PERFORMANCE-BASED WORK STATEMENT (PWS)

CALIBRATION OF EDDY CURRENT TESTING SYSTEM (ETC-2000)

U.S AIR FORCE

309TH MXSG

2/22/2018

Calibration of eddy current testing system (etc-2000)

TABLE OF CONTENTS

1 DESCRIPTION OF SERVICES

2 BASIC SERVICES

3 SERVICES SUMMARY

4 CONTRACT DATA REQUIREMENTS LIST (CDRL)

5 GOVERNMENT FURNISHED PROPERTY AND SERVICES:

6 GENERAL INFORMATION

6.1 Hours of Operation

6.2 Environmental Controls

1 DESCRIPTION OF SERVICES

The contractor shall provide all labor, tools, parts, materials, and equipment, necessary to perform an annual calibration and software updates on one UniWest Eddy Current Testing

System ETC-2000.

2 BASIC SERVICES

2.1 Contractor shall perform calibration and software support services on ETC-2000, Serial

Number 1066CB/1069SH. Calibrations will be performed at Hill AFB, UT. During the annual visit for calibrations, the contractor shall update any existing software on the ETC-

2000 system. Software support should cover both the computer database being used and any ETC-2000 software.

2.1.1 ETC-2000 shall be calibrated to the Original Equipment Manufacturers (OEM) specification.

2.1.2 The Contractor shall affix certification stickers/labels to each calibrated item immediately upon completion. In addition, the Contractor shall also provide

Certificates of Calibration for the referenced machine in 2.1 to the Engineering

Lead (EL) or EL designated engineer within six (6) business days after completed calibration. All Certificates of Calibration must reflect the accredited level of calibration. The contractor performing the calibration must perform said calibration to the accredited level of ISO-10012, ISO-9001, and AS-9100

Calibration frequency shall be for a 12-month interval. Certificates shall be provided in electronic pdf format to EL and 809 MXSS Quality Manager.

(CDRL A001)

3 SERVICES SUMMARY

Performance Objective PWS Para Performance Threshold

The Contractor shall provide Certificate of

Calibration

2.1.2 (Satisfactory) when Contractor provides Certificate of Calibration within six (6) business days after completed calibration.

4 CONTRACT DATA REQUIREMENTS LIST (CDRL)

4.1 CDRL Requirements. Contract information data shall be delivered electronically in accordance to the corresponding requirement for each Data Item listed in Table 4-1

(below).

DATA

ITEM

PWS

PARA

TITLE DELIVERY DATE

A001 2.1.2 Certificates of Calibration Within six (6) business days of completion of work

5 GOVERNMENT FURNISHED PROPERTY AND SERVICES:

5.1 No government furnished property will be provided.

6 GENERAL INFORMATION

6.1 Hours of Operation.

6.1.1 Contract shall coordinate with the EL or EL designated engineer one week prior to arriving at Hill Air Force Base.

6.2 Environmental Controls.

6.2.1 The contractor shall be knowledgeable of and comply with all applicable

Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection.

7 ANNUAL MANPOWER REPORT.

7.1.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for LK CMM calibration, maintenance, and repair via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

http://www.ecmra.mil/

7.1.1.1 Reporting Period: Contractors are required to input data for the labor executed during the Period of Performance (POP) for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be recorded anytime during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting

Application (CMRA) help desk.

7.1.1.2 Uses and Safeguarding Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

7.1.1.3 Website User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

8. APPENDICES

A. Acronyms & Abbreviations List

B. Estimated Workload Data

C. Safety, Fire Protection and Health Specification Industrial Safety Requirements http://www.ecmra.mil/

APPENDIX A

ACRONYMS AND ABBREVIATIONS LIST

Acronym/Abbreviation Definition

AF Air Force

AFB Air Force Base

AFMC Air Force Material Command

CFR Code Federal Regulation

CO Contracting Officer

DEPT Department

DOD Department of Defense

FAR Federal Acquisition Regulation

GR Government Representative

OSHA Occupational Safety and Health Act

PBSA Performance Based Service Acquisition

POC Point of Contact

PWS Performance-Based Work Statement

QA Quality Assurance

QAP Quality Assurance Personnel

QCP Quality Control Program

SS Services Summary

USAF United States Air Force

APPENDIX B

ESTIMATED WORKLOAD DATA

1 Each ETC-2000 Serial Number: 1066CB/1069SH

APPENDIX C

SAFETY, FIRE PROTECTION AND HEALTH

SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

OGDEN AIR LOGISTICS COMPLEX

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

Calibration of

EDDY Current Testing System

25 Aug 2017

OO-ALC/SE

Control Number: TH170805

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements.

The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

3. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

4. All contractor personnel shall be trained and qualified to perform their duties safely.

5. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

6. Per AFPAM 91-210, para 6.4, due to non-hazardous nature of work, a Safety Plan and corresponding site specific checklist is not required.

B. Mishap Notification

1. The contractor shall notify OO-ALC/SE (801-586-6038) or the Hill AFB Command Post

(801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA COR (Contracting Officer's Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally if requested by government personnel or designated government representative

(GR), i.e., the ACO, PCO, or DCMA COR (Contract Officers Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.

Contractor personnel must receive Explosive Safety Awareness Training if their duties require entry into the Explosive Clear Zone. This training will be provided by the OO-ALC

Safety Office. Contact Eric Covington at 586-0168.

A Risk Assessment will be required prior to any work being accomplished, if munitions will remain in the facility.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation

(FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs

BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.

SECTION II – SPECIFIC REQUIREMENTS

PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.

MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07;

and AFI 91-207 AFMC SUP1, The US Air Force Traffic Safety Program, 1 Oct 07. Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Management, applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.

HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA

Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.

Element/Requirement Referenced Benchmark

Contract Safety AFPAM 91-210 Para. 6

Mishap Notification/Reporting Appendix C, Section I

AFI 91-204 Para. 4.9

Facility Fire Protection NFPA 13, 70, & 72

NFPA 409/410

AFI 91-203 Chapters

6, 22

Handling, Storage and use of Flammable/ NFPA 30, 33

Hazardous Material Management AFI 32-7086 HAFBSUP 1

Storage and Materials Handling DoDI 4140.62