FA8501-11-R-0040-04.pdf

PDF 16 KB Posted

Attached to
REPAIR RUNWAY
Solicitation number
FA8501-11-R-0040
Issued by

About this file

PDF FILE OF ADMENDMENT

View the file

Other files

File Type Posted
ADMENDMENT 03.doc DOC document
01005-Statement Of Work(REVISED).pdf PDF
CE101VG1(REVISED).PDF PDF
Questions_from_RFP-19 Aug 11.docx DOCX document
Site Visit Attendee List.pdf PDF
Questions from RFP.docx DOCX document
Drawing 3.pdf PDF
Wage Determination —
FA8501-11-R-0040.pdf PDF
App C UHHZ 100545.docx DOCX document
Final Specs.pdf PDF
Drawing 2.pdf PDF
Drawing 1.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes to clause 52.211-10 and 52.211-12.

A. Clause 52.211-10 is hereby revised to address issuance of separate Notices to Proceed (NTP).

B. Clause 52.211-12 is hereby revised to address the Liquidated Damages associated w ith the separate NTPs.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jul-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8501-11-R-0040

X 9B. DATED (SEE ITEM 11)

20-Jun-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jul-2011

CODE

WR-ALC/PKO

RICHARD B COLEMAN

375 PERRY STREET

BLDG 255, FIRST FLOOR

ROBINS AFB GA 31098

FA8501 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8501-11-R-0040

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

TWO SEPARATE NOTICES TO PROCEED (NTP) WILL BE ISSUED:

MATERIAL SUBMITTALS NTP:

The Contractor shall be required to (a) commence work under this contract within 10 Calendar Days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 64 Calendar Days after issuance of the notice to proceed.

RUNWAY REPAIR NTP:

The Contractor shall be required to (a) commence work under this contract within 2 Calendar Days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 14 Calendar Days after issuance of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract and the MATERIAL

SUBMITTAL NTP, the Contractor shall pay liquidated damages to the Government in the amount of $273.27for the first day, and $ 232.89 for each subsequent calendar day of delay until the work is completed or accepted.

(b) If the Contractor fails to complete the work within the time specified in the contract, and the RUNWAY

REPAIR NTP, the Contractor shall pay liquidated damages to the Government in the amount of $26,000.00 for each calendar day of delay until the work is completed or accepted.

(c) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .