Office of Government Ethics (OGE) Form 450, Confidential Financial Disclosure Report. Establishes and maintains an online file containing training and surveillance documentation in JAM/SPM.

3.2.2 Registers for an Enterprise Contractor Manpower Reporting Application (eCMRA) account after designation as a COR. No later than 60 calendar days after contract/order award, verifies the Contractor has established a record for the contract/order in eCMRA. Reviews and, if required, corrects the Contractor record (Order Data, Contact Data, Location Data, etc.). Enters the National Defense Authorization Act (NDAA) Elements and the Fund Cite Data. Verifies the Contractor has reported all data for each fiscal year, including an annual count of contractor/subcontractor personnel performing services and the total of contractor/subcontractor labor hours, no later than October 31 of the following fiscal year.

3.2.3 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the Procuring Contracting Officer (PCO). Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met. Develop an inspection schedule that shall comprise of at least ten percent of non-services summary items, but no more than twenty percent. Monitors control and disposition of Government property. Monitors Contractor payment and verifies it is commensurate with Contractor performance. Documents Contractor performance via PARs, Corrective Action Report(s) (CAR), etc. Issues PARs, at a minimum, quarterly and negative PAR(s) or CAR(s) as required.

3.2.4 Ensure contractor’s accepted Quality Management System (QMS) complies with contract requirements. In post award, CORs need to place special emphasis in ensuring the contractor’s QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.

3.3 Contracting Officer’s Representative (COR) Supervisor

3.3.1 Upon PCO request for COR support, selects a qualified nominee. Confirms the COR nominee has no personal conflicts of interest with performing the responsibilities to be delegated by the PCO. Verifies the COR nominee has the appropriate clearance for the contract/order. If required, ensures the COR nominee files an OGE Form 450. Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 16 hours of refresher training every three years after completion of the QAPC-Led Training.

PR: FD2060-20-30513 QASP REVISION: 0 9

3.3.2 Registers as Manager via SPM.

3.3.3 Ensures the COR registers in WAWF as a CORT Tool user. Ensures the COR self-nominates as the designated COR for the contract in the CORT Tool. Upon notification of the COR self-nomination, approves the nomination in the CORT Tool. Reviews the COR Profile and COR Online File, at a minimum, annually. Considers performance of COR duties in their appraisal.

3.4 Procuring Contracting Officer (PCO)

3.4.1 Only individual authorized to enter into contracts for supplies and/or services by obligating the Government. Determines if a COR is required to conduct/document surveillance of Contractor performance. If the requiring activity has not initiated a COR nomination in the CORT Tool, submits a Request for Contracting Officer’s Representative Support memorandum to the requiring activity. Determines whether a COR is required to file an OGE Form 450.

Provides Contract-Specific Training to the COR.

3.4.2. Upon notification of COR Supervisor approval of the COR self-nomination, approves the nomination in JAM. Before contract/order award, generates a Designation of Contracting Officer’s Representative memorandum to the COR and Contractor via JAM through use of the identified Smart Form. The Designation memorandum ensures the Contractor is notified of the COR assigned to the contract/order and their areas of responsibility and limitation of authority.

Upon transfer/termination of the COR, issues a Revocation (Termination) of Designation of Contracting Officer’s Representative memorandum in JAM.

3.4.3 Reviews the COR reports on Contractor performance in SPM. Approves/Rejects PARS and any CAR(s). Reviews the COR Profile and COR Online File, at a minimum, annually.

Documents the results of their review on the Annual COR File Inspection Checklist and uploads to SPM under Surveillance Documents (Category “Miscellaneous”, Subcategory “Other”, Label the document “Annual COR File Inspection Checklist”). Checklist must be signed by the PCO, COR, and COR Supervisor prior to uploading to SPM.

3.5 Quality Assurance Program Coordinator (QAPC)

3.5.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management [e.g., FC/FD. COR supervisor, etc.

3.5.2 Provides functional, not technical, support for JAM/SPM users including assistance with registration and role activation. Monitors records of COR and COR management training in

JAM/SPM.

3.6 Contractor

PR: FD2060-20-30513 QASP REVISION: 0 10

3.6.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or Sole Source Justification (SSJ) if the acquisition is sole source and upon contract/order award if it is competitive.

3.6.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

3.6.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.

3.6.4 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

3.6.5 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

3.6.6 Establishes a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. Enters Order Data, Contact Data and Location Data. Provides an annual count of contractor/subcontractor personnel performing services for each fiscal year if the Department of Defense (DoD) is the requiring activity, if the acquisition is using United States (U.S.) Government appropriated funds, and if the acquisition is in excess of $3,000,000.00.

Reports all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract/order for each fiscal year in eCMRA.

3.7 Functional Commander/Functional Director (FC/FD)

The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis. Reference PWS and QASP signature page.

4.0 Management Strategy

PR: FD2060-20-30513 QASP REVISION: 0 11

4.1 The MFT will meet and record minutes quarterly to review contractor’s performance. The COR will issue PARs, documenting both satisfactory and unsatisfactory Contractor performance, at a minimum, monthly. The COR will forward the PAR to the PCO for submission to the Contractor. The PCO will submit the PAR to the Contractor. The Contractor shall sign and return a positive PAR to the PCO within five business days. The COR will upload the PAR in the CORT Tool under COR Status Reports. Unsatisfactory Contractor performance will result in the COR issuing a negative PAR.

4.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will issue a CAR. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory Contractor performance, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

4.3 Incentives

4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance, favorable CPARs and exercising options.

4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order.

5.0 Initial Contract Performance Review (30-Day Review): The MFT is responsible for conducting an Initial Contract Performance Review. The review is a determination by the MFT that the Contractor has successfully started performance, has completed transition, is fully operational, and is within the estimated cost, schedule and performance parameters of the contract/order. The review will take place within 30 calendar days after the Contractor assumes full performance responsibility. For acquisitions greater than or equal to one hundred million dollars ($100,000,000.00), results of the review will be reported to the Services Designation Official (SDO). The COR will upload the review in the CORT Tool under Miscellaneous Documents.

6.0 Annual COR Online File Inspection: The COR, the COR Supervisor and the PCO will review the COR Profile and COR Online File, at a minimum, annually. The PCO will document the results of their review on the Annual COR File Inspection Checklist. After the COR and COR supervisor sign the checklist, the PCO will upload the checklist in the CORT Tool under Annual COR File Inspection Checklist.

7.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

PR: FD2060-20-30513 QASP REVISION: 0 12

7.1 The MFT will evaluate Contractor performance. The COR will, at a minimum, review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.

7.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the Contracting Officer will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via

CPARS.

7.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.

Performance Rating

Criteria

Exceptional

Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good

Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal

Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

8.0 Safety Requirements

8.1 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.

The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone

PR: FD2060-20-30513 QASP REVISION: 0 13

within ___5__ business hours. The Contractor shall cooperate with Government safety investigations.

8.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR. The COR will monitor Contractor reporting and review any mishap notifications. The COR will address safety and/or health issues in the PAR or in a CAR as applicable.

9.0 Trafficking in Persons: The MFT must inform the PCO if the contractor/subcontractor fails to comply with the requirements of FAR 52.222.50, Combating Trafficking in Persons. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of the Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).

PR: FD2060-20-30513 QASP REVISION: 0 14

10.0 Signatures

By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.

QAPC, Office Symbol Date

COR Date

COR Supervisor Date

PCO Date

Contractor Date

By signing below, you are identifying that these services are not mission-essential.

FC/FD Date