PWS_-HTE_Moment_Ties_v3.pdf
PDF 342 KB Posted
- Solicitation number
- FA8224-18-Q-0001
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_FA8224-18-Q-0001.pdf | ||
| Wage_Determination_HTE_Moment_Tie_Repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
HOT TRAILING EDGE (HTE) MOMENT TIE REPAIR-DX RATED MATERIAL
U.S AIR FORCE
309 COMMODITIES MAINTENANCE GROUP (CMXG)
09/21/2017
Hot Trailing Edge (HTE) Moment Tie Repair-DX rated material i
TABLE OF CONTENTS
1 Description Of Services
1.1 Table 1
2 Basic Services
3 Performance Standards
4 General Information
5 Government Furnished Property
1 DESCRIPTION OF SERVICES
This Performance Work Statement (PWS) identifies requirements of the contractor to provide all management, tools, supplies, equipment, and labor necessary to inspect, machine, mill, polish and/or repair the various types of HTE moment ties (See 1.1 Table 1).The contractor shall repair cracks and restore Thermally-Applied Bond Arc/Copper Coating on the following part numbers:
1.1 Table 1
Table 1 Parts to be repaired
Part Number Quantity
DAA3420D130-063 1
DAA3420D130-041 1
DAA3420D130-045 1
DAA3420D130-073 1
DAA3420D130-075 1
DAA3420D118-050 1
DAA3420D118-052 1
2 BASIC SERVICES
Assets will be shipped to/from the contractor’s facility by the Government. The contractor shall have responsibility to safeguard all Government property provided for inspection or repair. In the event of damage or loss of designated components through contractor negligence, the contractor shall bear all cost of repairs/replacement to Government designated components. Assessment by
533 CMMXS/MXDXA and contractor will be performed to determine cause/cost.
3 PERFORMANCE STANDARDS
The inspection and repair will be done according to Standard Repair KN1.03.030 and Command
202# OC-16-26850. Shear Ties DAA3420D118-050 and DAA3420D118-052 not listed on 202 to be repaired to the same specifications. After copper is replaced, the contractor will spot face the areas per Drawing DAA3420A101 and verify there is no split or damaged copper prior to returning to Hill AFB.
Parts will not be sent to outside vendors. All repairs will be done at the contractor’s facility.
Designated components will be tested upon return to Hill AFB to ensure fit and function meet
OEM or Technical Order requirements, if component fails to meet all required standards, contractor shall repair/replace at contractor’s expense.
4 GENERAL INFORMATION
These parts are DX rated.
5 GOVERNMENT FURNISHED PROPERTY
Government Property shall be handled in accordance with the applicable contract clauses. Item identification will be provided by the Government and shall not be removed while in contractor possession.
File details come from the government source that posted it.