FA8213-21-R-3007 Attachments.PDF
PDF 7 MB Posted
- Attached to
- SMDC/GAS INITIATOR
- Solicitation number
- FA8213-21-R-3007_SMDC_GAS_INITIATOR_Solicitation
About this file
This is a Contract Data Requirements List (CDRL) specifying seven data items required from the contractor to support a federal contract for initiator cartridges. The CDRL requires the contractor to provide: an Ammunition Data Card (ADC) input into the Worldwide Ammunition-data Repository Program (WARP) and submitted via WAWF for each production lot; an Engineering Change Proposal (ECP) submitted electronically for any proposed engineering changes; a Notice of Revision (NOR) submitted electronically for any proposed revisions; a Request for Variance (RFV) submitted electronically for any requested variances; a Lot Acceptance Test Plan submitted through WAWF at least 90 days prior to testing; a Lot Acceptance Test/Inspection Report submitted within 30 days of testing completion through WAWF; and a Failure Summary & Analysis Report submitted electronically in the event of any test failures. The data items aim to support traceability, configuration management and quality assurance for the initiator cartridges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA821321R3007 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
1377012047439ES*
E. CONTRACT/PR NO.
FD2020-21-50069
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Ammunition Data Card (ADC)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80043B
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHJ
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. The electronic receiving report shall also be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at: https://wawf.eb.mil.
BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.
Government agencies only, (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
BLK 10,12,13: Submit after successful Lot Acceptance Test and prior to delivery of each production lot.
BLK 14: A sample ADC or "draft" will be generated and submitted for each part number/NSN produced under this contract using the Worldwide Ammunition-data Repository Program (WARP) system to ensure general format and content is acceptable prior to final ADC submittals.
Sufficient hard copies of final version ADCs shall be generated for each individual production lot from the Worldwide Ammunition-data Repository Program (WARP) such that at least one hard copy per production lot shall be provided with each individual CLIN shipment/destination. An electronic copy for each production lot shall be submitted/uploaded with the electronic receiving report through WAWF to AFLCMC/EBHJ using DoDAAC FA8213.
*1377014551511ES.
FOB DESTINATION
EBH 20-169-002
Terry McCurdy, AFLCMC/EBHTC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
Included with item(s) shipped
Sample ADC via
WARP sys only
15. TOTAL 0 1 0
G. PREPARED BY
mccurdy.terry.d.1075978215
H. DATE
2020/06/17
I. APPROVED BY
hargrove.eric.v.1167016843
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP TM OTHER SESS
A002
Engineering Change Proposal (ECP)
DI-SESS-80639E
LT
ASREQ
BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of notice of revision shall contain all information required by DD Form 1692.
BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed engineering change shall be by signed contract modification.
BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.
Government agencies only, (Administrative/Operational Use) (Date of restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE--Destroy by any method that will prevent
BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipients listed below. Refer to contract for e-mail address of the Government Contracting Officer
(AFLCMC/EBHKB).
robert.morgan.27@us.af.mil (AFLCMC/EBHTC)
AFLCMC/EBHJ 1 1 0
AFLCMC/EBHTC 1 1 0
AFLCMC/EBHKB 1 1 0
DCMA/QAR 1 1 0
DCMA/ACO 1 1 0
15. TOTAL 5 5 0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A003
Notice of Revision (NOR)
DI-SESS-80642E
BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Notice of Revision shall contain all information required by DD Form 1695.
submittal of data. The Letter of Transmittal shall be used only for
BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed engineering change shall be by signed contract modification.
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
AFLCMC/EBHEC 1 1 0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A004
Request for Variance (RFV)
DI-SESS-80640E
BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Request for Variance shall contain all information required by DD Form 1694.
submittal of data. The Letter of Transmittal shall be used only for
BLK 8: Government Engineer will perform review of the RFV. Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval shall be signed contract modification (AFLCMC/EBHKB).
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
EBH 20-169-001
AFLCMC/EBHTC 1 1 0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP TM OTHER QCIC
A005
Lot Acceptance Test Plan
DI-QCIC-80553A
DD
BLK 4: Contractor format required.
BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.
BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHJ.
Government agencies (Administrative/Operational Use) (Date of restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
BLK 10,11, 12, 13: The contractor shall provide a Acceptance Test Plan after contract award and at least 90 days prior to Lot Acceptance Testing allowing for 30 day approval time. No changes to previously approved government Acceptance Test Plans shall be made without prior notification of AFLCMC/EBHJ. Engineering approval in accordance with Airmunitions Specification.
BLK 14: Report shall be in Microsoft Office software or PDF format.
Submit through WAWF, DoDAAC, FA8213.
DoDAAC,FA8213
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP TM OTHER NDTI
A006
Test/Inspection Report
Lot Acceptance Test
DI-NDTI-80809B
BLK 4: Contractor's format is acceptable.
Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals
Government agencies only (Administrative/Operational Use) (Date of
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
BLK 10,12,13: Submit within 30 calendar days after completion of each Lot Acceptance Test.
BLK 14: Test plan shall be in Microsoft Office software or PDF format. Submit through WAWF, DoDAAC, FA8213.
DoDAAC, FA8213
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A007
Failure Summary & Analysis Report
DI-SESS-80255B
BLK 4: Contractor's format required for both the Preliminary and Final report.
submittal of data. The Letter of Transmittal shall be used only for requirement calendar days after receipt by AFLCMC/EBHJ.
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
BLK 14: Report shall be in Microsoft Office software or PDF format.
Submit via e-mail to cognizant Hill AFB Contracting Officer.
Contr. Officer 0 1 0
Hill AFB, UT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FD2020-21-50069A
B001
TEST REPORT
DI-NDTI-80603A
Airmunition Specification
SD
1TIME
BLK 4: Follow format per DID. Incorporate the following applicable requirements:
a. Dimension and tolerances specified on the manufacturing data shall be listedin one column with the actual corresponding reading obtained from inspection of the part, listed in another column.
b. Material utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable data requirements.
c. Certification that identification markings, i.e., part number per MIL-STD-130 and Federal Supply manufacturer (FSCM) per H4-1 Cataloging Handbook (if applicable) have been complied with.
d. The test report will be certified by the responsible DCMA/QAR.
(Authorization for any deviations from the requirements specified by themanufacturing data must be obtained from the procuring agency prior to inclusion in the test report).
Lot Number, National Stock Number, and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil.
Government agencies (Administrative/Operational Use)(Date of Contract Award). Other requests for this document shall be referred to
AFLCMC/EBHJ.
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
BLK 12: Submit no later than 30 calendar days after completion of First Article Acceptance Testing. Submit through Worldwide Ammunition-data Repository Program (WARP) and WAWF under DoDAAC
FA8213.
EBH 20-182-005
DoDACC, FA8213
2020/06/30
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FD2020-21-50069A
B002
First Article Qualification Test Plan and Procedures
DI-NDTI-81307A
BLK 4: Contractor's format required.
Lot Number, National Stock Number, and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals working days of receipt by AFLCMC/EBHJ.
Government agencies (Administrative/Operational Use) (Date of
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export
BLK 10, 11, 12, 13: The contractor shall provide a Qualification Test Plan/Procedures 30 days after contract award, allowing for 30 days approval time. No changes to previously approved government Test Plans shall be made without prior approval from AFLCMC/EBHJ Engineering approval, IAW Airmunitions Specification.
BLK 14: Submit reports electronically in Microsoft Office software or PDF format to addressee listed in block 16.
EBH 20-182-005
15. TOTAL 0 0 0
CDRLs_21-50069
CDRLs_21-50069A
ATTACHMENT 2
USAF & USN CAD/PAD STATEMENT OF WORK - AMMUNITION DATA CARDS
January, 2018
1. Ammunition Data Cards (ADC) shall be prepared in accordance with MIL-STD-1168 (current revision) and shall follow the format required by the application identified as Worldwide Ammunition-data Repository Program (WARP). All of the requirements of MIL-STD-1168 apply but some are tailored in accordance with MIL-STD-962 to meet CAD/PAD program requirements as listed below.
2. The criteria and procedures for the assignment of lot numbers for energetic materials
(pyrotechnics, propellants, explosives) including their constituents shall be in accordance with
MIL-STD-1168.
3. All energetic materials (pyrotechnics, propellants, explosives) used in assemblies and sub-assemblies/components (i.e., igniter cartridges, delay elements, primer assemblies, explosive cord, etc.) shall be entered in the ADC using the common name, actual/original manufacturer’s part number & revision, lot number, and date of manufacture. Traceability shall be ensured by the original manufacturer’s documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR) Quality Inspection Record (QIR), Quality Assurance Documents (QAD), Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall.
4. The contractor may list their own internal part number for energetic material that they re-designate or re-characterize but must also list the actual manufacturer’s part number, lot number, and date of manufacture in parentheses in a format that is searchable in WARP. Any GFM/GFP provided under contract to the vendor should retain government provided part/lot numbers and nomenclature to retain traceability. Ingredients which are used to synthesize or that are blended in a process to make the end item energetic material are not required to be listed. Examples of blended or synthesized energetic materials that shall be listed are HNS, Lead Azide, BKNO3, ZPP, HES 8028, etc. If the ages of energetic materials are older than the ages specified on the Airmunitions Specification or as specified elsewhere in the contract at the time the CAD/PAD devices become hermetically sealed, the date of energetic material recertification or any associated approved Request for Variance (RFV) shall be notated in the waivers and deviation description section.
5. Hardware components shall be fully traceable and identified by the original manufacturer’s lot identification information/documentation or qualified distributor’s documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR), Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall. The actual date of manufacture is not required for any non-age degradable materials such as metal housings, tubes, sleeves, firing pins, nuts, bolts, washers, etc. The COC, COA, QAR, or Batch Record date(s) may be used for the DOM. Epoxies, sealants, curative, O-rings, and other organic materials shall be fully traceable to OEM with DOM and traceable via the original manufacturer’s lot identification documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR) Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall. Materials or components that do not affect the reliability or safety of the end item (i.e., solvents, paints, lacquers, labels, dust caps, etc.) do not need to be listed on the ADC.
6. The ADC data and information entered in WARP for all materials and components ideally shall stand alone for traceability to the actual manufacture’s information (i.e. Mfg P/N, Mfg date (as applicable), Mfg lot number etc.). If contractor uses their own P/N, reference date for acceptance or other “trace”/traceability identification used internally for the non-critical piece parts/materials, it shall be noted in the remarks section, i.e. “trace ID, or PO used for the
ATTACHMENT 2 (continued) following piece parts: (parts shall identified/listed)”, provided the field/entry method is searchable in WARP. If traceability documentation is “questionable” or in conflict and needs clarification, the applicable engineer or equipment specialist shall be contacted to resolve any issues.
7. A “sample” ADC is generated in WARP the first time an ADC is submitted by the contractor for applicable government reviews and approvals. Upon approval of the sample ADC, a final version for each production lot shall be completed in WARP and uploaded for Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT - formerly WAWF) for review and acceptance prior to shipment of product by the applicable government authority. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system. The sample ADC does not require the use of a “Z” interfix number used to identify it as a sample.
8. If any unique situations exist that may conflict with compliance, a resolution should be proposed by the contractor prior to contract award to determine possible work-around.
9. A hard copy of the applicable ADC(s) shall also be included with each shipment per applicable
ADC CDRL.
WARP will reside within the Munitions History Program (MHP). Additional details on these WARP applications are provided below.
MHP-WARP Access Procedures
• Government or Contractor employee with CAC and AKO account:
(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/
(b) Enter CAC PIN when prompted
(c) Click on WARP (ADC)
(d) Click on Help
(e) Click on WARP Request Access and follow instructions
• Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website:
http://iase.disa.mil/pki/eca/index.html A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.
• After the required certificate is obtained:
(a) Click on the MHP-WARP hyperlink: https://mhpwarp.redstone.army.mil/
(b) Enter ECA password
(c) Click on Help and follow the instructions for obtaining the necessary access
• HELP Numbers are as follows:
MHP Access – (256)313-2143; DSN 897-2143 JMC Quality Administrators for WARP issues – (309)782-2697 or (309)782-7107 https://mhp.redstone.army.mil/ http://iase.disa.mil/pki/eca/index.html https://mhpwarp.redstone.army.mil/
ATTACHMENT 2 (continued)
• Worldwide Ammunition-data Repository Program (WARP)
An online user’s manual will provide additional help and criteria in the development of an ammunition data card. It is recommended that you download and read the user’s manual prior to creating and filling out your initial ammo data card. The user's manual also contains screen shots, which depict what the data entry person will see during the ADC input process.
• Ammunition Data Card Input
ADC input allows current contractors and government facilities the capability to create, and submit for approval, both sample ADCs and production lot ADCs which meet the format requirements of MIL-STD-1168 and as specified in this SOW for ADCs. ADCs are automatically forwarded to the respective Government Agency Responsible for Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the ADC to the database. The contractor’s data entry person is granted access only to ADCs identified with its specific manufacturing code, as identified in MIL-HDBK-1461, Manufacturer's Symbols. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.
• Email Notification WARP provides immediate, automated notification to process participants when actions are required. When the producer has completed an ADC submission, an email message is routed to the GARA advising that an ADC awaits review and approval. If the GARA approves the ADC as submitted, the ADC is released to the WARP database and an email, with approved data card, is routed back to the originator. If the ADC requires modification or correction to conform with MIL- STD-1168 and/or the approved format and technical content as approved by the government, an email is provided to the ADC originator advising that corrective action is required prior to approval.
• Information Updates It is important that the System Administrators are apprised when a producer receives a new contract. The producer shall notify usarmy.RIA.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer's identification symbol and the names of the individuals who will be inputting ADCs into the system. If you are a new producer and do not have a Manufacturer's identification symbol, you can obtain one by sending an email to usarmy.RIA.jmc.mbx.warp@mail.mil. The email must contain manufacturer's name, address where performance of the contract will take place, and a point of contact.
(End of statement of work)
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 04 JUNE 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO 406 SCMS/GULAA, (PACKAGING DIVISION), HILL AFB, UTAH 84056.
DESTRUCTION NOTICE: FOLLOW THE PROCEDURES IN DOD 5220.22-M, NATIONAL INDUSTRIAL SECURITY PROGRAM OPERATING MANUAL (NISPOM), SECTION 5-705, OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM, CHAPTER VI. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
NOTE: THE ABOVE POP MARKINGS
ARE FOR DOD USE ONLY.
AutoCAD SHX Text
2169 MOD
FORM
MARCH 87
COMPUTER GENERATED
SPI NO. F01-455-1511
SPECIAL MARKINGS:
A) SPI NO. F01-455-1511
B) PROPER SHIPPING NAME: CARTRIDGES, POWER DEVICE
PACKAGING WAS MANUFACTURED.
C) UN POP MARKING:
**THE LAST TWO DIGITS OF THE YEAR DURING WHICH THE
CLOSURE:
LEVEL B:
LEVEL A:
USA/DOD/AF70
n
4G/Y25/S/**
UN0276
u
PART OR DRAWING NO.
SPECIAL PACKAGING INSTRUCTION
ITEM NOMENCLATURE
MILITARY PRESERVATION IAW MIL-STD-2073
PRESERVATIVE: N/A
CLEANING & DRYING: IAW MIL-STD-2073
MARKING IAW MIL-STD-129
UNSERVICEABLE METHOD: 41
QUP
ICQ
MULTIPLE PART NUMBERS
ORIGINAL
SENSOR ASSEMBLY, CABIN
07038
DATE
AUTH.
CHK.
1377-01-455-1511 ES
NATIONAL STOCK NO.
CURRENT
REV
P.S.
ILL.
98747
CODE ID
DODPOPHM/USA/DOD/AF70/TR14002
SHEET 1 OF 5
SPI NO. (TPO)
SEE NOTICE 1
LEVEL A LEVEL B
LENGTH WIDTH DEPTH
VARIES
10 3/8
AS SPECIFIED BELOW AND BILL OF MATERIALS
SPEC STYLE TYPE CL VRTY GR TR
REVISIONS
DESCRIPTION
VARIES
CNTR I.D.
LTR
ITEM DIM
ITEM WT.
CNTR O.D.
GROSS CU FT
GROSS WT LBS
DESIGN FRAGILITY G
ASTM D6251
ASTM D5118
LEVEL
PACKING
DATE
10 3/8
16 3/4
1.043
D. NAY J. HARMON J. BURLEIGH N. CORONADO
F01-455-1511
D) REUSABLE CONTAINER & DUNNAGE DO NOT DESTROY.
RSC
III
V3c
C
IAW ASTM D1974 SEALING METHOD C
IAW ASTM D6251
MARK THE SPI NUMBER ON THE IDENTIFICATION SIDE OF CONTAINER.
SERVICEABLE METHOD: 41
C
ADDED DISTRIBUTION STATEMENT AND DESTRUCTION NOTICE. ALIGNED BOM WITH DRAWING
18156
2169C MOD
SHEET 2 OF 5
REQD
P/N
QTY
SIZE: (INCHES UNLESS SPECIFIED) TOLERANCES ON FRAC. ± , 18, DECIMAL ± .10, ANGLES ± 1°
NOMENCLATURE OR
SPECIFICATION
MATERIAL
A/R A/R 1 A/R
PACKAGING TAPE WRAP BARRIER BAG CUSHIONING
3 X AS REQUIRED AS REQUIRED 19 X 10 (ID) AS REQUIRED
ASTM D5486 TYPE I OR V A-A-59135 CLASS 1, GRADE B MIL-DTL-117 TYPE I, CLASS F, STYLE 1 A-A-1898 GRADE II, CLASS B OR EQUAL
-4 -3 -2 -1
MUNITION NOTICES
NOTICE 1 : FOR LEVEL A PACKING REQUIREMENTS: THE LEVEL B PACKS SHALL BE OVERBOXED IN A LEVEL A SPECIFIED
CONTAINER SHOWN ON PAGE 1 UNDER PACKAGING LEVEL A. MARK THE OUTSIDE OF THE OVERBOX "OVERPACK." THE
SIZE AND WEIGHT OF THE OVERBOX WILL VARY DEPENDING ON THE NUMBER OF ITEMS BEING SHIPPED. USE FILLER
PAD OF ASTM-D4727, CF, DOM, GR 275 (OR EQUAL) TO ENSURE A TIGHT FIT IN THE OVERBOX.
NOTICE 2: ASSETS PACKAGED IN ACCORDANCE WITH PREVIOUS EDITIONS OF THIS SPI DO NOT REQUIRE REPACKAGING
IF THE INTEGRITY OF THE SPI IS MAINTAINED.
NOTICE 3: SEE SPIRES FOR A COMPLETE LISTING OF NSN's ASSIGNED TO THIS SPI.
NOTICE 4: THIS SPI IS NOT AUTHORIZED FOR USE WITHOUT PROPER HAZARD CLASSIFICATION. UNLESS A FINAL
HAZARD CLASSIFICATION HAS BEEN ISSUED, A COPY OF THE VALID INTERIM HAZARD CLASSIFICATION LETTER ALONG
WITH DOT SP 15448 MUST ACCOMPANY EACH SHIPMENT.
NOTES
1. WRAP EACH ITEM IN CUSHIONING, REF.-3, PLACE IN BAG, REF.-2, REMOVE AIR AND SEAL.
2. PLACE UP TO 6 ITEMS IN SHIPPING CONTAINER, ADD CUSHIONING, REF.-1, AS REQUIRED TO ENSURE SNUG FIT AND TO
PREVENT ITEMS FROM CONTACTING SIDES.
3. CLOSE AND TAPE CONTAINER WITH REF.-4.
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
REVISION OF ISPM NO. 15
REVISION OF WOOD PACKAGING MATERIAL FOR INTERNATIONAL TRADE
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD
PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE
PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND
COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES, RESULTING IN SHIPMENTS WORLDWIDE
(DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES).
WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLETS, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD
PACKAGING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF
HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES).
CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS
COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR
PHYTOSANITARY MEASURES (ISPM NO. 15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
SHEET 3 OF 5
SHEET 4 OF 5
-3
-2
-1
-4
ITEM REFERENCE
REFER TO MIL-STD-129 FOR MARKING
REQUIREMENTS OF PALLETIZED UNIT
LOADS OF AMMUNITION.
SHEET 5 OF 5
REQD
P/N
QTY
SIZE: (INCHES UNLESS SPECIFIED) TOLERANCES ON FRAC. ± , 18, DECIMAL ± .10, ANGLES ± 1°
NOMENCLATURE OR
SPECIFICATION
MATERIAL
20 1 2 2 2 1
EDGE PROTECTORS PLYWOOD STRAPPING, STEEL & SEALS STRAPPING, STEEL & SEALS STRAPPING, STEEL & SEALS PALLET, 4-WAY ENTRY
AS MANUFACTURED 48 X 41 5/8 X 3/8 206 X 3/4 X .023 173 X 3/4 X .023 190 X 3/4 X .023 40 X 48
NSN 8135-00-145-0070 (OR EQUAL) A-A-55057 TYPE A ASTM D3953 TYPE 1, REG DUTY, FIN B, GRADE 2 ASTM D3953 TYPE 1, REG DUTY, FIN B, GRADE 2 ASTM D3953 TYPE 1, REG DUTY, FIN B, GRADE 2 MIL-DTL-15011 STYLE 1, SIZE A, TYPE I, CLASS 1
-6 -5 -4 -3 -2 -1
40 BOXES @ 15 LBS NET PALLET WT PLYWOOD WT STRAPPING WT
600 LBS LBS 65 LBS LBS 16.95 LBS 1.40 LBSLBS
683.35 LBS
CUBE OF PALETIZED LOAD = 48.4
PALLETIZATION PROCEDURE FOR LEVEL B PACK
PALLETIZATION PROCEDURE FOR LEVEL B PACK
Sheets and Views
014551511-SHEET 01
014551511-SHEET 02
014551511-SHEET 03
014551511-SHEET 04
014551511-SHEET 05
NOTE: THE ABOVE POP MARKINGS
ARE FOR DOD USE ONLY.
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 07 FEBRUARY 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO 406 SCMS/GULAA, (PACKAGING
DIVISION), HILL AFB, UTAH 84056.
DESTRUCTION NOTICE: FOLLOW THE PROCEDURES IN DOD 5220.22-M, NATIONAL INDUSTRIAL SECURITY PROGRAM OPERATING MANUAL (NISPOM), SECTION 5-705, OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM, CHAPTER VI. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
NOTES
1. WRAP ITEM WITH REF.-3. PLACE WRAPPED ITEM INSIDE BAG, REF.-2, REMOVE AIR AND SEAL.
2. TO PREVENT BAGS FROM TOUCHING SHIPPING CONTAINER AND PREVENT MOVEMENT USE CUSHIONING, REF.-1
AS REQUIRED.
3. SEAL CONTAINER WITH TAPE, REF.-4.
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
REVISION OF ISPM NO. 15
REVISION OF WOOD PACKAGING MATERIAL FOR INTERNATIONAL TRADE
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD
PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE
PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND
COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES, RESULTING IN SHIPMENTS WORLDWIDE
(DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES).
WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLETS, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD
PACKAGING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF
HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES).
CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS
COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR
PHYTOSANITARY MEASURES (ISPM NO. 15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
MUNITION NOTICES
REFER TO MIL-STD-129 FOR MARKING
REQUIREMENTS OF PALLETIZED UNIT
LOADS OF AMMUNITION.
JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
FAR 9.202(a) and DoD 4120.24M
Section A: Item Identification
1. Stock Number (NSN): 1377-01-455-1511ES
2. Contractor Part Number(s): 6129100
2683100-101-01
3. Noun: Cabin Decompression Sensor
4. Application: B-1B
Section B: Justification for Establishing a Qualification Requirement and Reason Why
Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.
1. Characteristics associated with the manufacture of the Cabin Decompression Sensor, if not correct, would result in product functional degradations. This item performs a critical function on the aircraft and special equipment is required for its manufacture and testing.
Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item.
2. The prospective bidder’s ability to interpret engineering drawings and specifications and the execution of the qualification requirements specified herein are necessary to verify the structural and functional integrity and/or form, fit, and function of the item being procured.
3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft and crew.
4. Completion of the specified pre-contract award qualification requirements will ensure the government that the prospective offeror is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air
Force, only United States and Canada suppliers will be considered. There are sufficient technical and schedule risks, which can only be minimized by completion of the requirements prior to contract award.
Section C: Qualification Requirements That Must be Satisfied to Become a Qualified
Source and Qualification Waiver Requirements.
1. Prequalification Notice. The offeror shall notify AFLCMC/EBHJ CAD/PAD IPT or, if responding to a solicitation, the contracting officer in AFLCMC/EBHKB of intent to qualify as a source for this item.
2. Facilities. The offeror must certify to the design control activity (AFLCMC/EBHJ
CAD/PAD IPT) that they have the required facilities and equipment to manufacture, inspect, test, and package the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
3. Data Verification. A qualification test procedure per DI-NDTI-80604 and a qualification test report per DI-NDTI-80604 shall be provided through the AFLCMC/EBHKB contracting office to the AFLCMC/EBHJ CAD/PAD IPT. Qualification testing must be accomplished in accordance with L431C2027.
4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the items being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity identified in paragraph 2 above. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing sources (DMS) problems.
5. Test and Evaluation or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the item. The government retains the option to inspect the offeror’s production and testing facilities. To allow for government inspection, the offeror’s facilities shall be made available to government inspection during the qualification effort upon 10 days written notice.
6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs 1 to 5 above, the offeror shall build and test the item in accordance with L431C2027 to demonstrate production capability, form and function and also provide an inert Cabin
Decompression Sensor to demonstrate proper fit. This production and testing shall be done at the offeror’s expense.
Estimated likely costs for government-unique testing and evaluation which will be incurred by the potential offeror to become qualified: $5,000 to $50,000 +.
7. Sensitive Military Technology. Not applicable.
8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements, including top level drawing and all related item and source control drawings. In addition the test report shall contain detailed documentation describing the testing procedures during production.
This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror is responsible and liable for ensuring compliance with all applicable system and item requirements. The offeror will provide notification to the government of testing and evaluation 30 days in advance so the government can witness, if desired, as well as coordinate needed activities, support, etc.
9. Time Completion Estimate. The design control activity estimates completion of qualification efforts should require 360 days. This is based on complexity and hazards associated with the item and other factors. This is not a deadline but a notification to a potential offeror of the time believed to be required. Events that occur during the qualification process may increase or perhaps decrease, this time depending on individual circumstances.
10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.
11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.
12. Waiver. Any offeror who has had previous experience in the production of the Cabin
Decompression Sensor or other similar items may apply to the design control activity identified in paragraph 2 for a waiver of all or part of the above requirements. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.
13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
Approved Sources: Cage Code Vendor P/N
Chemring Energetic Devices 93455 6129100
UPCO Propulsion Company 17610 2683100-101-01
Section D: Signatures.
X
2018-12-10T15:42:27-0700
SWANSON.DEVIN.D.1385800432
2019-10-11T09:34:22-0600
FLINDERS.KEVIN.G.1231477949
ENGINEERING DATA LIST
DATE:
23 MAY 2017
REVISION: 9 *HISTORY*
CAGE:
43999
PAGE:
NSN:
1377012348510ES
DATA TECH:
Gibson, Kurt J
END ITEM:
B-1 EGRESS
ORGANIZATION/OFFICE SYMBOL:
429 SCMS GUMACB/
MANUFACTURER NAME:
BOEING COMPANY, THE
REFERENCE NUMBER:
L320C2006
NOUN:
INITIATOR,CARTRIDGE
LINE/
SUB CAGE
ENG DRAWING NUM/ ACCOMP
DOC NUM REV
NR
SHEETS
FURN
CODE
DIST
CODE NOUN REMARKS
L 43999 L320C2006 C S INITIATOR, SMDC/CDC TO GAS Gibson, Kurt J 23 MAY 2017
WITH AMENDMENT 1.
NAME: DATE:
L 43999 L0000024 W S FINISH DOCUMENT B-1B
STANDARD ENGINEERING TEXT
Gibson, Kurt J 23 MAY 2017
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
C - CLASSIFIED DOCUMENT.
S - FURNISHED WITH SOLICITATION.
M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH
CONTRACT AWARD.
X - DATA SUPPLIED (NOT IN JEDMICS).
R - FURNISHED BY PCO UPON REQUEST.
P - PARTIAL DOCUMENT FURNISHED.
V - VENDOR DRAWING; (NOT PROVIDED).
G - GOV'T DOCUMENT.
O - OTHERS, CONTRACTOR MUST ACQUIRE.
A- DATA NOT AVAILABLE.
FURNISHED METHOD CODE LEGEND:
Page 1 of 1EDL Version 9Generated by PRPS using Jasper Reports on 06 Jul 2020
18 MAR 2020
REVISION: 12 *HISTORY*
1377012449273ES
Stuart, Michael C
MUNITIONS (B-1 AIRCRAFT)
L320C2002
INITIATOR,PROPELLAN
L 43999 L320C2002 D S D INITIATOR, GAS-TO-SMDC/CDC Stuart, Michael C 18 MAR 2020
L 43999 L0000024 AB S D FINISH DOCUMENT B-1B
Stuart, Michael C 18 MAR 2020
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
Page 1 of 1EDL Version 12Generated by PRPS using Jasper Reports on 06 Jul 2020
19 JAN 2018
REVISION: 9 *HISTORY*
1377012698061ES
Tilton, Richard J
B-1 AIRCRAFT
L 43999 L320C2006 C S INITIATOR, SMDC/CDC TO GAS Tilton, Richard J 19 JAN 2018
WITH AM-1
Tilton, Richard J 19 JAN 2018
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
Page 1 of 1EDL Version 9Generated by PRPS using Jasper Reports on 06 Jul 2020
18 MAR 2020
REVISION: 10 *HISTORY*
1377013758919ES
Stuart, Michael C
MUNITIONS (B-1 AIRCRAFT)
L320C2002
L 43999 L320C2002 D S D INITIATOR, GAS-TO-SMDC/CDC Stuart, Michael C 18 MAR 2020
L 43999 L0000024 AB S D FINISH DOCUMENT B-1B
Stuart, Michael C 18 MAR 2020
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
Page 1 of 1EDL Version 10Generated by PRPS using Jasper Reports on 06 Jul 2020
19 JAN 2018
REVISION: 11 *HISTORY*
1377013840106ES
Tilton, Richard J
B-1 AIRCRAFT
L 43999 L320C2006 C S INITIATOR, SMDC/CDC TO GAS Tilton, Richard J 19 JAN 2018
WITH AM-1
Tilton, Richard J 19 JAN 2018
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
Page 1 of 1EDL Version 11Generated by PRPS using Jasper Reports on 06 Jul 2020
23 MAY 2017
REVISION: 12 *HISTORY*
1377013849246ES
Gibson, Kurt J
B-1 EGRESS
INITIATOR,CARTRIDGE
L 43999 L320C2006 C S INITIATOR, SMDC/CDC TO GAS Gibson, Kurt J 23 MAY 2017
Gibson, Kurt J 23 MAY 2017
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
Page 1 of 1EDL Version 12Generated by PRPS using Jasper Reports on 06 Jul 2020
EDL_012348510
EDL_012449273
EDL_012698061
EDL_013758919
EDL_013840106
EDL_013849246
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .