MMRT_Performance_Work_Statement_(PWS).pdf
PDF 673 KB Posted
- Attached to
- Missile Mishap Response Team (MMRT)
- Solicitation number
- FA8214-19-R-7001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TEP_Worksheet_FOR_EVALUATION_PURPOSES_ONLY.xlsx | XLSX spreadsheet | |
| Questions_&_Responses.pdf | ||
| Contract_Data_Requirements_List_CDRL.pdf | ||
| Performance_Work_Statement_PWS_22_January_2019.pdf | ||
| FA821419R7001_______0002.pdf | ||
| Questions_&_Responses.pdf | ||
| Contract_Data_Requirements_List_(CDRL).pdf | ||
| TEP_Worksheet_(FOR_EVALUATION_PURPOSES_ONLY).xlsx | XLSX spreadsheet | |
| FA821419R7001-MMRT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR THE
MISSLE MISHAP RESPONSE TEAM (MMRT) PROGRAM
8 January 2019
PREPARED FOR
ICBM SYSTEMS DIRECTORATE, MMIII DIVISION
AIR FORCE NUCLEAR WEAPONS CENTER, HILL AIR FORCE BASE, UTAH 84056
By Melissa Galioto AFNWC/NIAC
MMRT PWS
TABLE OF CONTENTS
PART I – GENERAL INFORMATION
1.0 GENERAL
1.1 DESCRIPTION OF SERVICES/INTRODUCTION
1.2 BACKGROUND
1.3 OBJECTIVES
1.4 SCOPE
1.5 PERIOD OF PERFORMANCE
1.5.1 Phase-Out Period
1.5.1.1 Phase-Out
1.6 LABOR HOUR REPORTING
1.6.1 Labor Hour Reporting/Funds Status Report
1.6.2 Reporting Period
1.7 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES
PART II - DEFINITIONS
2.0 DEFINITIONS
PART III - GOVERNMENT FURNISHED PROPERTY & ESSENTIAL SERVICES
3.0 GOVERNMENT FURNISHED PROPERTY
3.1 ESSENTIAL CONTRACTOR SERVICES
PART IV - CONTRACTOR FURNISHED ITEMS AND CONTRACTOR SERVICES
4.0 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
PART V – SPECIFIC TASKS
5.0 BASIC SERVICES
5.1 SUPPORT REQUIREMENTS
5.1.1 Real World Support
5.1.2 Communications
5.1.3 Response Time
5.1.4 Geographical Support Locations
5.1.5 Geographic Support Lodging
5.1.6 Equipment Maintenance
5.1.7 Equipment Transportation
5.1.8 Interface Requirements
5.1.9 Recovery
5.1.9.1 Types of Recovery
5.1.10 Solid Rocket Motor
5.1.11 Liquid Rocket Motors
5.1.12 Contaminated Equipment and Items
5.1.13 Hazardous Operations
5.1.14 Hazardous Waste Containment
5.1.14.1 Containment
5.1.14.2 Remediation
5.1.14.3 Decontamination
5.1.14.4 Transportation of Hazardous Material for Disposal
5.1.15 Travel
5.1.16 Exercise Support
5.1.16.1 On-Site Exercises
5.1.16.2 Equipment and Personnel
5.1.16.3 Consumable Material
5.1.17 Meeting Support
5.1.17.1 Meetings
5.1.17.2 Meeting Minutes
5.1.18 Purchases
5.1.19 Personnel
5.1.19.1 Training/Certifications
5.1.20 Personal/Equipment Plan
5.1.21 Permits
5.1.22 Non-Disclosure Agreement (NDA)
5.1.23 Physical Security
PART VI – APPLICABLE PUBLICATIONS
6.0 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
TECHNICAL EXHIBIT 1
TECHNICAL EXHIBIT 2
ATTACHMENT 1
PART I – GENERAL INFORMATION
1.0 GENERAL
This is requirement is to provide recovery and remediation for exercises and real world incidents involving Intercontinental Ballistic Missile (ICBM) liquid and solid propulsion assets to include
Minuteman III and Rocket Systems Launch Program rocket motors.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION
The Contractor shall provide all personnel, equipment, storage for equipment, supplies, facilities, transportation, tools, materials, supervision, decontamination, heavy lift capabilities and other items. The Contractor shall also provide services necessary to perform rapid response to the Air
Force Nuclear Weapons Center, ICBM Systems Directorate (AFNWC/NI) liquid and solid rocket motor incidents and exercises except for those items specified as government furnished property. The Contractor shall perform to the standards in this Performance Work Statement
(PWS).
1.2 BACKGROUND
The AFNWC/NI is responsible for acquisition, systems engineering, and depot repair of ICBM propulsion systems. The AFNWC/NI fulfills its mission using facilities throughout the United
States. As a result of the movement or transportation of ICBM assets, incidents can occur. When these incidents arise, explosive and hazardous waste and materials used in the ICBM (as well as those common to vehicle accidents) can be released. Therefore, immediate response is of the essence. The Contractor shall be an integral team member of the Missile Mishap Response
Team (MMRT), working with the AFNWC/NI and other agencies. The Contractor shall be responsible for containment, cleanup, remediation, and disposal of all hazardous waste generated during exercises or real world mishaps, whenever or wherever these assets are transported, stored, tested, and deployed. To ensure readiness, exercises are performed each year. The
Contractor shall provide a response to those exercises as it would in a real world incident.
1.3 OBJECTIVES
Provide rapid response and assistance as required to AFNWC/NI when an ICBM liquid or solid rocket motor incident or exercise requirement is identified.
1.4 SCOPE
The primary responsibilities under this effort include (a) vehicle recovery to include recovery of damaged asset(s) by abnormal means; (b) explosive cleanup and remediation services; and (c) hazardous waste cleanup and remediation. Services include rapid response to incidents, positive seamless communication link, participation in development and update of readiness and response plans, and participation in training exercises. The Contractor shall accomplish complete integration with existing Air Force (AF) capabilities to include communication, breathing air, Level A, B, C, D, and command and control management techniques. The Contractor shall also provide portable decontamination for all MMRT members and any other personnel at the site as needed.
1.5 PERIOD OF PERFORMANCE
The period of performance for this contract is anticipated to be for one (1) Base Year of five (5) months and will include four (4), twelve (12) month options and one (1), seven (7) month option.
The Period of Performance will be as follows:
Base Year 2019
Option Year I 2019
Option Year II 2020
Option Year III 2021
Option Year IV 2022
Option Year V 2023
1.5.1 PHASE-OUT PERIOD
1.5.1.1 PHASE-OUT
The Phase-Out period encompasses the procedures and corresponding time frames necessary to ensure the orderly, efficient and complete transfer of performance responsibility to the follow-on
Contractor, if necessary. During the thirty (30) calendar day Phase-Out period, the Contractor shall comply with all contract requirements and take all actions necessary to ensure that
Warfighter readiness is not adversely impacted. As such, the Contractor shall be required to continue to perform to the standards in this PWS.
1.6 LABOR HOUR REPORTING
1.6.1 LABOR HOUR REPORTING/FUNDS STATUS REPORT
The Contractor shall report all Contractor labor hours including subcontractor labor hours required for the performance of all services provided under this contract for the AF via a secure data collection site. The Contractor is required to completely and accurately submit information as directed at http://www.ecmra.mil the Contractor Manpower Reporting Application (CMRA) or a successor hyperlink/website (CDRL A022). User manuals are available via the ARMY link at the bottom of the website. In addition, the Contractor shall also submit a monthly Contract
Funds Status Reports (CFSR) via e-mail to the Program Manager (PM) by the fifth (5th) business day of each month (CDRL A018).
1.6.2 REPORTING PERIOD
Labor usage will be reported for each fiscal year, which begins October 1st and ends September
30th. Inputs may be made at any time during the year but total inputs shall be made prior to 31
October of each year. Contractors may direct questions to the CMRA help desk. The CFSR shall be reported monthly.
1.7 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The COR assignment will be identified by a separate letter upon contract award. The COR is a
Government function which monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: (a) Assure that the
Contractor performs the technical requirements of the contract, (b) Perform inspections necessary in connection with contract performance, (c) Maintain written and oral communications with the Contractor concerning technical aspects of the contract, (d) Issue written interpretations of technical requirements, including Government drawings, designs, specifications, (e) Monitors Contractor performance and notifies both the Contracting Officer
(CO) and Contractor of any deficiencies, (f) Coordinates availability of government furnished property and (g) Provides site entry of Contractor personnel. A letter of designation issued to the
COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the
COR, especially with regard to changes in cost or price and estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES
All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. Contractors are required to obtain and wear contractor provided badges plainly displayed during meetings or other gatherings where identification of
Contractor personnel is required.
PART II - DEFINITIONS
2.0 DEFINITIONS
CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
CONTRACTING OFFICER (CO). A person with authority to enter into, administer, and/or terminate contracts and make related determinations/findings on behalf of the government.
Note: the CO is the only individual who can legally bind the government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government appointed by the CO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does
NOT have authority to change the terms and conditions of the contract.
PROGRAM MANAGER (PM). The PM has total responsibility and accountability for program success. COs and other Functional managers provide technical and business assistance and support to the PM from outside the program management office.
DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as services, meeting minutes or reports.
PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
PART III - GOVERNMENT FURNISHED PROPERTY & ESSENTIAL SERVICES
3.0 GOVERNMENT FURNISHED PROPERTY
N/A
3.1 ESSENTIAL CONTRACTOR SERVICES
Continuation of Essential Department of Defense Contractor Services during Crisis In
Accordance With (IAW) Department of Defense Instruction 3020.3, AFI 63-124 Paragraph
2.7.2, and Department of Defense Instruction 3020.37. This requirement is not considered mission essential.
PART IV - CONTRACTOR FURNISHED ITEMS AND CONTRACTOR SERVICES
4.0 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
The Contractor shall furnish all supplies, equipment, and facilities required to perform work under this contract. The Contractor shall perform all services to fulfill the requirements of the
PWS.
PART V – SPECIFIC TASKS
5.0 BASIC SERVICES
The Contractor shall provide response, containment, cleanup, heavy lift, vehicle recovery, remediation, personal decontamination, and disposal services for explosive, hazardous, and other waste generated by real world incidents and exercises as directed.
5.1 SUPPORT REQUIREMENTS
5.1.1 REAL WORLD SUPPORT
The Contractor shall maintain a response office location with primary response operations such that the Contractor can respond within the time required to report in person to Hill Air Force
Base (AFB) (per Paragraph 5.1.3) when called upon in the event of real world incidents and exercises.
5.1.2 COMMUNICATIONS
The Contractor shall provide and maintain a communication capability that ensures positive
Contractor notification is available twenty four (24) hours per day, seven (7) days per week, and three hundred and sixty five (365) days per year.
5.1.3 RESPONSE TIME
The Contractor representative shall report to the Air Force Nuclear Weapons Center, Engineering Division office at Hill AFB, Utah rally point as directed by the Government representative in two (2) hours or less after notification or as directed by the PM or Station G chief. Upon arrival, PM or Station G chief will direct the Contractor regarding type of support required and dispatch them to incident command center or other rally point. The Contractor shall have all necessary equipment and personnel ready to deploy within four (4) hours from the official notification of dispatch. The response times listed above apply to all real world incidents and exercises.
5.1.4 GEOGRAPHICAL SUPPORT LOCATIONS
The Contractor shall provide all Contractor support required by this PWS at locations and points between Utah, Wyoming, Montana, Nevada, North Dakota, California, Idaho, Nebraska, Colorado, New Mexico, Alaska, Virginia, Florida, Oregon, Washington, Tennessee, and Hawaii.
Support may require extended operations in remote, extremely hot or cold environments.
5.1.5 GEOGRAPHIC SUPPORT LODGING
While supporting the MMRT at incident locations, the Contractor shall provide lodging for all
Contractor personnel unless the AF has provided lodging for Contractor personnel. Lodging accommodation for Contractor personnel shall be made as close to the incident site as practical to facilitate timely travel to the incident site and recovery time for personnel.
5.1.6 EQUIPMENT MAINTENANCE
The Contractor shall provide reliable equipment that has been maintained IAW Original
Equipment Manufacturer specifications/industry standards or operating specifications.
5.1.7 EQUIPMENT TRANSPORTATION
The Contractor shall transport AF equipment (Table 1) as required to and from incident/exercise sites as directed by the AFNWC/NIAC PM or other designated representative. At minimum, the
Contractor shall transport, load and unload AF handling dolly, Emergency Response (ER) Kits, Minuteman Liquid storage and shipping containers (including live or inert motors, or containers with no contents), and AF enclosed utility trailer (tandem axle 9,000 to 12,000 lbs., 21 to 25 feet in length) as directed. The trailer which will transport this property (Transport Trailer) must have air ride suspension with a minimum length of 40 feet and maximum deck height of forty
(40) inches.
Supplied Air
Trailer
ER Kits PSRE Shipping
Container
PSRE Handling
Truck
ER Command
Trailer
Width 102” Width 108 “ Diameter 70.86” Width 69” Width 120”
Length 288” Height 91.35” Height 61.82 “ Height 44.71” Height 96”
Height 102” Length 88” Length 8.5” Length 21’ to
25’
Gross Weight
10,000 lbs.
Gross Weight 11,540 lbs. Loaded Weight
1850 lbs.
Empty Weight 1540 lbs. Empty Weight
600 lbs.
Empty Weight
550 lbs.
Empty Weight
7,000-9,000 lbs.
Table 1
5.1.8 INTERFACE REQUIREMENTS
The Contractor shall provide approved breathing air and communications equipment that seamlessly interfaces with existing and future AF Level A response equipment to minimize risk to personnel and maintain positive communication control during the recovery process. The AF equipment with which compatibility is currently required is listed in Attachment 1 Level A
Equipment. Changes to the requirements listed in Attachment 1 Level A will be coordinated with the Contractor.
5.1.9 RECOVERY
5.1.9.1 TYPES OF RECOVERY
The Contractor shall provide load and vehicle recovery involving hazardous waste, unstable operations involving 1.3/1.1L explosives, hazardous environments and atmospheres. This includes transportation of contaminated recovered loads including solid and liquid propulsion systems/subsystems, equipment and vehicles including but not limited to vehicles ranging in size from subcompact cars to Class 8 semi-tractors/trailers.
5.1.10 SOLID ROCKET MOTOR
The Contractor shall safely lift and recover up to 150,000 pounds of 1.3/1.1L explosive class solid rocket motors. This will require the use of a fully rotating Crane/Wrecker. In the event the
Crane/Wrecker is equipped with a Remote Control Unit (RCU), the RCU shall be
Electromagnetic Interference/Electromagnetic Compatible (EMI/EMC MIL-STD-461)-approved. Approved procedures will be provided by the Government Incident Commander or designated official.
5.1.11 LIQUID ROCKET MOTORS
The Contractor shall safely recover liquid propulsion systems containing up to 50 gallons of
Nitrogen Tetroxide (NTO) and 50 gallons of Monomethylhydrazine (MMH). This will require the use of a fully rotating Crane/Wrecker. In the event the Crane/Wrecker is equipped with a
RCU, the RCU shall be EMI/EMC/ MIL-STD-461-approved. Crane/Wrecker operator support personnel shall be certified in Level A Personal Protection Equipment and Hazardous Waste
Operations and Emergency Response (HAZWOPER). Approved procedures will be provided by the Government Incident Commander or designated official.
5.1.12 CONTAMINATED EQUIPMENT AND ITEMS
The Contractor shall transport contaminated vehicles, equipment, rocket motors, and hazardous waste as described previously to an approved hazardous waste disposal facility.
5.1.13 HAZARDOUS OPERATIONS
The Contractor shall be certified to recover equipment, damaged assets and loads in exposed hazardous waste hot zones using appropriate personal protective equipment up to and including
Level-A protection as required by the situation.
5.1.14 HAZARDOUS WASTE CONTAINMENT
5.1.14.1 CONTAINMENT
The Contractor shall contain release of hazardous waste to extent practical including: minimizing facility and equipment exposure, containing decontamination residue, and properly packaging hazardous and other waste for shipment to an approved disposal facility.
5.1.14.2 REMEDIATION
The Contractor shall conduct remediation at incident sites regardless of geographic location using Contractor provided equipment, supplies, and personal protective equipment as required.
Should deflagration occur as a result of an incident or during a recovery operation, it shall be the responsibility of the Contractor to decontaminate, transport, and dispose of any affected items as directed by the PM and restore the site to pre-incident condition or near pre-incident condition as environmental statutes and regulations allow.
5.1.14.3 DECONTAMINATION
The Contractor shall decontaminate and restore accident sites, affected facilities, equipment, environment and other related items as necessary to pre-accident condition or environmentally acceptable limits as established by Federal or Local laws/standards. The Contractor shall also provide complete personnel decontamination for all AF and Contractor personnel entering and leaving the hot zone or designated area utilizing Contractor provided equipment.
5.1.14.4 TRANSPORTATION OF HAZARDOUS MATERIAL FOR DISPOSAL
The Contractor shall transport up to 150,000 pounds of 1.3/1.1L explosive class solid rocket motors or propellant, liquid rocket motors containing up to 50 gallons of NTO and 50 gallons of
MMH or any rocket fuel propellant that may have leaked into the environment, facility, or surrounding areas of the affected area including up to 300 gallons of diesel fuel or other materials commonly related to vehicular accidents.
5.1.15 TRAVEL
All travel shall be authorized in advance either verbally or in writing by the CO as the situation allows. The Contractor shall be reimbursed at the same Per Diem rates authorized for government employees. No travel reimbursement will be allowed for travel within a 60 mile radius of Hill AFB for routine meetings and planning sessions unless pre-authorized by the CO.
5.1.16 EXERCISE SUPPORT
5.1.16.1 ON-SITE EXERCISES
The Contractor shall support all exercises (estimate two (2) to four (4) per year). Exercises will last at least one (1) day but not exceed seven (7) days. Exercises will include varying scenarios that are anticipated in the event of an incident which includes launch facilities and over the road accidents. Exercises will be held in conjunction with the AF where capabilities and development efforts will be proven and rehearsed. Geographic locations may include Hill AFB, FE Warren
AFB, Minot AFB, Malmstrom AFB, Vandenberg AFB, White Sands Test Facility New Mexico, and Arnold AFB, Tennessee, but may also be held at other locations. Exercises may or may not be made known well in advance of start time.
5.1.16.2 EQUIPMENT AND PERSONNEL
The Contractor shall provide equivalent support for exercises and real world incidents. The PM or Station G chief will direct the Contractor regarding type of support required and dispatch them to incident command center or other rally point as required. The Contractor shall provide ample environmental protection during all phases of operations for contractor personnel.
5.1.16.3 CONSUMABLE MATERIAL
The Contractor shall provide equipment including semi tractors and trailers which will be destroyed during simulated response. No more than one tractor and one trailer per exercise will be utilized. The AF anticipates the use of vehicles previously designated as totaled or of extremely low value for these exercises. The Contractor shall be responsible for disposing of equipment after equipment is destroyed.
5.1.17 MEETING SUPPORT
5.1.17.1 MEETINGS
The Contractor shall attend and participate in planning meetings to develop capabilities or plan exercises as required by the PM not to exceed six (6) meetings per year of two and one half hours (2 and 1/2 hours) duration with up to two (2) Contractor personnel. The Contractor shall support up to twenty five (25) level 3 IPT meetings per year of up to one and half hours (1 and
1/2 hours) in duration with up to two (2) Contractor personnel. These meetings (planning and level 3 IPT) will be held at Hill AFB, Utah or another location as directed by the PM.
5.1.17.2 MEETING MINUTES
Prior to each meeting an agenda will be provided by the AF. Minutes of each meeting will be recorded by the AF. The AF will also provide an attendance roster, and all attendees (including the Contractor attendees) will be required to provide a signature on the attendance roster at each meeting. A copy of minutes will be distributed to all team members within 14 days after each meeting.
5.1.18 PURCHASES
In the course of exercises, real world missile mishap and incident response and recovery activities, items may become worn, damaged, or the task may require the rental or purchase of a piece of equipment. At the direction of the PM, or authorized representative with approval from the CO, the Contractor shall rent/purchase the required item. All purchases must be authorized by the Contracting Officer prior to the expenditure of funds. Purchased equipment will become the property of the Government.
5.1.19 PERSONNEL
5.1.19.1 TRAINING/CERTIFICATIONS
The Contractor shall provide personnel who are qualified, HAZWOPER certified and experienced in hazardous recovery of critical assets contaminated with hazardous material, with documented certifications of personnel and equipment operators in accordance with 29 CFR
1910 to operate in hazardous environments requiring Level A through D personal protection.
These personnel shall be qualified, certified and have sufficient experience in operating recovery equipment while utilizing Level A through D personal protection gear in an identified Hot Zone.
Copies of all required documentation shall be made available within one (1) working day upon request of CO, COR or PM.
5.1.20 PERSONAL/EQUIPMENT PLAN
The Contractor shall support the AF’s response plan by providing input, to include quantities of personnel and equipment types recommended, to the PM or Station G chief for approval after initial briefing and prior to dispatch. Plan should include support for the expected duration in geographical response area and anticipated weather conditions. PM or Station G Chief will provide final approval of response plan.
5.1.21 PERMITS
The Contractor shall maintain appropriate certifications, licenses, and permits for transporting
Hazardous Waste and other cargoes outlined or anticipated in this effort within and through the following states (to include travel through any states necessary to get to these locations): Utah, Wyoming, Montana, Nevada, North Dakota, California, Idaho, Nebraska, Colorado, New
Mexico, Alaska, Virginia, Florida, Oregon, Washington, Tennessee, and Hawaii. (NOTE:
Recovery operations at Kodiak Island, AK, Kennedy Space Center, FL, Wallops Island, VA, and the Pacific Missile Range Facility, Hawaii are deemed highly unlikely but remain possible response areas). Copies of all required documentation shall be made available within one (1) working day upon request of CO, COR or PM.
5.1.22 NON-DISCLOSURE AGREEMENT (NDA)
Contractor employees shall sign NDA, as necessary, and abide by the NDA requirements.
5.1.23 PHYSICAL SECURITY
The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use, in the event physical security is not provided by the AF.
At the close of each work period Government facilities, equipment, and materials shall be secured.
PART VI – APPLICABLE PUBLICATIONS
6.0 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
Compliance documents: See Table 2 below:
Resource Conservation and
Recovery Act
40 CFR 260-279 Solid and Hazardous Waste
Comprehensive Environmental
Response, Compensation, and
Liability Act (CERCLA) or
(Superfund)
TITLE 42-The Public Health and
Welfare chapter 103
Emergency Response Reporting
Requirements
Federal Water Pollution Control
Act
33 U.S.C. 1251 et seq. Oil spills and cleanup of water
Department of Transportation 49 CFR Chapter I,II, and III Shipping of cargo, truck, train, ship, air
Occupational Safety and Health
Standards
29 CFR 1910 OSHA
Air Force National Incident
Management System
Air Force Instruction 10-2501. ER, Management, and Personnel training
Table 2 – APPLICABLE PUBLICATIONS
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objectives PWS Para
Performance Threshold Surveillance Method
Contractor shall report to AFNWC/NI
Hill AFB UT within 2 hours of notification.
5.1.3 Contractor reports
within 2 hours 100% of the time
Performance thresholds will be periodically monitored.
Contractor shall be ready to deploy for any dispatch situation within 4 hours of notification.
5.1.3 Contractor ready to
deploy within 4 hours
100% of the time
Performance thresholds will be periodically monitored.
Contractor shall Transport AF
Equipment to and from incidents/exercises as directed.
5.1.7 100% of the time Performance thresholds will be periodically monitored.
Contractor shall provide light and heavy recovery and transportation services as outlined in this PWS.
5.1.9.1 through
5.1.12
100% of the time Performance thresholds will be periodically monitored.
Contractor shall contain, clean up, package, remediate, transport, and properly dispose of all materials related to incidents or accidents as outlined in this PWS.
5.1.14 Removal of all
hazardous waste and restoration to pre incident condition or near pre incident condition 100% of the time
100% Copies of compliance/acceptance documents will be made available on demand to
AFNWC/NIA
PM/CO/COR.
Contractor shall decontaminate as required all personnel, facilities, equipment, environment and related areas.
5.1.14.3 100% decontamination
Performance thresholds will be periodically monitored.
Contractor Program Management shall take proactive involvement in exercise planning meetings, level 3 meetings, tabletop exercises, and an active role in real world responses.
5.1.17.1 100% participation Performance thresholds will be periodically monitored.
Contractor personnel shall maintain current HAZWOPER certification.
5.1.19.1 100% of dispatched personnel qualified and trained
Copies of all documents will be made available on demand to
AFNWC/NIA
PM/CO/COR.
Contractor shall purchase services or supplies as approved by CO.
5.1.18 100% of the time Copies of all documents will be made available on demand to
AFNWC/NIA
PM/CO/COR.
Contractor shall maintain Certifications, Licenses, and Permits required for this contract.
5.1.19.1 and
5.1.21
100% of the time, copies will be available in Contractor mobile command center and available on demand
Copies of all documents will be made available on demand to
AFNWC/NIA
PM/CO/COR.
Table 3 – PERFORMANCE REQUIREMENT SUMMARY
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Contract Funds Status
Report
PWS Para 1.6.1
IAW CDRL A018
IAW CDRL
A018
IAW CDRL A018
A018
Labor Hours
PWS Para 1.6.2
IAW CDRL A022
A022
IAW Contractor
Manpower
Reporting
Application http://www.e cmra.mil
Table 4 – DELIVERABLE SCHEDULE
ATTACHMENT 1
Level A Equipment
Level A suit tester Part # 99971
Training Suits 41556 Training PPE
Pass Through 0314-03-011 Placed in suit to facilitate comm and air line pass through.
Escape Bottle 975154 Emergency Egress.
Air Pass Through Kit 980200 Survivair kit pass through.
Kappler Zytron 500 Suit Z5H580 (AF Option) Fully Encapsulating Level A Suit
HazMat Boots AR0B0 Chemical Protective Boot
(Throat Mic) Con-Space CS-HS 0613-00-001 / Connector M55116/2-5
File details come from the government source that posted it.