CDRLS_FD20201900462.pdf
PDF 751 KB Posted
- Solicitation number
- FA8250-19-Q-0462
About this file
CDRLs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Transportation_FD20201900462.pdf | ||
| 9573_RDL_FD20201900462.pdf | ||
| 9316_RDL_FD20201900462.pdf | ||
| FA825019Q0462.pdf | ||
| PWS_FD20201900462.pdf | ||
| Packaging_FD20201900462.pdf | ||
| CAVAF_FD20201900462.pdf | ||
| 6043_9573_RQR_FD20201900462.pdf | ||
| PKG_SOW_FD20201900462.pdf | ||
| 9316_RQR_FD20201900462.pdf | ||
| GFP_FD20201900462.pdf | ||
| 6043_RDL_FD20201900462.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for revieming instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including nuggentionn for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-01881. Respondents should be aware that notwithstanding any other provision of law, no person shall be nubject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TOP TM OTHER _____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FD20201900462
F. CONTRACTOR
1. DATA ITEM NO.
AOOJ
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF(CAV AF) End item Reporting
3. SUBTITLE
CAV AF
4, AUTHORITY (Data Acqu/s/t/on Document No.)
Dl -MGMT-81634C
5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
415 SCMS/GUMBA
7. DD 250 REQ
LT
9. 01ST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Block 16 Draft
Final
Reg Repro
16. REMARKS
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML lAW the referenced DID and/or Contract Repair PWS. This information will be reviewed, by the applicable Contract Monitor, to ascertain production status.
2. Transactions and data will be submitted by the contractor daily lAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only; an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND any subcontractor locations.
3. Training will be provided by the applicable ICP representative.
4. This DD Form 1423 applies to end item repair CAV AF reporting only contracts, commonly referred to as Contractor Furnished Material (CFM) type contracts.
5. It is imperative the CAV AF Proof of Shipment reporting actions are accomplished by the contractor.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or one business day of a maintenance action lAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site JAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within one business day of last End Item maintenance occurrence and reflect an accurate representation/status of all assets at a contractor for repair.
Block 12: Date of first submission shall be within one business day following a maintenance transaction after the contract award date and government training as specified in lAW CAV AF Users Guide.
Block 13: Within one business day of each maintenance action/occurrence.
Continued on next page.
OO-ALC
DoDAAC: FB2029
415 SCMS/GUMBA
6012 Fir Avenue
HILL AFB, UTAH
84056-5820
Attention To:
Production Management
Specialist Jason Faulkner Phone:
801-777-72 17
E-mail Address jaSon.faulknerus.af.mi
15.TOTAL 0 1 0
G. PREPARED BY
Tuaas.BRAD.I1. 1273458103
H. DATE
9-Feb-18
I. APPROVED BY
FAULKNER.JASON.THOM
j57y
AS I 158647199 n,,- . ia-is-yr -nina
J.DATE
9-Feb-18
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
Adobe Professional 8.0
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FD2020 1900462
16. REMARKS (Continued)
The contractors CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities): shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
DD FORM 1423-1, FEB 2001 Page of 2 Pages
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 10 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including ouggestions for reducmg the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 10701-01881, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person ohall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contractli-'R No.
listed in Block B.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
OTHER
MGMT
D. SYSTEM/ITEM E
CONTRACT PR No
FD20201900462
F. CONTRACTOR
1. DATA ITEM NO.
A882
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
Annual Government Property Physical Inventory Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-8044 1 CIT
5. CONTRACT REFERENCE
PWS Paragraph:
6. REQUIRING OFFICE
415 SCMS/GUMBA
7. DO 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Reason for Use). (Date of Detennination). Other requests for this document shall be referred to (DoD Controlling Office).
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are detennined to contain export-controlled technical data, shall be marked with the following statement:
SEE BLK 16
15.TOTAL 0 1 0
G. PREPARED BY
JASON FAULKNER
Name(Contractor Data Mgr)
H. DATE
15-OCT-2018
I. APPROVED BY
JASON FAULKNER
Name (Prgm. Mgr)
J.DATE
15-OCT.2018
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
0.00
L,U 1-ulilvi uq.z-i, I-tb ZUUI I-'NEVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TOP TM OTHER
D. SYSTEM/ITEM F. CONTRACTOR
Fb2O2O-19-00462
116. REMARKS (Continued)
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arnis Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate lAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.I -R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:
(EMAIL ADDRESS)
IASON.PAULKNER@USAF.MIL
DD FORM 1423-1, FEB 2001 Iage ot 2 1-uges
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching eciuting data sources, gathering and maintaining the data needed, and completing and reviewing the collection of inforwation. Send comments regarding this burden estimate or any other aspect ot this collection of information, includinft suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if !t does not display a currently valid 0MB control number. Please DO NOT REtURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the ContractlPR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MGMT
TDP TM OTHER
D. SYSTEM/ITEM
E. CONTRACT PR No.
F. CONTRACTOR
1. DATA ITEM NO.
Aog3
2. TITLE OF DATA ITEM FD20201900462
Commercial Asset Visibility Air Force (CAV) Reporting
3. SUBTITLE
CFM End Item Reporting
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81838/T
5. CONTRACT REFERENCE
SEE BLK 16 FOR REFERENCE
6. REQUIRING OFFICE
7. DO 250 REQ
DD
9. 01ST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SEE BLK 16
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 5: Contract Reference: PWS Paragraph XXX and CAV AF Reporting Requirements Document
2. Block 4: All reporting shall be submitted in the English Language.
3. Blocks 10,11, 12,13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence JAW the CAV AF Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
4. Blocks 7,8,14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA825 1. MARK FOR: Address in block l4A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address:
(EMAIL ADDRESS)
SEE BLK 16
15.TOTAL 0 1 0
G PREPARED BY
JASON FAULKNER
Name (Contractor Data Mgr)
H. DATE
15 -OCT-2018
I. APPROVED BY
JASON FAULKNER
Name (Prgrn. Mgr)
J.DATE
iS-OCT-2QiS
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 10701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of low no person nhall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1'URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
E.CONTRACT PR No.
FD2020 1900462
F. CONTRACTOR
1. DATA ITEM NO.
Agg4
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY fData Acquisition Document No.)
DI-PSSS-81995/T
5. CONTRACT REFERENCE
PWS Paragraph:
6. REQUIRING OFFICE
7. DD 250 REQ
LT
9. 01ST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room andlor receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-8 1995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (D1-PSSS-8 1995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is tenuinated by the (Requiring Office), Program Manager (PM) or the Production Management Specialist (PMS),
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report"
SEE BLK 16
15.TOTAL i 0 1 0
G. PREPARED BY
JASON FAULKNER
Name(Contractor Data Mgr)
H. DATE
15 -OCT-2018
I. APPROVED BY
JASON FAULKNER
Name(Prgm. Mgr)
J.DATE
15-OCT-18
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT PRNo. F. CONTRACTOR
FD20201900462
16. REMARKS (Continued)
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Reason for Use). (Date of Determination). Other requests for this document shall be referred to (DoD Controlling Office)
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate lAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200. 1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:
(EMAIL ADDFRESS)
JASON.FAULKNER@US.At.MIL
DD FORM 1423-1. FEB 2001 Page of 1 Pages
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate 10704-0188). Respondents should be aware that notwithstanding any other provision of lam, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed farm to the Government Issuing Contracting Offloer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER ILSS
D. SYSTEM/ITEM
See BIk 16
E. CONTRACT/PR NO.
FD2020-19-00462
F. CONTRACTOR
1. DATA ITEM NO.
BOOI
2. TITLE OF DATA ITEM
Repairable Item Inspection Report
3. SUBTITLE
Maintenance Data Collection
4. AUTHORITY (Data Acquisition Document No.1
DI-iLSS-80386
5. CONTRACT REFERENCE
PWS 10.2
6. REQUIRING OFFICE
415 SCMS/GUMBB
7. DD 250 REQ
DD
9. 01ST STATEMENT
REQUIRED
D
10. FREQUENCY
ASGEN
12. DATE OF FIRST SUBMISSION
ASGEN
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SeB1k16
13. DATE OF SUBSEQUENT
SUBMISSION
SeeB1k16
Draft Final
Reg Repro
16. REMARKS
Changes to names and office symbols, when necessary, shall be made by letter through the CO/ACO without revision to this CDRL.
Block D:AN/MST-TI(V) Miniature-Multiple Threat Emitter System (Mini-MUTES) Distribution Box Assembly in TX35,NSN: SEE REMARKS FOR MORE INFO Block 4: Paragraph 10.1.1 Shall be modified to remove items a, f, and i.
Paragraph 10.1.1 items b, c, d and e refer to the assembly submitted for repair.
Paragraph 10.1 .1 item h refers to the part(s) that were replaced, repaired, calibrated, cleaned, etc. to return the assembly to operational condition. Reportable data includes (1) NSN and part number (if available) of failed part, (2) description or name of failed part, (3) location of failed part in the assembly (sufficient to uniquely identify the specific part when the failed part exists in multiple locations in the assembly).
An electronic template containing the preferred format for submitting the data is available.
If it is not attached to the solicitation, it may be obtained from the 415 SCMS/GUMAD engineer through the CO/ACO.
Blocks 10, 11, 12 & 13: Contractor shall deliver the Repairable Item Inspection report within 7 days after the completion of each repair.
Block 14: Document submission shall be made electronically using MS Office 2010 or newer formal or Portable Document Format (PDF).
Address e-mail submissions to: USAF AFMC 415 SCMS/EN, 415SCMS.en@us.af.mil 415 SCMS engineer tony.lewis.5us.af.mil AFMC OL:HIPZAAA, PCO (TBD) @us.af.mil (For PCO name see contract) DODAAC (if applicable): FY2073 Address Line 1: FY2073 GLSC 415 SCMS Address Line 2: BLDG 1239 CP 801 586 1368 Address Line 3:6012 FIR AVE Address Line 4: HILL AFB UT 84056-5820
Block 9:
DIS'l'RIBUTION STATEMENT D: Distribution is limited to DoD and U.S. DoD contractors only for administrative or operational use only. Other requests for this data shall be referred to 415 SCMS/GUMBB, HILL AFB, UT 84056.
WARNING: Export Controlled DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document
415 SCMS/GUMBB
415 SCMS/EN
AFMC OL:H/PZAAA
15.TOTAL 0 1 2
G. PREPARED BY
Engineer 415 SCMS/GUMBB
LEWIS.TONY.G.1546662744
H. DATE I. APPROVED BY
Bryson Kent 415 SCMS/GUMBB
KENT.BRYSON.C.13855179
I35_5I7)8(
86 Dir. sos or I? sin .Drv)'
J.DATE
01/17/2018
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TOP TM OTHER ILSS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
See BIk 16 FD2020-19-00462
16. REMARKS (Continued)
Block D:AN/MST-Tl (V) Miniature-Multiple Threat Emitter System (Mini-MUTES) Distribution Box Assembly in TX35,NSN: 5985-01-477-9573, 5985-01-480-6043, and 6130-01-480-9316
DD FORM 1423-1, FEB.2001 Page of Pages
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 1 10 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of thin collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate 0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block B.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
See BIk 16
E. CONTRACT/PR NO.
FD2020-19-00462
F. CONTRACTOR
1. DATA ITEM NO.
COOl
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Dl-MISC-8 1832
5. CONTRACT REFERENCE
PWS Paragraph 10.3
6. REQUIRING OFFICE
415 SCMS
7. DO 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ITIME
12. DATE OF FIRST SUBMISSION
-,iODAC
14. DISTRIBUTION
a. ADDRESSEE b.C0PlES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
N/A Draft Finai
Reg Repro
16.REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
Block D: Block D:AN/MST-T1(V) Miniature-Multiple Threat Emitter System (Mini-MUTES) Distribution Box Assembly in TX35,NSN: 5985-01-477-9573, 5985-01-480-6043, and 6130-01-480-93 16
Block 4: Plan shall include all item from section 4 of SAE AS5553.
Block 12: Contractor shall deliver the Counterfeit Prevention Plan within 30 days of contract award. Government comments provided to the contractor within 14 days after receipt, with contractor re-submittal due 7 days after receipt of comments.
Block 14: Document submission shall be made electronically using MS Office 2010 or newer format or Portable Document Format (PDF).
Address e-mail submissions to: USAF AFMC 415 SCMS/EN, 4l5SCMS.en@us.af.mil 415 SCMS engineer tony.lewis.5us.af.mil AFMC OL:HIPZAAA, PCO (TBD) @us.af.mil (For PCO name see contract) DODAAC (if applicable): FY2073 Address Line 1: FY2073 GLSC 415 SCMS Address Line 2: BLDG 1239 CP 801 586 1368 Address Line 3: 6012 FIR AVE Address Line 4: HILL AFB UT 84056-5820
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for administration and operational purposes, contains limited access information, 21 Nov 2008. Other requests for this document shall be referred to OO-ALC/AFMC 415 SCMS/GUMBB.
DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.
4ISSCMS
415 SCMS/EN
AFMC OL:H/PZAAA
15,TOTAL 0 1 2
G. PREPARED BY
Engineer 415 SCMS/GUMBB
LEWIS.TONYO.I546662744
H. DATE I. APPROVED BY
Bryson Kent
KENT,BRYSON.C,13855179 D,gwlY,g,,,.Jhv
86 n,,. mgi ill 7150
J.DATE
01/17/2018 uu i-uiiivi uq.z-i, t- ZOUl I-'REVIOUS EDITION MAY BE USED. Page of Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
See BIk 16 FD2020-19-00462
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page ot Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DOD 5010. 12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract awardl.
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR.Supplement Subpart 4.71 for proper numbering
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DO Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Item 3. Enter subtitle of data item for further definition of data item I Estimated Price - Costs to be included under Group II are without conforming to Government requirements, and the Item 4. Enter Data Item Description (DIDI number, military specification administrative and other expenses related to reproducing and number, or military standard number listed in DoD 5010.12-L (AMSDL), or delivering such data item to the Government.
one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement
(optional entry). those incurred over and above the cost of the essential data item for the data item (e.g., Statement of Work paragraph number). c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary
Item 6. Enter technical office responsible for ensuring adequacy of the contracted effort and does not require any substantial change to data item. conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and
Item 7. Specify requirement for inspection/acceptance of the data item quality of the data item.
by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item. Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and
Item 9. For technical data, specify requirement for contractor to mark the delivering such data item to the Government.
appropriate distribution statement on the data (ref. DoDD 5230.241.
Item 10. Specify number of times data items are to be delivered
Item 11. Specify as-of date of data item, when applicable.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when Estimated Price - Group IV items should normally be shown applicable, on the DD Form 1423 at no cost.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.