This is an amendment to a solicitation for a cost-plus-fixed-fee contract providing contractor logistical support, sustaining engineering, and sustainment repair for the Guided Missile Launcher Electrical Circuit (GMLEC). Evaluation criteria were added specifying that mission capability and past performance are significantly more important than cost or price in the evaluation. The effort involves depot-level repair support of GMLEC hardware and software for the 57 Flight Test Squadron at Vandenberg Space Force Base, California, to ensure three fully mission capable GMLEC sets are available each quarter for Launch Capability Tests prior to Operational Test launches and other tests. The Department of the Air Force Materiel Command Nuclear Weapons Center is the contracting agency.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JSU

2. AMENDMENT/MODIFICATION NO.

FA8214-23-R-7001-0001

3. EFFECTIVE DATE

28 FEB 2023

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFNWC PZBB

6008 WARDLEIGH ROAD BLDG 1580

HILL AIR FORCE BASE UT 84056-5837

BUYER: Carrie E. Evans/AFNWC/PZBB carrie.evans.2@us.af.mil Phone: (801) 777- 8715 Fax: (000) 000-0000 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8214

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA821423R7001

9B. DATED (SEE ITEM 11)

11-JAN-2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8214-23-R-7001-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment to add evaluation criteria.

1. The following evaluation criteria is added to the RFP:

a. Mission Capability Past Performance

b. The above factors are Signicantly More Important than Cost or Price.

2. All other terms and conditions remain the same.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

TRAVEL - BASIC

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

L014

TRAVEL - BASIC

This is a Cost Reimbursement - No Fee, CLIN in support of travel for the GMLEC CLS Contract. Prior approval is needed from both the Program Manager and Contracting Officer for Travel.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA RIGHTS - BASIC

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

L014

DATA RIGHTS - BASIC

DATA RIGHTS - BASIC

This CLIN confirms the Government's purchase of data rights at the initiation of the contract. The contractor shall deliver rights in technical data, computer software documentation and cost/schedule data in accordance wiith Section J, Attachment 2 - Government Rights in Data (GRID).

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA DELIVERABLES - BASIC

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA DELIVERABLES - BASIC

DATA IAW DD 1423-1 ATTACHED IN SECTION J.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

MATERIAL - BASIC

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

MATERIAL - BASIC

1 LO

MATERIAL - BASIC

This is a Cost Reimbursable No - Fee CLIN in support of material requirements GMLEC. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this CLIN shall not be duplicated under any other CLINs. Prior approval shall also be required from the Program Manager and the Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT - BASIC

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT - BASIC

This is a Cost Plus Fixed-Fee CLIN to provide Contractor Logistical Support (CLS) for the Guided Missile Launcher Electrical Circuit

(GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT ENGINEERING - BASIC

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT ENGINEERING - BASIC

This is a Cost Plus Fixed-Fee CLIN to provide sustaining engineering for the Guided Missile Launcher Electrical Circuit (GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Option 1

TRAVEL - OPTION 1

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

L014

TRAVEL - OPTION 1

This is a Cost Reimbursement - No Fee, CLIN in support of travel for the GMLEC CLS Contract. Prior approval is needed from both

Inspection: Destination Acceptance: Destination

DATA RIGHTS - OPTION 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

L014

DATA RIGHTS - OPTION 1

This CLIN confirms the Government's purchase of data rights at the initiation of the contract. The contractor shall deliver rights in technical data, computer software documentation and cost/schedule data in accordance wiith Section J, Attachment 2 - Government Rights in Data (GRID).

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA DELIVERABLES - OPTION 1

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA DELIVERABLES - OPTION 1

DATA IAW DD 1423-1 ATTACHED IN SECTION J.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

MATERIAL - OPTION 1

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

MATERIAL - OPTION 1

This is a Cost Reimbursable No - Fee CLIN in support of material requirements GMLEC. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this CLIN shall not be duplicated under any other CLINs. Prior approval shall also be required from the Program Manager and the Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT - OPTION 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT - OPTION 1

This is a Cost Plus Fixed-Fee CLIN to provide Contractor Logistical Support (CLS) for the Guided Missile Launcher Electrical Circuit

(GMLEC) .

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT ENGINEERING - OPTION 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT ENGINEERING - OPTION 1

This is a Cost Plus Fixed-Fee CLIN to provide sustaining engineering for the Guided Missile Launcher Electrical Circuit (GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Option 2

TRAVEL - OPTION 2

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

L014

TRAVEL - OPTION 2

This is a Cost Reimbursement - No Fee, CLIN in support of travel for the GMLEC CLS Contract. Prior approval is needed from both

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA RIGHTS - OPTION 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

L014

DATA RIGHTS - OPTION 2

This CLIN confirms the Government's purchase of data rights at the initiation of the contract. The contractor shall deliver rights in technical data, computer software documentation and cost/schedule data in accordance wiith Section J, Attachment 2 - Government Rights in Data (GRID).

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA DELIVERABLES - OPTION 2

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA DELIVERABLES - OPTION 2

DATA IAW DD 1423-1 ATTACHED IN SECTION J.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

MATERIAL - OPTION 2

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

MATERIAL - OPTION 2

This is a Cost Reimbursable No - Fee CLIN in support of material requirements GMLEC. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this CLIN shall not be duplicated under any other CLINs. Prior approval shall also be required from the Program Manager and the Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT - OPTION 2

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT - OPTION 2

This is a Cost Plus Fixed-Fee CLIN to provide Contractor Logistical Support (CLS) for the Guided Missile Launcher Electrical Circuit

(GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT ENGINEERING - OPTION 2

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT ENGINEERING - OPTION 2

This is a Cost Plus Fixed-Fee CLIN to provide sustaining engineering for the Guided Missile Launcher Electrical Circuit (GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Option 3

TRAVEL - OPTION 3

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

L014

TRAVEL - OPTION 3

This is a Cost Reimbursement - No Fee, CLIN in support of travel for the GMLEC CLS Contract. Prior approval is needed from both

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA RIGHTS - OPTION 3

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

L014

DATA RIGHTS - OPTION 3

This CLIN confirms the Government's purchase of data rights at the initiation of the contract. The contractor shall deliver rights in technical data, computer software documentation and cost/schedule data in accordance wiith Section J, Attachment 2 - Government Rights in Data (GRID).

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA DELIVERABLES - OPTION 3

Item No.

Not Separately Priced Quantity U/I Unit Price

DATA DELIVERABLES - OPTION 3

1 LO NSP

DATA DELIVERABLES - OPTION 3

DATA IAW DD 1423-1 ATTACHED IN SECTION J.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

MATERIAL - OPTION 3

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

MATERIAL - OPTION 3

This is a Cost Reimbursable No - Fee CLIN in support of material requirements GMLEC. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this CLIN shall not be duplicated under any other CLINs. Prior approval shall also be required from the Program Manager and the Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT - OPTION 3

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

GMLEC CLS SUSTAINMENT - OPTION 3

R425

GMLEC SUSTAINMENT - OPTION 3

This is a Cost Plus Fixed-Fee CLIN to provide Contractor Logistical Support (CLS) for the Guided Missile Launcher Electrical Circuit

(GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT ENGINEERING - OPTION 3

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT ENGINEERING - OPTION 3

This is a Cost Plus Fixed-Fee CLIN to provide sustaining engineering for the Guided Missile Launcher Electrical Circuit (GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Option 4

TRAVEL - OPTION 4

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

L014

TRAVEL - OPTION 4

This is a Cost Reimbursement - No Fee, CLIN in support of travel for the GMLEC CLS Contract. Prior approval is needed from both

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA RIGHTS - OPTION 4

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

L014

DATA RIGHTS - OPTION 4

This CLIN confirms the Government's purchase of data rights at the initiation of the contract. The contractor shall deliver rights in technical data, computer software documentation and cost/schedule data in accordance wiith Section J, Attachment 2 - Government Rights in Data (GRID).

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA DELIVERABLES - OPTION 4

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA DELIVERABLES - OPTION 4

DATA IAW DD 1423-1 ATTACHED IN SECTION J.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

MATERIAL - OPTION 4

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

MATERIAL - OPTION 4

This is a Cost Reimbursable No - Fee CLIN in support of material requirements GMLEC. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this CLIN shall not be duplicated under any other CLINs. Prior approval shall also be required from the Program Manager and the Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

GMLEC CLS SUSTAINMENT - OPTION 4

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT - OPTION 4

This is a Cost Plus Fixed-Fee CLIN to provide Contractor Logistical Support (CLS) for the Guided Missile Launcher Electrical Circuit

(GMLEC) .

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

GMLEC CLS SUSTAINMENT ENGINEERING - OPTION 4

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425

GMLEC SUSTAINMENT ENGINEERING - OPTION 4

This is a Cost Plus Fixed-Fee CLIN to provide sustaining engineering for the Guided Missile Launcher Electrical Circuit (GMLEC) .

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION M

EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

(IAW FAR 12.301(c))

(a) The following factors shall be used to evaluate offers:

Evaluation Factors Order of Importance Mission Capability 01 Past Performance 02

All evaluation factors other than cost or price, when combined, are Significantly More Important than Cost or Price .