260FIRSTARTICLE.pdf
PDF 114 KB Posted
- Attached to
- B2 Fitting Mount Federal contract opportunity
- Solicitation number
- FA821224Q0394
About this file
This document contains the First Article Requirements for a federal contract opportunity. The key details are:
The contract opportunity is for a B2 Fitting Mount, NSN 2995012625577RP. The first article quantity required is 1 unit, which will be part of the production quantity. The first article must be manufactured at the same facilities as the production items. Contractor testing is required, and a test report must be submitted within 90 calendar days from the contract date. The first article must be delivered within 90 calendar days from the contract date to the specified address. The government will provide written notice of approval or disapproval within 90 days after receipt of the first article package. Waiver of the first article requirement may be granted under certain conditions, such as if the offeror has previously furnished the same or similar articles to the government. The critical nature of the part requires a first article from a contractor who has not produced the item for an extended period. Detailed instructions are provided regarding material certifications, process certifications, and the first article delivery address.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821224Q0394_______0002.pdf | ||
| FA821224Q0394_______0001.pdf | ||
| ENGINEERINGDATALIST.pdf | ||
| FA821224Q0394.pdf | ||
| 1423CDRL.pdf | ||
| SECTIONC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
08 FEB 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
99167 / 755016
4. NSN
2995012625577RP
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
REQUIRED X NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
The address listed in Block 12.
Mark as "First Article Do not send to Supply."
B. The detailed technical requirements for First Article approval tests are contained in
The specifications included in this contract.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
The address listed in Block 12.
Mark as "First Article
Do not send to Supply."
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.90 calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 11 Mar 2024
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 90 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
The address listed in Block 12.
Mark as "First Article
Do not send to Supply."
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$1,200.0000
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Supply
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by OO-ALC pending disposition instructions from the contractor.
X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the X Government, DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a X Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the X Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 11 Mar 2024
12. REMARKS
Farr, Tosh PNAME: 08 FEB 2024DATE:
12.1 Waiver of first article for offerors who have previously furnished production quantities of similar articles to be granted only by the Engineering Support Activity (see block 11).
12.2 The critical nature of the part requires a first article from a contractor who has never produced the item or has not produced the item for an extended period of time. The government reserves the right to assure all materials and process certifications are correct and to test the item to any or all drawings, specifications, and other contract requirements.
12.3 A vendor will normally be allowed only one attempt to receive full or conditional approval. Failure to receive approval of the first article inspection will, at the discretion of the government result in termination of the contract.
12.4 The contractor shall produce a report on the subject item with all dimensions and tolerances specified on the manufacturing data listed in one column and the actual corresponding reading obtained from the inspection of the part listed on another column.
12.5 Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of the material purchase requests as conforming to applicable data requirements.
12.6 Material processing, including finish requirements (plating, casting, forging, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of the material purchase requests as conforming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than the contractor's facility shall be included.
12.7 First Article Delivery Address:
OO-ALC/809 MXSS/MXDEB
Bldg 849 Attn: Non-Accountable Bay (Dear John Bay) Transportation Office Hill Air Force Base, UT 84056-5713 United States
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Farr, Tosh P
419 SCMS / GU E A
801-777-0927
777-0927
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Farr, Tosh P
419 SCMS / GU E A
801-777-0927
777-0927
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 11 Mar 2024
File details come from the government source that posted it. Updated .