UHHZ100073, UHHZ110138 INDEX OF SPECIFICATIONS
INDEX OF SPECIFICATIONS
NUMBER TITLE PAGES
Division 1 - General Requirements
01005 Statement of Work 01005-1 thru 01005-6
01040 Site Requirements 01040-1 thru 01040-5
01300 Submittals and Contractor-Furnished Items 01300-1 thru 01300-6
01501 Temporary Services for Contractor 01501-1 thru 01501-5
01503 Contract Administration 01503-1 thru 01503-4
01540 Green Procurement 01540-1 thru 01540-12
Attachment 2 No. of pages = 1
01560 Environmental Requirements 01560-1 thru 01560-19
01568 Asbestos Abatement 01568-1 thru 01568-43
01572 Construction & Demolition Waste Management 01572-1 thru 01572-6
01580 Safety Requirements 01580-1 thru 01580-6
01 62 35 Recovered/Recycled Materials 016235-1 thru 016235-2
Division 2 – Existing Conditions
02 41 00 Demolition 024100-1 thru 024100-12
02065 Lead-Based Paint In-Place Management and
Abatement for RAFB 02065-1 thru 02065-18
Division 3 – Concrete
03 30 00.00 20 Cast-In-Place Concrete 03300.00 20-1 thru
03300.00 20-20
Division 23 - Earthwork
02934 Grassing - Hydroseeding 02934-1 thru 02934-4
31 23 00.00 20 Excavation and Fill 312300.0020-1 thru
312300.0020-15
TOTAL NUMBER OF PAGES (Including Index) = 185
<<<<< END OF INDEX >>>>>
UHHZ100073, UHHZ110138 STATEMENT OF WORK - 01005
STATEMENT OF WORK
01005 - 1 of 6
PART 1 - GENERAL
1.01 STATEMENT OF WORK: This is a general overview of the project.
A. Location: Accomplish Work at Robins AFB, GA.
B. Pre-Award Submittals. Submit the following before award during competitive negotiations:
1. Cost - Cost breakout with base bid and options on separate sheets. Provide complete breakouts in similar fashion for each subcontractor.
2. Schedule - A schedule from award to construction complete in MS Project or Excel format
C. Price: The original contracted price includes special work times for utility outages and repair of damages. The words "at no additional cost to the Government" apply to all such situations whether stated or not.
D. Contract Documents: Follow details shown by the specifications and drawings, interpreted in accordance with contract clauses. The DFARS clause 252.236-7001, Contract Drawings and
Specifications, is hereby incorporated by reference if not listed in the Standard Form 1442 of the contract. Note especially the clause's instructions regarding designer intent.
E. Project Scope, Objectives, and Criteria. Provide all labor, material, plant, equipment, supplies, and coordination required to demolish buildings 647 and 11. The work includes the following:
PROTECTION OF EXISTING CONDITIONS
Contractor to provide field survey documenting the existing conditions at the project site conditions of
“before” and “after” conditions. Contractor shall protect all existing exterior conditions, as well as existing adjacent conditions. Contractor will be responsible for the cost to repair and/or replace any damaged areas on the exterior due to damage incurred by the repair/renovation project and shall restore the areas to its original condition.
EXISTING ASBESTOS and LEAD-BASED PAINT SURVEYS
Asbestos and lead-based paint surveys were performed on each facility and have been attached for your use during the demolition of each building.
SURVEY OF EXISTING CONDITIONS
Contractor shall have a survey of the project site to locate all utilities in the project location prior to any work commencing at the site. The Contractor shall schedule and meet with the Civil Engineering utility shop personnel at the project site and locate their underground utility lines and buried structures that might be affected by any digging/excavation on the site plans during construction. Contractor must perform a physical survey of the actual site to verify site conditions. The Geobase images of the building sites have been provided as a reference guide with utility layouts needing verification and surveying at the end of the Statement of Work Section.
UHHZ 110170 STATEMENT OF WORK – 01005
01005 - 2 of 6
DEMOLITION
1. Contractor shall demolish all portions of Building 647 in its entirety, constructed in 1954, which consists of a 1,590 square feet single story structure and Building 11 (existing slab to remain), constructed in 1960, which consists of a 1,282 square feet single story structure.
2. The demolition work shall include but not be limited to the following: Contractor shall demolish the slab-on grade foundation including footings at B647 only (B11 - existing slab, foundation, and footings will remain). Contractor shall demolish piping, conduit, and sewage lines shall be removed from site and discarded at the appropriate landfill(s). This includes columns, driveway, loading dock, ramps, pads, and building foundations. All masonry items shall be removed. All roofing, roof equipment, roof trusses, fencing, metal stairs and railing, doors, windows, HVAC ductwork, lights, equipment and units and foundation/concrete/masonry/structural steel/miscellaneous steel demolition shall be removed. All building items shall be removed.
3. All utilities, to include electrical, water, sewage, natural gas, and telephone shall be demolished in accordance with National Electric and Plumbing Codes. Water and natural gas lines shall be capped off at the respective mains. The lines between the mains and the units shall be abandoned in place or be removed as required. Sewer laterals to the building is to be disconnected approximately 5 ft.
from the building and capped at the main. Any the section of sewer lines under the building to be capped at the main and then removed from under building. The electrical service is to be disconnected and the service removed back to the transformer (conductor only not conduit). The termination points of all utilities are to be permanently marked for future identification. Markers shall be flush with finished grade.
4. All fire hydrants are to remain in place and shall be protected. All trees are to remain and be protected.
5. The base strongly encourages recycling when possible. The Contractor shall remove all re-useable equipment. All recyclable scrap metal materials, including cable and wire, removed by the contractor shall be turned over to the Government for salvage. The contractor shall secure, separate and store the metal materials in GOV provided roll-off containers (20-40 cubic yards), hoppers (2-4 cubic yards) or other containers as required on site at a minimum of 2 each per day. Contractor shall notify designated Government representative at least 24 hours in advance of need to replace each full scrap metal container with an empty container provided by Government; POC is 78 CEG/CEAN at
(478) 327-8104. The contractor is responsible to ensure all Georgia State EPD regulations and
RAFB regulations are enforced with reference to all recycling and salvage operations.
6. See project specifications for further requirements.
NEW WORK (BASE BID)
1. After demolition and removal of all debris from the site, all disturbed areas shall be backfilled with top soil and structural fill as required to match adjacent areas to aid in drainage and grassed. Finish grades to be such that there is no ponding or puddling during periods of rain. Contractor will establish grasses on all areas of disturbed soils by hydro-seeding. All trees are to remain and be protected during execution of work. The Contractor is responsible for all street repairs necessary in the street demolitions at intersections with streets to remain. The contractor shall make neat, straight saw cuts to separate the existing concrete to remain from the existing concrete that is to be removed so that the remaining asphalt and/or concrete has a straight and square edge.
2. At Building 647, contractor shall install new 6” - 4000 psi concrete slab with one layer 6 x 6 – W4.0 x W4.0 welded wire fabric over 98% compacted subgrade. Ensure new slab aligns with adjacent slab elevations and slopes to drain water in a positive direction so that there is no ponding or
01005 - 3 of 6 puddling during periods of rain.
F. General Congestion:
1. Work area is restricted to the area shown. It is not congested however traffic flow for recycle customers must be maintained. Do not block gate entry and exit areas.
2. Some factors that may restrict work include cars entering and leaving parking areas near the construction site.
G. Evacuation: Before fencing off the construction area, notify the Contracting Officer in writing 21 days before ready to start.
H. Qualifications: The Contractor performing the work shall be qualified and experienced in general construction. The Contractor shall have a Supervisor and/or Foreman qualified and experienced in the procedures required for the building renovation. The Supervisor and/or Foreman will be on site at all times to oversee and supervise all phases of work.
1.02 CONTINUED OCCUPANCY:
A. Access: The contractor will be given full access to the project area.
B. Beneficial Occupancy: The Government reserves the right to take beneficial occupancy of parts of the project area before the total project completion date. This is not final acceptance, and identified deficiencies must still be corrected.
1.03 HOURS OF WORK:
A. Standard work hours for this project are the base normal work hours of 7:00 AM to 4:30 PM, local time, Monday through Friday. Work must stop on official Government holidays and work curtailment days, unless specifically approved in advance.
B. Alternate Work Hours:
1. If the Contractor desires to work another set of standard hours, such as four 10-hour days, submit written request five (5) workdays before the date desired to work the different standard.
2. To work special hours or days such as to continue exterior painting until dark, request verbal approval from the Contracting Officer at least four hours in advance.
3. The Government reserves the right to refuse these requests. However, they will usually be approved unless they negatively affect the base or the using activity. For example, the using activity may have difficulty paying overtime for escorts in controlled areas. In addition, work requiring inspector presence such as placing concrete may not be possible outside normal hours on short notice. Digging outside of normal hours will normally not be approved.
C. All references to days mean calendar days unless otherwise noted.
01005 - 4 of 6
1.04 SUBMITTALS:
A. General: Provide the following submittals in accordance with instructions found in Section 01300, Submittals and Contractor Furnished Items. The contractor may submit manufacturer’s data in lieu of the required certificate of compliance if he desires. The government requires manufacturer’s data if an
“X” appears under the “Mfg. Data Required” column.
B. Material Submittals: Omitted.
C. Other Submittals: Provide the following submittals as required by the contract or as directed by the
Contracting Officer.
Inspector
Para # Description Date Required Check Mark
1.03 B Alternate Work Hours 5 days prior _______
PART 2 - PRODUCTS - OMITTED
PART 3 - EXECUTION
3.01 COMMENCEMENT OF WORK
A. Construction Prohibition: Do not order any materials or start any construction until the Contracting
Officer has approved all related submittals.
B. Noncompliance Impacts: Any contractor costs resulting from noncompliance with these requirements are the sole expense of the contractor. Noncompliance shall not be cause for contract extensions or other considerations, but they may be cause for the Government to charge the contractor for liquidated damages for all negative impacts upon the Government.
3.02 COORDINATION: The superintendent (or contractor on-site project manager) shall coordinate work between different disciplines.
A. Avoid conflicts between new mechanical, electrical, architectural, and civil systems. Also, avoid conflicts between new work and existing structural or physical aspects or features of the facility.
Request guidance from the Technical Representative of the Contracting Officer, and then perform such work at no additional cost to the Government.
B. Locations shown are approximate and may be moved if approved by the Technical Representative of the Contracting Officer. Show such variations on as-built drawings and do them at no additional cost to the Government.
C. Manufacturers' recommendations and/or requirements, if more stringent than the specifications and drawings, shall be followed at no additional cost to the Government.
3.03 GOVERNMENT-FURNISHED PROPERTY will not be provided in this project.
3.04 AS-BUILTS: Also see Section 01300 for submittal items such as as-builts that apply to all projects.
01005 - 5 of 6
BUILDING 647
01005 - 6 of 6
BUILDING 11
UHHZ100073, UHHZ110138 SITE REQUIREMENTS - 01040
SITE REQUIREMENTS
01040 - 1 of 5
1.01 SPECIAL REQUIREMENTS:
A. Controlled Areas (General): OMITTED
B. Airfield Zone Waivers: OMITTED
C. Airfield Zone Site Requirements: OMITTED
D. MFH projects: OMITTED
E. AMC/Joint STARS Area: OMITTED
F. Electronic Warfare Complex (Bldg 226, 227, 229, and 230): OMITTED
G. Avionics Complex: OMITTED
1.02 UTILITY REQUIREMENTS
A. Outages: Request utility outages in writing to the Base Civil Engineer, with a copy to the
Contracting Officer, a minimum of 21 days before the proposed outage. These will be scheduled at Government convenience and may be at times other than normal working hours.
For example, the times may be on weekends or during the second and third shifts (including holidays, holiday weekends, and work curtailment days). These are at no additional cost to the Government.
B. Metering: Provide service entrance metering on the facility for electrical, natural gas, and steam utilities, as applicable.
1.03 SUBMITTALS:
A. General: Provide the following submittals in accordance with instructions found in Section
01300, Submittals and Contractor Furnished Items.
B. Material Submittals: None required under this section.
C. Other Submittals: Provide the following submittals as required by the contract or as directed by the Contracting Officer.
Inspector
Para # Description Date Required Checklist
1.02 Utility Outage Requests 21 days prior to outage ______
1.04 Safeguarding LAN Com Lines 21 days prior to work ______
3.01.E Road/Parking Closure Request 21 days prior to work ______
3.02.A Govt Property Damage Notice Within 3 days of event ______
3.03.C Warning Tape 14 days after NTP ______
3.03.D Tracer Wire 14 days after NTP ______
3.05 Before - Site Photos Before Construction ______
UHHZ100073, UHHZ110138 SITE REQUIREMENTS - 01040
01040 - 2 of 5
3.05 After - Site Photos Before Final Inspection ______
3.08 Storage and Trailer Request 14 days after NTP ______
1.04 SAFEGUARDING COMMUNICATION FACILITIES: For work that will interfere with Local
Area Network (LAN) cable, aerial cable, house cable, underground cable, or other communication facilities, notify the Contracting Officer in writing 21 days before the scheduled construction. Do no work until receiving written approval.
3.01 DIGGING/EXCAVATION REQUIREMENTS: The Drawings show underground utilities and structures as presently shown on the best available record drawings of the site, and these may have some inaccuracies. The information is provided for general bidding purposes only. Actual locations and quantities must be determined at the site while obtaining the form below.
A. Digging/Excavation Permit (Obtained on Base): Digging permits are obtained at 0800
Monday mornings, only, in Building 1555. The Contractor, along with the technical representative, shall meet with Civil Engineering utility personnel at this time to make all necessary arrangements for the excavation permit before any digging. The Contractor will be given instructions on how to prepare and properly complete Digging/Excavation Permit.
This includes coordination before beginning any work involving digging/excavation and location of buried structures and utility lines. Before getting signatures, provide a drawing indicating the full extent of digging/excavation (width/depth/length of trench or hole). Civil
Engineering utility personnel will meet with the Contractor at the site and locate their underground utility lines and buried structures that might be affected by any digging/excavation. Do not do any digging until all parties have approved the permit (three day maximum). The digging/excavation permit shall be effective only for the time period indicated by the final signature authority.
B. Recoordination of the Digging/Excavation Permit with all organizations and the technical representative shall be required for any additional time required after expiration of the original time period. No digging/excavation shall be done after l600 hours on weekdays or anytime on weekends unless prior approval is obtained.
C. Location of Buried Structures and Utility Lines: Accurately locate and stake buried structures and utility lines indicated.
D. Excavation, trenching, and backfilling: Excavate to the required depth by hand digging within three (3) feet either side of the buried structures or utility line. Do not use motorized equipment within these parameters. Only open those trenches for which material is ready for replacement. As soon as approved by the technical representative, backfill trenches as required by the drawings or specifications. As a minimum, replace topsoil and grass the disturbed area by seeding and watering.
E. Damage: The contractor is responsible for any damage to underground structures and utility lines identified on the drawings and any identified and marked in the field as a result of
UHHZ100073, UHHZ110138 SITE REQUIREMENTS - 01040
01040 - 3 of 5 obtaining the digging/excavation permit. If any underground utility is damaged, notify the technical representative immediately.
F. Cutting of Roads, Streets, and Paved Parking Areas:
1. Mark, barricade, and illuminate construction work on or near roads or streets which may present a traffic hazard in accordance with the Manual on Uniform Traffic Control
Devices (MUTCD) 2000. Closures of streets, parking lots, and other traffic areas will not be permitted unless approved by the Contracting Officer after written request 21 days before the scheduled closure.
2. Road cuts shall be backfilled immediately after completion of associated utility work.
When the road is reopened, the cut shall be filled with temporary or permanent materials to a smooth condition, or metal plates or other approved methods shall be employed to prevent discomfort or damage to vehicular traffic. Road cuts shall be permanently closed within 5 working days unless approved otherwise by the Contracting Officer. Provide advance signage warning motorists of the condition in accordance with the MUTCD.
Repair streets as shown on the drawings.
3.02 REPAIR OF WORK AND MATERIAL: Carefully lay out cutting, channeling, chasing, or drilling of finish or structure or other surfaces for the installation of equipment or material to avoid damaging
Government property or adjacent materials not involved in the project. If Contractor personnel or equipment inadvertently damage such items, then follow the procedures below. Failure to follow the notification procedures below shall be considered a serious violation of the contract.
A. Notify the Contracting Officer by telephone immediately and confirm within 3 days with a typed letter if damage to Government property occurs. The Government reserves the right to require the Contractor to work overtime and purchase material for repair before the end of the workday at no additional cost to the Government.
B. Repair damage to building or equipment to match existing as directed by the Contracting
Officer with skilled workmen of the trades involved at no additional cost to the Government.
C. Repair Fire Resistant Assemblies that have been violated before the end of the day. In the event the work is incomplete, provide fire-rated gypsum board to cover holes 2-inch and greater in any dimension.
D. Reconnect Disconnected Equipment before the end of the day and insure that it is operating.
E. Existing Equipment and Material to remain or to be relocated is the property of the
Government. However, the Contractor is responsible for items to remain.
F. Labels on equipment plates with information shall be properly protected before any operation that could damage or cover the label.
3.03 IDENTIFYING UNDERGROUND LINES AND STRUCTURES:
UHHZ100073, UHHZ110138 SITE REQUIREMENTS - 01040
01040 - 4 of 5
A. Regardless of statements in other Spec sections, provide tracer wires and warning tapes over buried underground utilities and structures. Follow these requirements if the other Spec sections are less detailed and stringent.
B. These include all underground items such as utility lines, oil/water separators, fuel and water storage tanks, and utility pits and manholes with tops below grade.
C. Provide a warning tape of standard industrial width and thickness with imprinted words identifying the type of utility line or structure below it. Place along the length (and width if not a utility line) of the protected item at one-foot depth below grade.
D. For buried non-metallic lines and structures also provide a tracer wire placed just above them, so conventional locating equipment may be used to locate the lines or structures. These items may be made of plastic, fiberglass, or similar non-metallic material. Design basis of the tracer wire is BMS Heavy Tracer Wire by Utilitronics, PO Box 480, Stoughton, MA 02072 -phone 1-800-245-8850. Use no less than #12 AWG copper solid wire, 5/64” HMWPE insulation, with white color.
3.05 SITE PHOTOGRAPHS:
A. General: Take "before" and "after" color photographs of the work site on a digital camera with a resolution for each picture of at least 60 KB compressed image. Provide for approval on a CD-RW/DVD disk at least 24 views chosen by the Technical Representative of the
Contracting Officer (TRCO) before construction. Provide additional views as directed to show the full extent of the work. Provide for approval an identical set of "after" views.
B. Underground Utilities: For projects where there is trenching for any underground utilities, even if just laterals from outside equipment into mech-elec rooms, take an additional set of as-built photos after construction for approval before final inspection. These must cover the entire length of the trenching with a view to showing nearby landmarks to enable a person to locate the line in the field in the future by using the photos after the disturbed soil is no longer visible.
3.06 SITE MAINTENANCE, CLEAN UP, AND RESTORATION
A. Maintain the work site in a neat, orderly, and safe manner. Cut grass regularly to maintain site to base standards.
B. Remove scrap, waste, and excess materials promptly. Provide signs, barricades, and lights as required to protect base personnel.
C. Do not allow trash and debris to accumulate and become unsightly. Sweep up and collect in contractor-maintained disposal containers daily. Dispose of collected debris weekly as a minimum.
D. Store materials on site in a neat and orderly manner.
E. Restore the project site to its final condition as required by the contract as soon as possible.
UHHZ100073, UHHZ110138 SITE REQUIREMENTS - 01040
01040 - 5 of 5
F. Do not open trenches or excavations until material is on-hand or scheduled to arrive within three days. Close excavations or ditches as soon as the work has been placed, inspected, and accepted by the Government.
3.07 CRANES, BOOM-TRUCKS, ETC.: Any tall equipment, such as a crane or boom-truck, must be lowered when not in use, especially at the end of each work day. If used at night, then operate the appropriate lighting at the peak element.
3.08 STORAGE AND OFFICE AREA: Submit a request for approval if the Contractor desires a storage area or storage/office trailer(s) on Base. If approved, the Contractor will be allowed limited land area to put an office and/or storage trailer and storage area, but only for this contract. The location will be as identified by the Technical Representative within the Base perimeter.
A. Trailers: All contractor trailers must be identified with a professionally lettered and neat sign giving the name and phone number of both the trailer rental company and the contractor.
Trailers must be in good repair and give a presentable appearance. Trailers used as Field
Offices shall be anchored with rods and cable or by steel straps to ground anchors. The anchor system shall be designed to withstand high winds and must meet applicable state or local standards for anchoring mobile homes.
B. Items stored for the project on Base are the responsibility of the Contractor. Replace all such items acquired for this contract that are stolen, vandalized, damaged, or otherwise unusable -at no additional cost to the Government. The Contractor may install a temporary fence in the manner and of the type that is acceptable to the Contracting Officer.
C. This site shall be kept clean and orderly or the Contracting Officer may require the Contractor to evacuate the site before the end of the contract.
<<<<< END OF SECTION >>>>>
UHHZ100073,UHHZ110138 SUBMITTALS AND CONTRACTOR-FURNISHED ITEMS - 01300
SUBMITTALS AND CONTRACTOR-FURNISHED ITEMS
01300 - Page 1 of 6
1.01 GENERAL:
A. Basic:
1. Provide items requiring drawings, diagrams, certifications, manufacturers’ literature, data brochures, technical data, sample requests, forms, and other data as noted under the submittals section of each specification section.
2. This section does not describe design submittals required under design-build contracts.
B. Preconstruction Submittals:
1. In accordance with this Section, the following documents are required and must be approved before NTP is issued:
Certificates of insurance
Surety bonds
List of proposed subcontractors
Construction Progress Schedule
1 Set of Bid Documents (Drawings & Specs)
Submittal register
Schedule of prices
Health and safety plan
Work plan
Quality control (QC) plan
Environmental protection plan
Storm Water Pollution Prevention Plan
Storm Water Notice of Intent
Demolition Plan
Existing Conditions
C. Contractor Responsibility:
1. Review, Corrections, or Comments made on the Submittals do not relieve the contractor from compliance with the requirements of the Drawings, Specifications, Addendums, and Contract
Documents. By entering into this contract, the contractor agrees that the purpose of submittals is to demonstrate to the contracting officer that the contractor understands the design concept and that he demonstrates his understanding by indicating which equipment and material he intends to furnish, install, and use. Review of shop drawing will be general only for basic conformance with the design concept. The Government’s review of such drawings, schedules, or cuts shall not relieve the contractor from the responsibility for correcting all errors of any sort contained in the submittals.
2. The contractor is responsible for confirming and correlating all quantities and dimensions;
selecting proper fabrication processes, construction methods and installation techniques;
coordinating this work with that of all other trades; and performing all work in a safe, workmanlike and satisfactory manner.
01300 - Page 2 of 6
3. The Government has not stipulated dates for turning in material submittals, unless noted elsewhere in the specifications. The contractor must manage his/her material and equipment lead times for obtaining approval in sufficient time to complete work on schedule.
1.02 SUBMITTALS: Provide the following submittals as required by the contract or as directed by the
Contracting Officer.
Inspector
Para # Description Date Required Check Mark
1.05 A Superintendent Data As Directed ___
1.08 Equipment List 30 Days before Prefinal ___
1.10 Pre-Award - Experience With Bid ___
1.11.A Pre-Award - DB Schedule With Bid ___
1.11.B Pre-Award - DB Design Firm With Bid ___
1.11.C Pre-Award - DB Subs With Bid ___
1.03 SUBMITTAL INSTRUCTIONS: Each Specification Section lists the submittal requirements unique to it. The following apply to all sections.
A. Submittal Forms. Material submittals shall be made using AF Form 3000. For design-build (DB) projects, all design submittals only require a transmittal letter. Material submittals included with DB design packages do not require the use of the AF Form 3000, but they are considered part of the design package.
B. Material Submittals:
1. Complete Submissions: All items requiring submittals for each section shall be provided at one time. Partial submittals will be returned without approval. No time extensions will be granted for failure to comply. In some instances the specifications may require certain items from one or more specifications sections to be submitted at one time. For example, condensing units and air handler submittals may be required to be provided together.
2. Submittal Checklist: The contractor shall complete a copy of the checklist provided in the submittals paragraph of each specification section. This checklist shall be provided with each submittal. Submittal information shall be arranged in order to correspond with each checklist.
3. Time: The Contractor shall have approved submittals before ordering any equipment under this contract. If equipment is ordered prior to receiving approval, it will be solely at the
Contractor’s risk. Under no circumstances will material be installed prior to approval of submittals. There will be no time schedule for providing material submittals unless noted elsewhere in the specifications. The Contractor will be required to manage his materials/equipment lead times and obtain approval in sufficient time to complete the work on schedule. Disapproval of incomplete or unsatisfactory submittals shall not be grounds for contract extensions. Other submittals such as as-builts, test reports, etc., shall be provided as indicated.
4. Manufacturer’s Data: When the specifications contain an “X” under the “Manufacturer’s
Data Required” field of the submittals paragraph checklist, then the submission of manufacturer’s data is required. If an “X” is in the “Certificate of Compliance” field, then it becomes the Contractor’s option to submit manufacturer’s data or a Certificate of Compliance as
01300 - Page 3 of 6 detailed below.
5. Exceptions: If any material proposed for use on this contract deviates from the specifications, the Contractor shall submit those proposed deviations for approval along with detailed justification. All exceptions and deviations shall be described in detail with each product submittal. Cost will not be considered a justification for taking exceptions unless a credit is offered to the Government.
6. Substitutions: Products provided by manufacturers other than those specified as the “design basis” shall be considered substitutions.
a. All features of items submitted as substitutions are implied to be in full compliance with Specifications and Drawings if not specifically noted as "Exceptions."
b. Where a design basis is referenced in Specifications and Drawings, substitutions must meet or exceed the salient features of the design basis as determined by the Technical
Representative of the Contracting Officer. Exceptions to design basis characteristics must be clearly noted as "Exceptions." Note: The Federal Acquisition Regulations place the burden of proving the substitute as equal or better on the contractor.
c. Changes required to accommodate approved substitution shall be made at no additional cost to the Government. For example, an approved motor substitution may require upsized electrical cable and conduit.
7. Certificate of Compliance: The Contractor may, at his option, submit a “Certificate of
Compliance” (COC) in lieu of providing manufacturer’s catalog cuts/data. Only one COC will be required per specification section. Submit three copies of each COC package. The COC must be signed by the contractor and either the supplier or the manufacturer. The COC letter is attached at the end of this specification section. The letter must be completed in full.
C. Other Submittals: Other submittals such as samples, test results, spare parts, etc., shall be provided as required by each specifications section. Provide 4 copies of each unless directed otherwise.
1.04 RETURN AND DISAPPROVAL OF SUBMITTALS: This is a routine project. The Contracting
Officer will return submittals made with AF Form 3000 to the Contractor within 14 days after receipt, using the AF Form 3000 to show approval or disapproval. Resubmit revisions of disapproved submittals within 14 days after receipt of disapproval, again using AF Form 3000. Disapproval shall not be cause for time extension.
1.05 SUPERINTENDENT:
A. When requested, provide name and qualifications for review. Designate a competent person who shall have full authority to act for the Contractor and who shall be the primary contact with the
Government until project acceptance. The superintendent is a non-working site supervisor/manager who shall be on site at all times when any Contractor personnel are on site. The “site” is defined as the location where construction work is being done. The Government through the Contracting Officer or
Technical Representative of the Contracting Officer (CEC Inspector) reserves the right to shut down all
Contractor site activities if the superintendent is not on site at such times. Site work shall not resume until the superintendent has returned to the site. Several violations of this requirement are cause for termination for default.
01300 - Page 4 of 6
B. If the FAR clause requiring the formal Superintendent is not included in the contract, then the
Contractor shall have a designated work leader or foreman on site during all occasions when there are two or more personnel on site. There shall always be “someone in charge” who has authority to act for the Contractor at all such times, even if the person is just the most senior of the laborers on site.
1.06 TURN-IN OF IDENTIFIED EQUIPMENT, SPARE PARTS, TOOLS, AND OTHER
MATERIALS: Items in the Submittals section of each Specification Section (or elsewhere) that are indicated for turn-in to the Government shall be delivered as directed, or at least before prefinal inspection. Obtain receipts from Government employees receiving the materials and deliver them to the
Contracting Officer before prefinal inspection.
1.07 AS-BUILT DRAWINGS: Submit CADD as-built project drawings for approval, as detailed in
Section 01310. The Government will not make Final Payment to the Contractor until these are fully accepted and approved.
1.08 PROVIDE EQUIPMENT LIST to Contracting Officer. Indicate the make, model number, and warranty expiration date of equipment installed by Contractor. The Technical Representative will inform the Contractor which equipment should be on list. After the Government approves the list, complete the GSA Forms 274 obtained from Technical Representative, and then place these labels on the equipment in the list before prefinal inspection.
1.09 FINAL INSPECTION ONLY: If the Contracting Officer elects to have only a final inspection, turn in prefinal inspection submittals before the final inspection.
1.10 PRE-AWARD SUBMITTALS - SPECIFIC EXPERIENCE: Submit the following items after the bid and before award when directed by the Contracting Officer. (This may only be required of the low and sometimes next-low bidders.)
A. Experience: Provide documentation on contractor experience relative to this project. After bid opening, the Government may examine contractor experience per FAR Subpart 9.1. The Contractor and/or named subcontractor(s) shall have been regularly engaged in the type work of this project for at least [five (5)] years. Include for each subcontractor the name of the business and the individual responsible for this project.
B. References: Provide the names, addresses, and telephone numbers of at least two (2) customers for whom similar projects were performed in the last [two (2)] years.
1.11 PRE-AWARD SUBMITTALS - DESIGN-BUILD: Submit the following items with the bid proposal:
A. Submit for approval the schedule as described in Paragraph 7 of Section 01030.
B. Submit for approval the information on lead design firm and design subcontractors as described in
Paragraph 2 of Section 01030.
C. Submit for approval information on the construction subcontractors to be used for this work, detailing for each the type of work they will perform and the percentage of the total work that their part comprises.
01300 - Page 5 of 6
PART 3 - EXECUTION – OMITTED
<< END OF SECTION >>
Certificate Follows.
01300 - Page 6 of 6
MATERIALS CERTIFICATE OF COMPLIANCE
Project(s) UHHZ ___________, (Title)___________________________________________
Contract Number: ___________________
Specification Section (or Drawing) Number: __________________
Prime Contractor: __________
Sub Contractor: __________
Material Supplier: __________
Contractor Certification: I hereby certify that I and/or personnel under my direct supervision and/or control have reviewed all proposed materials for the above contract. I further certify that the submittal has been reviewed for completeness and accuracy and that all materials submitted will comply with the drawings and specifications in every respect unless specifically noted as an “exception taken” on the attached submittal checklist.
Signature: _______________________
Title: _______________________
Company:_______________________
Date: _______________________
Attachment:
Submittal Checklist for Spec or Drawing Listed Above
UHHZ100073, UHHZ110138 TEMPORARY SERVICES - 01501
TEMPORARY SERVICES
01501 - 1 OF 5
1.01 GENERAL: Electricity required for contractor convenience will be provided at no charge. Other utilities will be provided as available, also at no charge. Telephone hookups are contractor responsibility.
A. These requirements are general in nature and are not intended to override safety requirements.
B. Provide all equipment required for temporary utilities (such as transformers, poles, disconnects, etc.) hookup to base system and after final inspection remove equipment before final acceptance.
1.02 OMITTED:
1.03 SUBMITTALS:
A. General: Provide the following submittals in accordance with instructions found in Section
01300, Submittals and Contractor Furnished Items. The contractor may submit manufacturer’s data in lieu of the required certificate of compliance if he desires. The Government requires manufacturer data if an “X” appears under the “Mfg. Data Required” column.
B. Material Submittals: Omitted.
C. Other Submittals: Provide the following submittals as required by the contract or as directed by the Contracting Officer.
Inspector
Para# Description Date Required
Checklist
1.04 A Temp HVAC Shop Drwgs 14 days prior ___
1.04 B.1 Temp Elect Shop Drwgs 14 days prior ___
1.04 B.2 Notification of Need before start of work ___
1.04 B.3 Notification of Installation 15 days prior ___
1.04 B.4 Notification of Removal 15 days prior ___
1.04 REQUIRED INFORMAITON:
A. Heating and Ventilating: The contractor shall submit shop drawings for approval indicating the methods and equipment to be used to maintain the space temperature.
B. Electrical:
1. Shop Drawing of Temporary Service Entrance: The routing, point of connection, size of pipe(s), and method of support for the temporary service mast shall be submitted for approval before installation.
2. Notification of Need: Contractor shall submit typed letter to indicate the need for
Government furnished electrical hook-up to his service before work begins.
UHHZ100073, UHHZ110138 TEMPORARY SERVICES - 01501
01501 - 2 OF 5
3. Notification of Installation: Contractor shall notify the Contracting Officer fifteen (15) days before electrical hook-up of Service. The pole shall be set before notification.
4. Notification of Removal: Contractor shall notify the Contracting Officer fifteen (15) days before electrical disconnection of Service. The Service shall be removed before final inspection.
PART 2 - PRODUCTS - Omitted
3.01 DOMESTIC WATER:
A. General: Where required for the convenience of the contractor or as required to maintain continued occupancy of the work area, the contractor shall provide temporary water service of adequate capacity. At all points of tie-in to existing lines, the contractor shall provide a cut-off valve to isolate temporary lines from existing.
B. Insulation: Where temporary water service lines are exposed to the weather, they shall be insulated to prevent freezing from 1 November through 31 March.
C. Disinfection: Where temporary lines will be used for drinking water, they shall be flushed and disinfected before being placed into service.
D. Removal: All temporary water lines shall be removed before final inspection. The shut-off valve at the point of tie-in to the existing line shall remain unless indicated otherwise. Provide a six (6) inch section of pipe on the downstream side of valve and cap.
E. Temporary Restrooms: Where construction work renders existing restrooms unusable and alternate facilities are not within a reasonable distance as determined by the Contracting Officer, the Contractor shall provide a minimum of one portable toilet for each 15 people of each sex. As a minimum, one toilet shall be provided for each sex. Temporary facilities shall be maintained by the Contractor and located where directed by the Contracting Officer.
3.02 HEATING AND VENTILATING:
A. General: Where temperature control is necessary for the contractor's comfort, the contractor may provide temporary heating and/or air conditioning
B. Utilities: All utilities available on the site such as chilled water, steam, and electricity may be used by the contractor in conjunction with temporary heating and/or air conditioning equipment.
C. Removal of Temporary Equipment: Before final acceptance, the contractor shall remove all equipment used to provide temporary heating and/or air conditioning.
3.03 ELECTRICAL SERVICE:
UHHZ100073, UHHZ110138 TEMPORARY SERVICES - 01501
01501 - 3 OF 5
A. Pole: Contractor shall set a pole with rigid steel mast feeding a panelboard with a NEMA 3R or 4X enclosure. The pole and mast shall be set in accordance with Article 230 of National
Electrical Code(NEC).
B. Locks: The Service panelboard provided by the contractor shall be locked at all times when work is not being accomplished at job site. In all cases when the service is locked, the main breaker shall be turned off.
C. Shut-off: The existing panelboard which is used to feed the temporary circuits may require installation of necessary breakers at no additional cost to the Government. The contractor shall turn off each breaker feeding a temporary circuit connected when he is not at the work site.
1. Label: A piece of red tape shall be placed on each of the contractor's circuits when they are turned off. A notice shall be mounted within one (1) foot of panelboard stating correct operating procedure (turn breakers off when not in use) and warnings
(Government personnel should not turn on breaker no.'s with red tape on them.)
D. Clearance: All temporary branch circuits not in conduit shall be mounted at least 10' AFF.
E. Remote disconnects: In each room with some type of divider between the temporary service and location of outlets, provide a separate disconnect. This disconnect shall be visible and mounted approximately 4' AFF. Disconnect shall be of the safety switch type. Disconnects shall be lockable in the off position.
1. Shut-off: The remote disconnect shall be turned to "off" position when circuits are not in use.
2. Label: The disconnect shall be painted in stripes 1-1/2" wide running diagonally at a
30-degree angle from left lower corner to right upper corner. Stripes shall be alternate colors of red, yellow, and black.
F. Feeders shall be protected by approved overcurrent devices (fuses or circuit breakers) and originate from approved distribution centers. Overcurrent protection devices and connection shall be enclosed in approved cabinets or boxes. Provide a readily accessible, manually operated switch for each incoming supply circuit.
3.04 WIRING:
A. Rules: Wiring shall conform to NEC Article 305, and the following:
1. Wiring passing through work areas shall be covered or elevated to protect it from damage which would create a hazard to employees. Worn or frayed electric cables shall not be used. Wiring shall be fastened at ceiling height or 8-feet, whichever is higher, every 10 ft. No conductor shall be laid on the floor.
B. Branch circuits shall originate in a standard power outlet, disconnect, or panelboard.
Conductors shall be permitted within multiconductor cord and cable assemblies (no open conductors may be used). All conductors shall be protected by overcurrent devices at their ampacity per NEC 310-16.
UHHZ100073, UHHZ110138 TEMPORARY SERVICES - 01501
01501 - 4 OF 5
C. Extension Cords: The use of a number of short extension cords to reach the power source is not acceptable. A single extension cord should be used in all cases. Flexible extension cords shall be of the hard usage (SF, SJO, SJT, and SJTO) or extra-hard usage (S, SO, SJ and STO) types and listed by Underwriters Laboratories. The size shall not be less than #14 AWG, and length shall be 50 ft or less. Protect them against accidental damage caused by traffic, sharp corners, projections, and pinching in doors or elsewhere. They shall not be fastened with staples, hung from nails, or suspended by wire.
D. Splices do not have to be in a junction box. Splice using wire caps. The wire caps shall be offset from one another, and cables assembled compressed with a layer of plastic tape applied continuously with 30% overlap from one end of spliced area to the other.
3.05 OUTLETS:
A. 15- and 20-ampere attachment plugs and connectors shall be constructed so that there are no current-carrying parts except the prongs, blades, or pins. The cover for wire terminations shall be mechanically secured or an integral part of the attachment plug or connector. Plugs and receptacles shall have the proper NEMA configuration (such as 5-15R) for the voltage, phase, and amperage ratings for which they will be used. Receptacles should be marked to show operating voltage. Plugs and receptacles shall not be interchangeable between circuits with different voltage and current ratings. No dual voltage receptacles or attachment plugs shall be used. All receptacles shall be of an approved grounding type, grounded by connection to a separate grounding conductor.
B. Attachment plugs for use in work areas shall be so constructed that they will endure rough use and be equipped with a suitable cord grip to prevent strain on the terminal screws.
Attachment plugs or other connectors supplying equipment at more than 300 volts shall be of the skirted type or otherwise so designed to confine the arcs.
3.06 LIGHTING:
A. Temporary lights shall be equipped with heavy-duty electric cords with connections and insulation maintained in safe condition. Temporary lights shall not be suspended by their electric cords unless cords and lights are so designed. Temporary festoon lighting strings shall be made with cords having lamp sockets and connections protected by insulating coverings. Handlamps of the portable type shall be of the molded composition or other type approved for the purpose.
Brass-shell paper-lined lampholders shall not be used. Temporary lighting shall be connected to a ground fault interrrupter outlet. A ground wire shall be provided for all temporary lighting circuits unless there are no exposed metal parts of the lighting fixture.
B. Special: Lighting on barricades, fences, or sidewalk coverings shall be encased in metal raceway.
C. Guards: Temporary lights shall be equipped with guards to prevent accidental contact with the bulb. Guards are not required when the reflector construction has a deeply recessed bulb.
Handlamps shall be equipped with a handle and a substantial guard over the bulb attached to the handholder or the handle. Do not use exposed empty light sockets and broken bulbs.
UHHZ100073, UHHZ110138 TEMPORARY SERVICES - 01501
01501 - 5 OF 5
D. Lighting Levels: Temporary lighting systems which are installed to provide illumination during construction work shall furnish sufficient illumination for safe working conditions.
Special attention should be given to illumination at stairways, ladders, floor openings, basements and other hazardous locations.
UHHZ100073, UHHZ110138 CONTRACT ADMINISTRATION - 01503
CONTRACT ADMINISTRATION
01503 - Page 1 of 4
1.01 GENERAL: In addition to requirements specified elsewhere, also provide the schedule, meeting, and construction records listed below for this contract.
1.02 SUBMITTALS:
A. Material Submittals: Omitted.
B. Other Submittals: Provide the following as required below.
Para No. Description Date Required Checkmark
3.01.A Time Schedule by Preperf/Precon Mtg _____
3.01.B Pay Schedule by Preperf/Precon Mtg _____
3.01.C Meeting Records As Noted or Monthly _____
3.01.D Progress Report Monthly _____
3.01.E List of Values with First Progress Report _____
3.01.F Log Book Weekly _____
3.02 Closeout Report before Final Inspection _____
3.01 CONSTRUCTION REPORTS
A. Project Time Schedule
1. Submit a schedule for the entire contract at the Kickoff (Preperformance or
Preconstruction) Meeting, or before that meeting if so directed elsewhere in these specifications.
a. The schedule for the entire contract may be submitted in Microsoft Project format if the contractor so chooses. The Government will also accept similar sequence patterns shown in Word or Excel if they are properly developed and displayed.
b. If there are several projects in one contract, submit a separate schedule for each project at the same time.
2. Include timelines for design (as applicable), mobilization, start site work, separate timelines for each discipline and subcontractor, prefinal and final inspection times, punchlist completion, and demobilization.
3. The contracted total allotted time and the Government's estimate for each part of the schedule are included in the attachment to this specification.
a. The attached schedule includes days after award for holding the
01503 - Page 2 of 4
Preperformance or Preconstruction Meeting and for one resubmittal of documents provided by the Contractor at the meeting.
b. No construction/demolition work may…