This document is a Statement of Work (SOW) for the manufacture and delivery of F-22 Tier 2 Parts Racks and Horizontal Stabilator (HS) Dollies in support of the 309th Aircraft Maintenance Group (309 AMXG) at Hill AFB, UT.

The SOW specifies the technical requirements for the design, manufacture, and delivery of up to 5 Tier 2 Parts Racks and 4 HS Dollies. The first Tier 2 Rack and first set of 2 HS Dollies will be delivered within 150 days of contract award, with a Physical Configuration Audit occurring within 120 days. The remaining 4 Tier 2 Racks will be delivered at a rate of 1 per 45 days after the prototype is approved. The second set of 2 HS Dollies will be delivered 90 days after the first set is accepted. The contract will be Firm Fixed Price, with the anticipated CLIN structure including the prototype, initial HS Dollies, follow-on Tier 2 Racks, and second set of HS Dollies. The contracting agency is the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

For

F-22 Tier 2 Parts Racks & Horizontal

Stabilator Dollies

In Support of the 309th Aircraft Maintenance Group (309 AMXG)

574th Aircraft Maintenance Squadron (574 AMXS)

Date Last Modified:

13 March 2024

Table of Contents

1. GENERAL INFORMATION………………………………………………..……………... 3

2. APPLICABLE DOCUMENTS…….………………………………………….………….… 3

3. DESIGN...………………………………………..……………………….………………… 3

4. DELIVERY…………………………………………………………………………………..4

5. PROGRAM MANAGEMENT…….……………….…………………………………..…

6. WARRANTY……………………………………………………………….…..................…5

7. GENERAL BASE REQUIREMENTS………………………...……………………….……5

APPENDIX A: PERFORMANCE SPECIFICATION…………….…………………………… 7

1. TIER 2 PARTS RACK BACKGROUND…………………………….……...………… 7

2. HORIZONTAL STABILATOR DOLLY BACKGROUND……………………………7

3. TIER 2 PARTS RACK REQUIREMENTS…………………………………………

4. HORIZONTAL STABILATOR DOLLY REQUIREMENTS ………………………..8

1. GENERAL INFORMATION

1.1 SCOPE

This Statement of Work (SOW) is dedicated to the F-22 Tier 2 Parts Racks & Horizontal Stabilator (HS) Dollies. This SOW identifies equipment manufacture to be performed by the contractor. The purpose of this SOW is to specify the technical requirements for the described work. Five Tier 2 Racks shall be built in total with a prototyping period to be allowed after the first delivery. Also, four total HS Dollies shall be built in accordance with the requirements in the Performance Specification (Appendix A)

1.2 BACKGROUND

The F-22 depot facility needs to acquire new and improved tier 2 racks that will no longer damage airplane coatings. These racks are used to store and provide a work location for flight control surfaces that are removed from the F-22 during maintenance operations. The requirements and specifications for these new racks will be listed in the Performance Specification Appendix (Appendix A).

The F-22 depot also needs to acquire new HS dollies to replace old and worn units currently in use. These dollies are used to transport the F-22 HS to other areas during maintenance operations. The requirements and specifications for these new dollies will be listed in the Performance Specification Appendix (Appendix A).

2. APPLICABLE DOCUMENTS

2.1 ISSUES OF DOCUMENTS

The following documents shall be used based on the latest revision available on the date of the request for proposal, unless otherwise specified, and form a part of this SOW to the extent specified herein. When documents revisions conflict, this SOW shall govern.

2.2 DOCUMENTS

Federal Acquisition Regulations

2.101

ANSI/ISO/ASQC Q9001-2015 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

DFARS 252.223-7001 Defense Federal Acquisition Regulation System AWS D1.1-1.4 & other applicable AWS standards.

American Welding Society Standards (Structural welding)

3. DESIGN

The contractor shall build and deliver up to a total of 5 tier 2 racks, as well as 4 total HS dollies meeting all requirements of the Performance Specification Appendix (Appendix A).

NEERING, JASON T CIV USAF AFMC OL_H/PZIMA

Should this be 9001-2015?

The contractor’s initial proposal shall follow the guidelines of the Contractor’s Proposal Requirements Appendix (Appendix B).

4. PROGRAM MANAGEMENT

Upon request by the government, the contractor shall provide cost, schedule, and technical risk updates throughout the life of the contract. These requests may include but are not limited to:

- Contract Status, Progress Tracking, and Reporting of Milestones

- Risk and Opportunity Management

- Technical Reviews

- Product Drawings/Models and Associated Lists Status

- Configuration Management

- Review of Critical Application Items (CAI) and Critical Safety Items (CSI)

- Subcontract management activity status (if applicable)

- Quality and Corrective Action Plan Status

- Action items

After contract award, a regular update meeting will be scheduled for the benefit of the government and the contractor to track project progress and status. The contractor may request a site visit to view current versions of the F-22 equipment being replaced.

4.1 ABBREVIATIONS/DEFINITIONS

HS- Horizontal Stabilator

Stabilator- A flight control that combines the functions of a stabilizer and elevator.

SOW- Statement of Work

5. Physical Configuration Audit (PCA)

A PCA is a technical audit consisting of a direct comparison of the characteristics of a production unit with the characteristics specified on the applicable Product Configuration Identification (drawings, associated lists, specifications, etc.). The objective of the PCA is to verify that the final drawing package matches the Configuration Item (production unit) being produced.

The contractor shall support a PCA of the first Tier 2 Rack and first set of HS dollies. The contractor shall coordinate with the government to conduct the PCA on each rack/dolly at the contractor’s manufacturing facility. If discrepancies or non-compliance issues are discovered with the validation sets, the contractor must correct them within 30 calendar days. Upon successful completion of the PCA, the contractor will deliver the first tier 2 rack and one set of HS dollies within 30 calendar days.

6. Delivery and Acceptance

6.1 DELIVERY COSTS

Rack/Dolly shipping and delivery to Hill AFB shall be at no cost to the government. The contractor shall be responsible for all delivery and shipping costs incurred. If the fixtures are damaged during shipping, the contractor shall be responsible for all repairs at no cost to the government.

6.2 DELIVERY SCHEDULE

The contractor shall deliver one (1) tier 2 rack per the initial design and requirements listed in Appendix A of this SOW on or before 150 days after contract award with the PCA occurring on or before day 120. The first tier 2 rack will be used as a functional prototype for approximately 30 days. After the “trial period”, the design of the racks may be modified at the discretion of the government. In addition, the prototype rack will be rebuilt and/or modified to match the final design. Any transport of the rack shall be at the expense of the contractor.

Once the final design has been approved by USAF, the remaining four tier 2 racks may be built and delivered. The delivery expectation is 1 Rack every 45 days after the prototype is approved.

Additionally, the contractor shall deliver four total HS dollies. This will include two of the right-handed version, and two of the left-handed version. The HS dollies shall be delivered in two sets of two, that include one each of the right-hand version and the left-hand version.

The initial set of 2 Dollies delivery expectation is on or before 150 days with the PCA occurring on or before day 120. The second set of 2 Dollies delivery expectation is 90 days after the initial set has been accepted by USAF.

All deliveries will be made to Hill AFB to either building 674 or 680.

6.3 GOVERNMENT ACCEPTANCE

The government will have a thirty (30) calendar day period to perform a quality audit of each delivered fixture.

The contractor shall be responsible for correcting any failures to meet the requirements of the Performance Specification (Appendix A). The contractor shall correct these deficiencies within 30 calendar days of identification at acceptance, unless otherwise agreed upon by the Government. The contractor shall not be paid for the delivery of a fixture until all compliance issues have been rectified and the work stand set has been accepted by the government in writing.

7. WARRANTY

NEERING, JASON T CIV USAF AFMC OL_H/PZIMA

Delivery Information added here

7.1 WARRANTY COMMENCEMENT

The warranty for all delivered products shall commence upon written final acceptance of each delivery to the F-22 depot.

7.2 LENGTH OF WARRANTY

Each tier 2 rack and HS dolly shall come with a written industry standard one year warranty starting at the date of final acceptance as stated in section 6.1.

7.3 REPLACEMENT OF DEFECTIVE PARTS

During this warranty period, the contractor shall be responsible for the replacement of any defective parts, the failure of which is due to faulty materials, workmanship, or inadequate service life. The contractor shall provide replacement parts to the depot within seven (7) calendar days. Shipping costs will be at the expense of the contractor.

8. GENERAL BASE REQUIREMENTS

8.1 DELIVERY

Trucks delivering equipment to Hill AFB must use the Roy gate for entry onto the base.

8.2 BADGING

Due to the relatively short duration of the project, permanent base access badges will not be provided to the contractor. Temporary base access will be authorized for the duration of the project.

The contractor shall provide a list to the 309 AMXG Engineering representative not less than 7 business days prior to the date access to the base is required. The list will be computer generated or typed and organized alphabetically by the visitor’s last name. The list will include last name, first name, driver’s license number, and state listed on license of all guests that will need access.

8.3 ESCORTS

The contractor shall be escorted at all times within the flight line by an authorized government representative. The contractor shall coordinate schedule and escorting services with 309 AMXG Engineering office. A point of contact will be identified at the time of contract award.

8.4 NORMAL HOURS OF OPERATION

The contractor shall have access to the facility during the following normal hours of operations from 6am to 5pm Monday thru Friday and after hour access approval is at 309 AMXG/EN’s discretion.

8.5 OBSERVED HOLIDAYS

Holidays observed at Hill AFB are New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day, and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

Appendix A

Performance Specification: Tier 2 Part Rack & HS Dolly Requirements

1. TIER 2 PARTS RACK BACKGROUND

These racks will be used to store and provide a work location for flight control surfaces that are removed from the F-22 during maintenance operations. The F-22 depot currently has racks that are used for this purpose but, they have design issues that create many opportunities to damage the parts that are stored on them.

Figure 1. CAD model of the Tier 2 Rack

2. HORIZONTAL STABILATOR DOLLY BACKGROUND

These dollies will be used to transport F-22 Horizontal Stabilators to other areas during maintenance operations. The F-22 depot currently uses versions of the dollies that have been in use since the inception of the program. Various components of the current dollies have been replaced or repaired recently. With the signs of wear and tear, these dollies need to be replaced with entirely new units.

Figure 2. Photo of a current HS dolly

3. TIER 2 PARTS RACK REQUIREMENTS

3.1 Up to five total tier 2 Racks shall be built to specifications and tolerances shown in the provided drawing (X202312518).

3.2 The first complete rack is to be considered a functional prototype and may require some adjustments at the discretion of the F-22 process engineering department. See Section 4 of the main body of this SOW.

3.3 Individual parts within the design may be substituted for a functional equivalent if written approval is given by a process engineering representative.

3.4 Delivery constraints for the first tier 2 rack shall be established at the time of contract award.

3.5 The Bottom Shelf Assembly (-50) and the Middle Shelf Assembly (-70) shall have stops installed to prevent sliding off the guide rails.

3.6 The Bottom Shelf Assembly (-50) and the Middle Shelf Assembly (-70) shall have a locking system installed to hold each shelf fully closed/fully open until disengaged.

4. HORIZONTAL STABILATOR DOLLY REQUIREMENTS

4.1 Two left-handed HS dollies shall be built to specifications and tolerances shown in the provided drawing 5HW01702-101.

4.2 Two right-handed HS dollies shall be a mirror image of the left-handed version shown in drawing 5HW01702-101.

4.3 Both versions of the dolly shall be built according to the provided drawing with the following modifications:

a. Casters (Item 116) shall be replaced with Mcmaster-Carr part number 2468T72 or approved equivalent.

b. Item 220 tapped holes shown in detail view 2B shall be adjusted to allow for attachment of new casters.

c. Eliminate items 113, 114 & 118-121.

d. Eliminate flag note 204 on sheet 2, i.e. do not stencil the cover with “RETURN

TO L-11 BLDG, EAST ENTRANCE, DEPT 33-13”.

e. Detail shown in top left corner of sheet 2 labeled for items 252 & 253 is a detail for item 249.

f. Eliminate items 250, 251, & 255.

g. Eliminate weldments 321 & 325, which include items 322, 324, 326, & 327.

4.4 Individual parts within the design may be substituted for a functional equivalent if written approval is given by a process engineering representative.