Final_PWS.pdf
PDF 140 KB Posted
- Attached to
- Dorsett Control Card Repairs Federal contract opportunity
- Solicitation number
- FA8224-18-Q-0015
About this file
Performance-Based Work Statement (PWS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_and_Solicitation.pdf | ||
| FBO_Dorsett_SSJ_V1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
FOR
Dorsett Controls Repair
309th Maintenance Wing
Maintenance Support Group (MXSG)
Hill AFB, Utah
February 6, 2018
PERFORMANCE-BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1 DESCRIPTION OF SERVICES 3
2 BASIC SERVICES 3
3 SERVICES SUMMARY 4
4 GENERAL INFORMATION 5
5 APPENDICES 9
1. DESCRIPTION OF SERVICES
This performance work statement (PWS) identifies the requirement of the 309th Maintenance
Support Group (MXSG) at Hill Air Force Base (HAFB) for a service contract to repair sixty-three (63) Dorsett Control Cards. All repairs will take place at Dorset-Tech Company facility to return cards to Original Equipment Manufacturer (OEM) specifications. The Contractor shall provide all personnel, transportation, support equipment, tools, software, and documentation necessary to perform all control card repairs.
2. SCOPE OF SERVICES
The 309th Maintenance Support Squadron (MXSS) has sixty three (63) Dorsett Control Cards.
The Contractor shall repair thirty (30) type three cards, twenty-seven (27) type four cards, five
(5) type 5 cards and one (1) X talk card, that control the Dorsett HVAC units thoughout the
309th Complexes, to include humidity and temperature controlled work areas. The contractor shall repair the control cards in accordance with OEM specifications and return to 309th MXSG.
3. SERVICES SUMMARY
Performance Objective PWS
Para
Performance Threshold
The Contractor shall repair sixty-three
(63) Dorsett control cards.
2.
(Satisfactory) When the Contractor returns the control cards to the OEM specifications and cards are 100% operational.
4. GENERAL INFORMATION
4.1 MISHAP REPORTING
4.1.1 In the event of a mishap involving government property, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer (CO).
4.1.2 Record and report promptly (within one hour) to the CO and Program Engineer (PE), all available facts relating to each instance of damage to government property.
4.1.3 If the Government elects to conduct an investigation of the accident/mishap, the
Contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
4.2 HOURS OF OPERATION
4.2.1 All repairs will take place at Dorsett-Tech facilities. Therefore, normal business hours for the Contractor to contact the Government are as follows: Monday through Friday, 0700 -1700, with the exception of Federal Holidays.
4.2.2 The Government observes the following federal holidays: New Year’s Day, Martin Luther
King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus
Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If the holiday falls on Sunday, it is observed on Monday. If the holiday falls on Saturday, it is observed on Friday.
4.3 MANPOWER REPORTING
4.3.1 The contractor shall report ALL Contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil/.
4.3.2 Reporting inputs will be for the labor executed during the period of performance for each
Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting
Application (CMRA) help desk.
4.3.3 Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data. User Manuals: Data for
Air Force service requirements must be input at the Air Force CMRA link at http://www.ecmra.mil/.
4.4 QUALITY CONTROL STANDARDS
4.4.1 Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO.
5. APPENDICES
A. Acronyms and Abbreviations List
B. Not Applicable
APPENDIX A
ACRONYMS AND ABBREVIATIONS
Acronym/Abbreviations Definition
CMRA Contractor Manpower Reporting Application
CO Contract Officer
FAR Federal Acquisition Regulation
FY Fiscal Year
HAFB Hill Air Force Base
IAW In Accordance With
OEM Original Equipment Manufacturer
PE 530th CMMXS Process Engineer
PWS Performance-Based Work Statement
SS Service Summary
File details come from the government source that posted it.