Moving_and_Storage_PWS_5_Feb_14.pdf
PDF 2 MB Posted
- Solicitation number
- FA8501-14-R-0005
About this file
Performance Work Statement (PWS)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROVISION_252_209-7999_(2).pdf | ||
| Exhibit_A_Pricing_Schedule_REVISED_15_APR_14.xlsx | XLSX spreadsheet | |
| Moving_and_Storage_QASP_23_Jan_14.pdf | ||
| Wage_Determination_for_moving.pdf | ||
| Solicitation_Drayage_Final.pdf | ||
| CRDLs_signed_dec_2013.pdf | ||
| Exhibit_A_Pricing_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT FOR PACKING, CONTAINERIZATION AND
LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM) PERSONAL
PROPERTY SHIPMENTS
Section 1 – Description of Services
Scope of Work
The contractor shall furnish all personnel, equipment, facilities, supplies, services and materials, except as specified in Section 3 as Government-Furnished Property (GFP), for the preparation of personal property of Department of Defense (DOD) personnel for shipment and/or storage and related services through the DPM.
Work to be performed shall be those services in the Schedules awarded to the contractor as outlined in individual Contract Line Item Number (CLIN) items. Tasks by type of move are reflected in Table G-1.
Task/Type of Move Matrix, showing which tasks normally apply to each type of move. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable.
1. Premove Survey. The contractor shall determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the member/employee. The survey shall be conducted at a time and date mutually agreed upon between the contractor and the member/employee. Any pack/pickup date changes shall be coordinated with the ordering officer at Joint Personal Property Shipping Office-South Central (JPPSO-SC) in San Antonio, Texas and the Quality Control (QC) section at Robins AFB, Georgia is to be notified of the changes.
2. Weighing.
a. The gross, tare, and net weight of all shipments shall be determined through the use of scales properly certified by a state inspector of weights and measures In Accordance With (IAW) the regulations of the state or district having legal jurisdiction over the scales. Personnel designated to operate the scales shall be licensed or otherwise qualified as weigh masters if required by the state, commonwealth, or district. When a metric scale is utilized, the contractor shall use 1 kilogram per
2.2 pounds for conversion.
b. The contractor shall submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW federal, state, and commonwealth or district regulations to the ordering officer at JPPSO-SC with documentation (Contract Data Requirements List (CDRL) A002).
c. When scales are not available or use is not practical, the application of a constructive weight of seven pounds per cubic foot shall be used provided prior written approval is obtained from the Robins AFB Personal Property Processing Officer (Robins-PPPO). (See paragraph A.2.d for constructive weight of professional books, papers, and equipment (PBP&E) also known as PRO or PRO-Gear).
d. When PBP&E are included as part of the shipment, the weight of each item individually described on the inventory shall be entered on the same line of the inventory next to the description. The total weight of such articles shall be annotated separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the contractor to weigh the items at the time of packing and pickup, and there is cube indicated on the inventory, a constructive weight of 40 pounds per cubic foot shall be used for PBP&E.
e. The weight tickets shall contain the name and address of the weighing station, the date, name of contractor, van or trailer number, name of member/employee, call number assigned by the JPPSO- SC ordering officer, and signature of the weigh master.
f. For inbound personal property, the contractor shall bill on the origin net weights obtained from the Personal Property Government Bill of Lading/Bill of Lading (PPGBL/BL) or other movement document and need not submit a weight certificate, unless a reweigh is ordered. When a reweigh is ordered, the contractor shall bill on the reweigh weight.
g. If the PPGBL/BL, movement document, or container does not reflect the net weight for inbound shipments or if the PPGBL/BL is unavailable at the destination, the contractor shall bill on the origin gross weights obtained from the PPGBL/BL, or other available sources, such as containers or supporting documentation. The contractor shall use all means available (containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, the contractor is paid for the gross weight based on the net weight bid price.
h. The contractor shall perform reweigh services when ordered. The reweigh shall normally be requested at the time the delivery order is placed and shall be performed IAW instructions set forth in Para A.2.a. When so advised by the ordering officer at JPPSO-SC, a designated representative of Robins-PPPO or the member/employee shall be permitted to accompany, in a separate conveyance, the contractor to witness the reweigh. This would be at no extra charge and the contractor would not provide the separate conveyance.
i. When a reweigh is ordered, the contractor shall furnish the ordering officer at JPPSO-SC weight tickets within seven workdays of completion of the service.
j. When the weighing of a shipment at origin is witnessed by the Robins-PPPO representative, the back of all copies of the weight ticket shall be annotated with the statement “weight observed” and verified by the signature of the representative. The number 7 copy of the PPGBL/BL (property received copy) shall be similarly annotated prior to mailing to the destination PPSO. When computer generated PPGBL/BLs are used, the copy going to the destination PPSO shall be annotated.
k. Billing Procedures. For Continental United States (CONUS) activities, to include Hawaii and Alaska, shipments are payable on the basis of 100-pound minimum weight for unaccompanied baggage (UB) and a 500-pound minimum weight for household goods (HHG), net or gross weight, as indicated in the bid item. For overseas activities, excluding Hawaii and Alaska, shipments are payable on the actual net weight shipped.
l. Actual pieces, weight, and cube of UB shipments shall be provided to JPPSO-SC prior to the issuance of the PPGBL/BL.
3. Time Requirements.
a. The ordering officer at JPPSO-SC shall normally give the contractor notice to commence services ordered herein at least one full workday prior to the date specified. Oral orders shall be confirmed in writing within two workdays following order acceptance by the contractor. The contractor shall be available to receive orders between the hours 0800 and 1700. Upon request, the contractor shall provide information as to whether the service shall be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available.
b. In unusual situations, it may be necessary for the ordering officer at JPPSO-SC to request performance of services at specified times or days. When services are ordered for other than normal duty days and hours, then overtime charges are applicable under Attachment G3, Schedule I, , Item 0014, Additional Services.
c. In some cases, contractor shall need to provide pickup on the day of notification. These shipments are known as ‘sundowners’ and are small shipments for personnel that are being discharged from the armed forces with a requirement to be off the base property by a specified time. Companies shall need to ensure that once notified of a ‘sundowner’ shipment, they can pick up this shipment within 2 hours. Robins-PPPO estimates, on average, 6 (six) ‘sundowner’ shipments annually.
d. The contractor shall not begin pickup or delivery services at a member/employee’s residence before 0800 hours or after 1700 hours without prior approval of the ordering officer and the member/employee. The contractor shall not begin any service that shall not allow completion by 2100 hours without approval by the ordering officer and the member/employee by 1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the contractor shall notify the ordering officer and the member/employee. In case of an approved suspension of operations, the contractor must assure his/her return the next workday at 0800 hours to complete the services.
e. If containerization is ordered at the contractor’s facility, the HHG or UB shall be picked up on the date and within the hours specified. Unless a longer period is authorized by the ordering office, the maximum containerization time allowed at the contractor’s facility shall be three workdays following the specified pickup date for HHG and two workdays following the specified pickup date for UB.
f. The contractor shall accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The contractor shall notify the JPPSO-SC ordering officer upon arrival of a shipment but not later than 1200 hours of the next workday.
Delivery shall be affected within three workdays following the date of the contractor’s arrival notification unless otherwise specified. For shipments in storage, the contractor shall affect delivery to the residence within three workdays following notification for delivery by the JPPSO-SC ordering officer (e.g., ordering officer calls on Monday, personal property shall be delivered on or before Thursday). The contractor shall not deviate from the specified delivery date unless approved by the JPPSO-SC ordering officer.
4. Preparation, Packing, Loading, and Containerization
**NOTE: No more than three percent of total number of shipments is incorrectly packed / loaded / containerized per month**
a. Personal property shall be prepared, packed, loaded, and containerized for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). It is the contractor’s responsibility to coordinate with the JPPSO-SC ordering officer container size and configuration for each mode of shipment prior to packing containers.
b. The contractor shall perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. All shipments shall be protected from the elements (rain, snow, sun,) and theft at all times.
1) Items of unusual nature may require disassembly service by a third party. The contractor shall not arrange for third party servicing without the authorization of the Robins-PPPO ordering officer. The charges for third party service shall be billed by the contractor as a separate charge on the invoice and supported with two copies of the third party Company’s invoice. Examples of such items are: Shranks, wall units, grandfather clocks, and grand pianos.
2) The contractor shall not be required to disassemble swing sets, outdoor recreation equipment, television and radio antennas, and similar articles. The member/employee shall disassemble these items. Items disassembled by the member/employee shall be shown in the remarks section of the inventory as Disassembled by Owner (DBO).
3) Member/Employee Packed Items. Items already packed by the member/employee shall be inspected and repacked by the contractor, with the exception of Attachment G3, Schedule I, Item 0006, Outbound Service-Unaccompanied Baggage Packed by Member/Employee and Item 0007, Outbound Service-Unaccompanied Baggage Packed by Member/Employee-Consolidated Shipments/Government Facility. The contractor assumes liability for whatever they pack. The contractor has the right to inspect all items and shall use the appropriate carton(s) to pack all items (i.e., clothes in wardrobe boxes) thereby afford items the proper protection. Robins-PPPO shall ensure that items are shipped in sealed cartons for stacking in trucks/crates and to avoid pilferage. Therefore, one of two things shall occur:
(a) The contractor shall pack all contents in cartons and stack empty plastic totes or tubs separately for onward movement, or
(b) The member/employee shall provide an already-packed tote/tub. The contractor shall inspect and decide the following:
1) Empty the tote/tub and place its contents in a carton, or
2) Ship the tote/tub as is with contents. It shall be the contractor’s responsibility to place the tote/tub in a proper carton or container for safe movement. Tape may not be placed directly on the tote/tub.
(c) The above decision is at the contractor’s discretion. Members/employees cannot insist that the above contents must remain in the tote/tub since the contractor assumes liability for the tote/tub and the contents.
4) Trunks and Footlockers. Trunks and footlockers may contain a properly packed quantity of HHG that is reasonable for the construction and condition of the container.
c. When the JPPSO-SC ordering officer authorizes tailgating, the load shall not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The tailgated items shall be protected from inclement weather by a suitable covering.
d. Containerization. Containerization of outbound HHG and UB shall be done at the member’s/employee’s residence, unless otherwise authorized by the Robins-PPPO ordering officer.
The contractor shall perform all exterior containerization services as prescribed in Paragraph A.7 for the type of articles, destination, and method of shipment designated by the JPPSO-SC ordering officer.
(1) Firearms. When firearms are included in containerized shipments, they shall be placed in the number one container in such a manner to permit easy withdrawal for inspection. Make, model, caliber or gauge, and serial number of the firearm shall be listed on the inventory form (See Paragraph A.5.c.)
(2) Boats. Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The contractor shall be required to accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than 500 pounds in weight from a member/employee. Employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van (e.g., canoe, kayak, rowboat, and outboard/inboard motorboat [14 ft or less]). Components and boat accessories that does not fit into an American Society for Testing and Materials (ASTM) D4169-01, Standard Practice for Performance Testing of Shipping Containers and Systems or Military Traffic Management Command (SDDC) Pamphlet 55-12, Transportation and Travel Commercial Containers for Department of Defense Household Goods Shipments container shall be containerized IAW ASTM-6251/D6251M-01, Standard Specification for Wood-Cleated Panelboard Shipping Boxes.
The member/employee shall be responsible for any special crating or materials needed to move the boat by DPM.
e. Security Seals. All exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, shall be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the Robins-PPPO. Sealing shall be completed prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number.
Two seals, as a minimum, for UB, shall be used per box and seals shall secure the access overlap top and ends. If only two seals out of a set of four are used, the seals not used must be destroyed at the time of sealing or given to the member/employee. Four seals, as a minimum, on HHG, shall be used per box and seals shall secure the access overlap door and side panels.
f. Removal of Debris. The contractor shall ensure packing and loading at the origin shall include, as a minimum, removing from the member’s/employee’s residence all empty contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the member/employee in writing.
5. Tagging, Inventorying, and Packing List. The contractor, in coordination with the member/employee, shall prepare an accurate, legible, HHG/UB descriptive inventory similar to Figure G1-1, Household Goods Descriptive Inventory. The contractor shall count and examine all goods tendered for shipments, receipt for them, and make written exception for any goods not in apparent good order. All tagging shall be accomplished prior to the removal of goods from the residence.
a. Inventory Identification. The contractor shall mark the invenory to indicate the general contents and member’s/employees last name. Each carton shall be tagged and inventoried as a separate inventory line item. Identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.
b. Inventory Symbols. The contractor shall use the “Exception Symbols” and “Location Symbols,” as shown in Figure G1-1, to describe locations and exceptions. Locations and exceptions shall be true and accurate. The omission of exception symbols shall indicate good condition except for normal wear. Describe in as much detail as possible items of furniture; for example, television sets shall be identified as being either “color” (C) or “black and white” (B&W) and console or portable. The contractor shall annotate on the inventory item(s) such as TVs, stereo components, computer hardware, VCRs, video cameras by make, model, and serial number when these are visible on the outside of the item.
c. The contractor shall ensure each privately owned firearm is annotated on the inventory by make, model, caliber or gauge, and serial number.
d. For PBP&E, the contractor shall ensure that the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO 3 cubic ft., 53 lbs. These items identified by the member/employee shall be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The symbol PRO shall be used.
The total weight of the packed professional items shall be recorded on the last page of the inventory and on the packing list for outbound HHG and UB shipments.
e. The contractor shall list items disassembled by the contractor in the remarks section of the inventory as contractor disassembled (CD). Items disassembled by the member/employee shall be shown in the remarks section of the inventory as DBO. When an article is packed in an original container furnished by the member/employee, the inventory shall indicate the type of article and shall be shown as Contractor Packed (CP).
f. The contractor shall inventory motorcycles, mopeds, and motor scooters as one line items, listing the serial number, make, year, model, and odometer reading. For international shipments, ensure one copy of the title and/or registration is attached to all copies of the PPGBL/BL/Commercial Bill of Lading/Transportation Control and Movement Document (TCMD).
NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards and motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment.
g. The Robins-PPPO ordering officer can permit the contractor to partially containerize a shipment at the warehouse, each item removed from the residence shall be annotated on the inventory as Containerized Warehouse (CW).
h. Inventory Form. The inventory form shall bear the signature of the member/employee, and date signed, together with the signature of the contractor’s representative and date signed certifying to its accuracy and completeness.
i. The contractor shall prepare the inventory in five copies for outbound HHG and UB shipments and in three copies for local drayage moves. The original and all copies shall be legible and shall bear the name and complete mailing address of the contractor. The original inventory shall be furnished to the JPPSO-SC ordering officer, the contractor shall retain one copy, and one copy shall be given to the member/employee (CDRL A003, Household Goods Descriptive Inventory). For HHG and UB, the contractor shall place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the Shipment and/or Storage of Personal Property (Figure G-2B), and if an overseas shipment, one copy of the member’s/employee’s orders and customs document. Additionally, for HHG, the contractor shall place an envelope containing the following documents in an easily accessible location inside the No.
1 container: one copy of the packing list and Exception Sheet for shipments released from Non- Temporary Storage (NTS). For UB shipments, the contractor shall place one copy of the member’s/employee’s orders inside the carton prior to sealing. The member/employee shall be required to furnish all necessary copies of their orders.
j. The contractor shall annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one contractor or contractor to another. When available, use the same inventory prepared at origin to verify delivery and condition of the articles at destination.
k. Packing Lists. The contractor shall use the packing list identified in Figure G1-2, Packing List of Household Goods, or a similar format. The contracting officer shall advise the contractor as to the required packing list at the time of award. The contractor shall prepare a packing list at the time the goods are packed, noting the number of each piece, the weight, and the cubic measurement.
l. Removal from NTS. When the personal property is to be removed from NTS, the contractor shall obtain from the storage contractor two legible copies of the NTS inventory and in conjunction with the storage contractor, check each item of the storage lot IAW such inventory. If at the time each item is checked there is a difference in condition of the item from that listed on the NTS inventory, the contractor shall prepare an Exception Sheet and such differing conditions must be noted. When the contractor elects to make a new inventory, differences as to condition of individual items, as compared with the NTS inventory, shall be shown on an Exception Sheet as described above. In the event the opinions of the contractor's representative and storage contractor's representative differ as to shortages and overages or condition of an item(s), both opinions shall be listed on the Exception Sheet and separately identified as to the source. Both parties shall sign and date the Exception Sheet, each retaining a legible copy for their respective files (CDRL A004, Exception Sheet). Such an Exception Sheet shall remain an internal industry document. In the event a claim is filed, the contractor shall provide legible copies of the Exception Sheet to the claims officer.
1) Preparation of Inventories. For inventories prepared on shipments released from NTS the contractor shall indicate the same article identification and item number as on the NTS inventory or a cross-reference shall be made on the new inventory indicating the item number and identification from the NTS inventory. The use of legible photo reproductions of the storage contractor’s inventory in lieu of preparing a new inventory is permissible.
2) The contractor shall identify personal property by affixing a tag or tape to each article (not applicable to individual items in packing containers). Each shipment shall be separately identified by lot number. Each article shall be assigned a number that shall correspond with the item number shown on the inventory form. The type of identification used and the method of affixing it to the article shall be such as not to damage any article so identified.
3) The contractor shall identify items disassembled or serviced by contractor or by third party at origin and record such items in the remarks section of the inventory.
6. Appliance Servicing and Unservicing. The contractor shall service and un-service appliances IAW manufacturer’s specifications. If third party servicing or un-servicing is required and approved by the Robins-PPPO ordering officer, the contractor shall bill the services as prescribed in Paragraph A.4.b. (1).
7. Containers and Vehicles.
NOTE: No more than two percent of total number of GOCs improperly protected during this quarter. Less than two failures per month to re-coop GOCs within specified time frame
a. Government-Owned Containers (GOCs). GOCs are containers constructed IAW Commercial Standard ASTM-D4169-01. GOCs also include those containers listed in SDDC Pamphlet 55-12, those meeting ASTM-D6251, and wooden overflow and oversize containers purchased by the Government or received by the contractor awarded the Schedule II, Inbound Services contract. GOCs shall be used to the extent as they are available for Schedule I, Items 0001 through 0005, before using contractor-furnished containers.
(1) All GOCs and contractor-furnished containers shall be free of defects (holes, loose or broken framing, and missing skids, caulking repairs, or separated plywood). Unacceptable containers are those that have been extended to accommodate oversize or overflow items, any panel bowed or bulging beyond their normal conformity, those with deteriorated plywood (either rotted or delaminated), those caulked on outside seams or joints, and those patched without the use of caulking compound. Patches on the outside surfaces are not acceptable because they increase the overall dimension and are subject to being scraped off during handling. The floor shall be solid and all skids installed and in sound condition. All GOCs will be protected from the elements and stored in such a manner to prevent water/mold/pest damage.
(2) All GOCs and contractor-furnished containers shall conform to USDA requirements for Wood Packaging Materials (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT) lumber (HT to 56 centigrade for 30 minutes) and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC), Incorporated or an equivalent organization recognized by the host nation’s government for WPM procured outside the United States (US) IAW WPM policy and WPM enforcement regulations (http://www.alsc.org) (*) Non-DoD Website. Wood fumigated with methyl bromide is not authorized for use in the shipment of HHGs as damage may occur to the HHGs. All materials must include certification markings IAW ALSC standards and be placed in an unobstructed area that shall readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with International Standards for Phytosanitary Measures Publication (ISPM) No. 15, International Standards for Phytosanitary Measures: Guidelines for Regulating Wood Packaging Material (WPM) in International Trade and be marked with an ALSC approved dunnage stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. Additional information on WPM requirements can be found at http://www.aphis.usda.gov (*).
b. Containers for articles such as large pieces of marble or glass table tops that require more protection than the standard packing techniques shall be constructed IAW ASTM D6039/D6039M-02, Standard Specification for Crates, Wood, Open and Covered. These containers shall be used for interior packing purposes.
c. Skids. Any container that shall be handled with a forklift must be constructed with two or more skids. All wooden containers entering the Defense Transportation System (DTS) with a gross weight of 100 pounds or more or with length and width dimensions of 48 inches by 24 inches or more shall be equipped with two skids of not less than a minimum of 3 inches high and 3 1/2 inches wide. Skid sizes shall be IAW ASTM-D6251.
d. Banding. Containers of plywood construction shall be banded IAW Commercial Standard ASTM D3953-02, Standard Specification for Strapping, Flat Steel and Seals or of equal quality with nonmetal banding.
e. Coopering of GOCs shall be performed when authorized by the Robins-PPPO. Patches shall not increase the overall container dimensions. All repairs shall be done prior to delivery to residence and done within 5 days of notification by PPPO.
f. Vehicles. The contractor shall ensure that all vehicles used in the movement of personal property shall be of a safe and sound condition so as not to permit damage to personal property.
8. Marking Exterior Shipping Containers. The contractor shall mark all GOCs by stenciling with letters at least one inch high. Freehand marking shall not be used. Felt tip markers shall not be used. All old shipment markings shall be obliterated prior to delivery to residence. Each container shall be stenciled with all required elements prior to departure from the warehouse.
a. The contractor shall ensure permanent markings on containers are legible and conform to Commercial Standard ASTM-D4169-01 and SDDC Pamphlet 55-12. The following permanent markings shall be stenciled in black letters 1 1/2 inches high, Figure G1-3, Location of Permanent Markings on ASTM- D4169-01 Wood HHG Box, and G1-4, Location of Permanent Markings on MIL-STD-1480 HHG Box:
On one side and one end:
USE NO HOOKS
STORE UNDER COVER
US PROPERTY
SDDC APPROVED
In the appropriate places:
CENTER OF BALANCE
LIFT HERE
FORKLIFT HERE
b. On Commercial Standard ASTM-D4169-01 and SDDC Pamphlet 55-12 containers, the following additional permanent markings shall be stenciled on one side and one end toward the top of the container in black letters 2 inches high. The contractor shall stencil the word “UP” with an arrow pointing to the top of the container. Then under “UP” on an orange background not to exceed 8 x 10 inches in black letters approximately 2 inches high, the contractor shall stencil “DPM.” The word “EXPEDITE” shall be symmetrically spaced below in 1 1/2 inch high black letters. (See Figures G1-3 and G1-4.)
c. Shipments identified as “BLUEBARK” shall be stenciled in 1-inch letters with the code word BLUEBARK above the PPGBL/BL number.
d. As a minimum, the property member’s/employee’s last name shall be legibly hand written or stenciled on all containers prior to departure from the origin residence, warehouse, or other pickup point.
e. Permanent markings on DPM HHG, Figure G1-5, Container Marking for Household Goods, and UB, Figure G1-7, Markings of Unaccompanied Baggage containers shall be legible and conform to Commercial Standard ASTM-D4169-01 and SDDC Pamphlet 55-12. DPM HHG and UB containers shall have a completed Military Shipping Label (MSL) affixed on one side and one end panel for all shipments entering the DTS, except for duffel bags and similar packages which shall have an MSL affixed to one surface. The MSL, Figure G1-6, Military Shipping Label for Personal Property, requires human-readable information as well as linear and 2-dimensional bar codes. The human readable and linear bar coded portions of the MSL are prepared as described below and the 2-dimensional bar code is prepared IAW Appendix R. If the shipping container does not lend itself to the application of the label, or if the label would cover or interfere with other required markings, the label shall be attached to a general purpose tag or a placard. The general purpose tag or placard shall be tied, wired, or otherwise fastened to the shipment unit or movement conveyance.
f. The following listed human readable data and Code 39 linear bar codes shall be placed on each MSL. Some entries are keyed to numbered blocks on the MSL and some are in addition to that form’s requirements. The human readable unit of measure shall be provided in United States (US) standard terms (e.g., pieces, inches, feet, pounds for measured items) and the data values shall be rounded up to the nearest whole number with leading zeros suppressed. Also see Military Standard- 129, Department of Defense Standard Practice, Military Marking for Shipment and Storage, and
ANSI MH10.8.1.
(1) Transportation Control Number (TCN): Human readable and linear bar code using 1/2-inch high Code 39 format.
(2) Transportation Account Code (TAC), PPGBL /BL Number, and Carrier.
(3) From: The consignor Department of the Defense Activity Address Code (DODAAC) and in-the-clear address.
(4) Type Service: In-the-clear text (e.g., TGBL Cd J). The clear-text descriptions may be derived from the personal property TCN field 15 descriptions.
(5) Ship to/POE: Three-digit air/sea Port of Embarkation(POE) code, and enough space for 5 lines of up to 35 characters for the in-the-clear address.
(6) Transportation Priority: Bold text 3/4 inches tall.
(7) POD: Three-digit air/sea Port of Debarkation (POD) code or blank.
(8) Consignee/Mark For: Member’s Name followed by the consignee DODAAC and/or Mark for in-the-clear address, and linear bar code using 1/2 inch high Code 39 format.
(9) Weight: Actual gross weight (this piece) with unit of measure. Do not zero fill.
(10) RDD: Three-digit code or blank. Blank for classified Unit Move.
(11) Cube: Cube (this piece) with unit of measure. Do not zero fill.
(12) Tare Weight: Weight of container before loading personal property.
(13) Date Shipped: Four-position code or in-the-clear date. Blank for Unit Move.
(14) Net Weight: Weight of personal property loaded into a container.
Piece Number: Piece number of this shipment (of Total Pieces) and a linear bar code using 1/2 inch high Code 39 format. Do not zero fill. Piece Number and Total Pieces may be expressed as “Piece Number of Total Pieces” to save space on the label. Total Pieces: Total number of pieces in this shipment unit. Do not zero fill.
(15) PDF417 2D symbol IAW Appendix R.
NOTE: Social Security Number (SSAN) shall not be stenciled on the container unless it is a part of the TCN.
Failure to comply shall be considered a violation and action shall be taken by the JPPSO.
g. Contractors may optionally stencil shipment markings in addition to the MSL on outside of containers.
Freehand marking is not acceptable. Markings shall be proportional to the available space on the container. Old markings not applicable to the current shipment shall be permanently obliterated before the container’s arrival at the member’s/employee’s residence. One copy of the member’s/employee’s orders shall be placed in each container used to ship UB. When an order applies to more than one member/employee, the name of the member/employee to whom the baggage belongs shall be identified.
h. Overflow Containers. Overflow containers (Schedule I, Item 0003) shall be limited to use for those items that accumulate over and above that which can be packed into an ASTM-D4169-01 or SDDC Pamphlet 55-12 container. The construction of an overflow container shall be IAW ASTM-D6251.
The overflow container normally is of lesser size than ASTM-D4169-01 or SDDC Pamphlet 55-12 containers and shall be limited to one per shipment.
i. Oversize Containers. Oversize containers (Schedule I, Item 0003) shall be limited to use for a single item that exceeds the dimensions of and cannot be accommodated in ASTM-D4169-01 or SDDC Pamphlet 55-12 container and therefore requires a specially built container. One or more of this type may be required per shipment. These containers shall be constructed IAW ASTM-D6251 and the exterior container dimensions furnished to the JPPSO-SC ordering officer.
j. Other Shipments. Containers constructed for other shipments (Schedule I, Item 0003) shall be constructed IAW ASTM-D6251. Other shipments are defined as small shipments that require a lesser size box (container) than specified in Commercial Standard ASTM-D4169-01 or SDDC Pamphlet 55- 12.
k. The contractor shall report, store and, when instructed by the Robins-PPPO ordering officer, reposition Government-owned HHG containers. When repositioning is ordered, the contractor shall load the GOCs on vehicles and deliver them to the site identified by the JPPSO-SC ordering officer.
(1) The outbound contractor, when instructed by the ordering officer, shall pick up and store empty GOCs from other local carrier or Government facilities within the contract area of performance. When the contract is awarded to different contractors, storage of the GOCs is the responsibility of the outbound contractor unless otherwise instructed by the ordering officer. The storage of containers contemplated under this contract means, as a minimum, that containers, if not stored within a building, shall be stored in a manner to protect from precipitation, ground water or other moisture.
(2) GOC Report. The contractor shall submit a GOC report (a local form or for Air Force Installations, AF Form 384, Government-Owned Container Control Record). The report shall be submitted to the Contracting officer and Robins PPPO 15 days after the contract start date and thereafter on the first workday of each month (CDRL A005). The contractor shall keep an accurate, up to date count of all GOCs.
(3) Serviceable/Un-serviceable Containers. The contractor shall not commingle serviceable or un-serviceable containers. After inspection by the Robins-PPPO ordering officer, these two categories of containers shall be segregated. The Robins-PPPO ordering officer and contractor shall mutually agree upon the inspection and disposition schedule. The contractor shall dispose of unserviceable containers at no cost to the Government, when instructed by Robins- PPPO ordering officer.
(4) The new outbound contractor shall pick up the serviceable empty GOCs from the previous contractor(s) not later than 30 calendar days after commencement of the contract.
9. Outbound Documentation and Movement.
a. PPGGL/BLs and similar documents covering outbound HHG shipments shall be sent to the JPPSO- SC ordering officer by the contractor each workday IAW locally established procedures such as email, courier, or faxcimile. Distribution of completed PPGBL/BLs and TCMDs shall be as outlined below.
b. On outbound HHG shipments, the contractor shall complete the original PPGBL/BL and all copies, the following information by typing information on:
(1) Block 26 (Packages), Enter the number and kind of containers, such as 1 F/L or 2 CTNS.
(2) Block 27 (Description of Shipment). Enter the aggregate weight and cube of the total number of each different type of container shown in Block 26.
(3) Block 28 (Weight). Enter the gross, tare and net weight.
c. On outbound UB shipments, the contractor shall provide information on actual pieces, weight and cube to the JPPSO-SC within one day after pickup so that the JPPSO can prepare the PPGBL/BL.
Information shall include:
(1) Packages to include the number and kind of containers, such as 1 F/L, 2 CTNS.
(2) The aggregate weight and cube of the total number of each different type of container.
(3) The gross, tare and net weight.
d. On all outbound shipments moving by a PPGBL/BL, the contractor shall surrender the original and copies 2, 3, and 4 of the PPGBL/BL to the carrier when the shipment is picked up. The contractor shall return copies 5, 6, and 7 of the PPGBL/BL to the JPPSO-SC ordering officer not later than the close of business the next workday after the day the shipment is picked up (CDRL A008, Bill of Lading). Computer generated PPGBL/BLs are not numbered. In instances where computer generated PPGBL/BLs are used, enough copies shall be made to ensure the right number of copies shall be submitted. All copies of the PPGBL/BL returned to the JPPSO-SC ordering officer shall bear a legible pickup date, carrier pro number stickers and signature of the contractor’s representative. The contractor shall furnish the JPPSO-SC ordering officer the completed inventory, packing lists, and weight tickets no later than 4 work days from date of pick up for HHG and 3 days from date of pickup for UB shipments.
e. On outbound overseas shipments, the contractor shall complete the original TCMD, (Figure G1-10) and all copies, the following information by typing information on:
1) Block 22 (Pieces). Enter the total number of pieces in the shipment.
2) Block 23 (Weight). Enter the gross, tare and net weight.
3) Block 24 (Cube). Enter the total cube of the shipment.
f. One completed copy of the TCMD shall be placed in the waterproof envelope on the number one container, 3 copies shall be given to the carrier, and one annotated copy shall be sent to JPPSO-SC.
g. If any container being prepared to enter the DTS has an outside measurement of greater than 84 inches, the contractor shall prepare an Outsized Air Cargo Report (CDRL A011)
h. Carrier Pickup of Shipments. Within one workday after the property is ready for shipment, the contractor shall contact the assigned carrier, as indicated on the PPGBL/BL, to arrange for pickup.
When shipments are not picked up by the assigned carrier by close of business of the next workday, after contractor notification, the contractor shall notify the JPPSO-SC ordering officer of the carrier’s failure to pickup the shipment not later than 9 A.M. of the next workday.
i. For outbound shipments requiring drayage to an air or sea terminal within the contract area of performance, the contractor shall deliver the shipment to the designated terminal within five workdays of a request by the JPPSO-SC ordering officer for UB or within six workdays of a request by the JPPSO-SC ordering officer for HHG. For shipments drayed to a terminal, the delivery receipt or after transfer document shall be returned to the JPPSO-SC ordering officer not later than the next workday following delivery.
j. The contractor is required to submit a weekly report showing outbound shipments on-hand which were picked up prior to the previous Wednesday (CDRL A009, Contractor’s Weekly Report).
k. When the contractor’s facility is located in a town, city, or metropolitan area other than the location of the PPPO, telephone notification of completed containerization or arrival of shipments shall be considered as meeting the requirements for written notification. However, the contractor shall mail the written notification to the JPPSO-SC ordering officer within one workday following the day of telephone notification.
l. On outbound overseas shipments entering the DTS, the contractor shall prepare and affix a 2 dimensional and linear bar coded MSL as described in Paragraph A.8.f. and Appendix R.
10. Storage.
a. Identification. The contractor shall ensure all outbound shipments are properly identified by the members/employee’s name, PPGB/BL number, and call or lot number. Such identification shall be in plain view on each lot.
b. Vehicles shall not be used for the storage of shipments. Pickup and drayage includes placing the goods within the facility on the pickup date specified in the order; however, at the latest, the shipment shall be placed in the facility no later than the day following pickup. When the contractor chooses to allow the personal property to remain on the truck until the next working day, contractor shall be held liable for any loss or damage occurring during this time without regard to cause.
c. All personal property shall be stored to maintain a minimum of two inches of clearance from the floor to the undermost portion of the personal property. This elevation requirement shall apply after three workdays handling-in period. Items waiting for the completion of handling-in services shall be protected at all times. In addition, the property shall not be stored in contact with exterior walls. Height of HHG stacked loose shall not exceed 10 feet. Extension ladders, TV antennas, swing sets, and similar items are excluded from this height requirement.
d. Shipping Containers. The contents of containerized shipments shall not be removed from containers when placed in storage. Shipment shall not be decontainerized prior to delivery to residence unless instructed by the Robins-PPPO ordering officer.
e. Storage Charges. Storage charges for outbound HHG and UB shipments shall not commence earlier than the sixth workday following date of JPPSO-SC ordering officer’s receipt of contractor’s notification of completion of containerization service. Storage charges shall apply for each 30-day period or computed as a fraction thereof. Date of release from storage shall not be considered in computation of storage charges.
f. Storage charges for inbound HHG and UB shipments shall not commence earlier than the sixth workday following date of contractor’s notification to the JPPSO-SC ordering officer of arrival of shipment. Storage charges shall apply for each 30-day period or computed as a fraction thereof.
Date of release from storage shall not be considered in computation of storage charges.
g. When the contractor cannot release a shipment from storage or deliver a shipment on the date requested by the JPPSO-SC ordering officer, the storage charges shall cease on the requested date instead of the actual date of release.
h. The contractor shall submit an on-hand report for all inbound shipments at the contractor’s facility (CDRL A010, Report of Shipments on Hand). This report shall list all inbound shipment in storage and/or waiting to be delivered. Negative reports are required. Robins-PPPO shall identify when reports are to be submitted.
i. The ordering officer at JPPSO-SC shall follow Service guidelines when authorizing additional storage. The ordering officer shall notify the contractor of the expiration date of storage at government expense.
11. Facilities. Contractor’s facilities shall meet the guidelines outlined in DOD 4500.9R, Part IV, Appendix D.
NOTE: Less than three violations per quarter based on inadequate facilities or unserviceable equipment as outlined in Appendix E.
a. Inspection of Contractor’s Facility. The contractor’s facility shall be initially inspected and approved by a Contracting Officer Representative (COR) from the Robins-PPPO for compliance with the standards and regulations stated or referenced. Thereafter, inspections shall be on a quarterly basis or, if deemed necessary, on a more frequent basis. Inspections shall be conducted using DOD 4500.9R, Part IV, Appendix E. If a facility is found to be unsatisfactory, it may be declared ineligible to receive further orders under the contract.
b. Upon receipt of contract award, the contractor shall furnish to the contracting officer evidence of the kinds and minimum amounts of insurance covering work to be performed. Each policy shall contain an endorsement that cancellation or material change in the policy shall not be effective until after a 30-day written notice is furnished to the contracting officer.
12. Cargo Insurance. The contractor must provide a certification of cargo insurance reflecting coverage on a continuous basis in at least the amount shown below to cover legal liability. The certificate shall contain the statement that the insurance company shall provide the designated installation contracting officer, a 30-day written notice of any change, expiration, or cancellation of said policy. The underwriter of cargo insurance shall have a rating of “A” or better in current issue of Best Insurance Guide. The certificate shall be prepared with original signatures and provided to the designated installation contracting officer.
The following is the minimum cargo liability coverage required: For both domestic and international shipments is $50,000 per shipment.
13. DPM Delivery, Unloading and Unpacking.
a. The contractor shall furnish the JPPSO-SC ordering officer the written receiving notice not later than the next workday following the arrival of the inbound shipment. The receiving notice shall contain the following information for each individual shipment: Name and rank/grade of the property member/employee, PPGBL/BL number, number of pieces, size and type of containers, weight, and name of carrier. When markings on the containers or documents indicate the shipment is of a deceased member/employee (BLUEBARK), this information shall also be provided. The above information shall be obtained from the available documents or containers.
b. The contractor shall provide upon delivery to the residence - unloading and unpacking, to include the one-time laying of rugs, assembling of disassembled furniture, unservicing of appliances, and the one-time placement of furniture and like items in the room of the dwelling or a room designated by the property member/employee. The contractor shall not be required to move items once placed as designated. Third party services as set forth in Paragraph A.4.b (1) shall be performed when authorized. Unless specifically waived by the member/employee, in writing, unpacking services shall be performed. The contractor shall have the member/employee certify and sign on the inventory or delivery document that unpacking was or was not performed.
(1) Unpacking Service. The contractor shall provide unpacking service, on a one-time basis, all barrels, boxes, cartons, and crates. The contents shall be placed in a room designated by the member/employee.
This includes placement of articles in cabinets, cupboards, or on shelving in the kitchen when convenient and consistent with safety of the article(s) and proximity of the area desired by the member/employee, but does not include arranging the article(s) in a manner desired by the member/employee.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .