7_ES7034_ReworkAndRepair.pdf

PDF 38 KB Posted

Attached to
Cutters Federal contract opportunity
Solicitation number
FA821324Q3004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is Attachment 5 (ES7034) REWORK AND REPAIR OF NONCONFORMING MATERIAL for the federal contract opportunity FA821324Q3004 for Cutters. It defines rework as the reprocessing of nonconforming material to completely conform to drawings, specifications or contract requirements, and repair as the reprocessing of nonconforming material to reduce, but not eliminate, the nonconformance to make it usable. The contractor must document rework and repair procedures and submit them to the Government Quality Assurance Representative or Contracting Officer, respectively, for review and approval prior to implementation. The procedures must include the cause of the nonconformance and actions to prevent recurrence. Rework and repair requirements apply to the contractor and their suppliers, vendors or subcontractors. This attachment provides the contractual requirements for handling nonconforming material under the Cutters contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Cutters, newest first.
File Type Posted
FA8213-24-Q-3004.pdf PDF
4_CADPAD_ItemMarkingInstructions.pdf PDF
1_AIRSPECHAZCLASSCOMBINED.pdf PDF
3_ADC_SOW_Jan2018.pdf PDF
10_EDLCombined.pdf PDF
6_SPI_F01-052-8209.pdf PDF
8_JFQR_ACES_CuttersMay2022.pdf PDF
2_REPSHIP_11Mar14.pdf PDF
11_CDRLS24_50025.pdf PDF
9_ItemDescriptionCombined.pdf PDF
5_PHST_SOW_HILL_2023.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)