PROGRAM NAME: A-10 THUNDERBOLT II WARHOG

IAW DFARS SUBPART 217.75, ACQUISITION OF REPLENISHMENT PARTS

FA8212-23-R-0002

RFP Posting Description and RFP Preamble Page 2

A. REQUIREMENT:

PN: PN: 160D215009-37 NSN: 1560-01-094-4532FJ, A-10 DOOR, AIRCRAFT, F64

5 YEAR Indefinite Delivery/ Indefinite Quantity (IDIQ) – Single Award

a. MIN QTY: 9EA (includes First Article)

b. Best Estimated Qty (BEQ): 48EA

c. MAX QTY: 57 EA

c. 5 YEAR ORDERING PERIOD: Expires when the MAX QTY has been ordered or end of FY2027 or 30 SEP 2027, whichever occurs first.

*Please Note: The Government is only obligated to the minimum quantity/ guarantee.

1. REQUIRED DELIVERY TIMES: SEE SCHEDULE B. Early/Partial shipment authorized at no additional cost to the Govt.

2. AMSC (ACQUISITION METHOD SUFFIX CODE) G: Source Approval Prior to Award Not Required.

3. Higher Level Contract Quality Certification Required: AS9100

4. IAW FAR 6.205 FULL & OPEN COMPETION AFTER EXCLUSION OF SOURCES:

a. 100% SET-ASIDE TO WOMEN OWNED SMALL BUSINESSES (WOSB) AND ECONOMICALLY DISADVANTAGED WOSB (EDWOSB). NAICS CODE 336413 - Other Aircraft Part and Auxiliary Equipment Manufacturing (1,250 employees). Non-manufacturing rule applies. The prime contractor or the first tier of the set-aside socioeconomic sector shall perform more than 50% of the contract price. This acquisition is compliant to the Small Business Act of 1953.

5. CONTRACT TYPE: FAR DEFINITION OF FIRM-FIXED PRICE (FFP) CONTRACT TYPE

“16.202 Firm-fixed-price contracts.

16.202-1 Description.

A firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss. It provides maximum incentive for the contractor to control costs and perform effectively and imposes a minimum administrative burden upon the contracting parties”.

The Firm-Fixed-Price contract agreement is bi-lateral. Both the Govt and the Contractor is bound by the terms of the FAR’s definition of FFP. Per the FFP definition the Contractor does not have the right to request for relief for “cost experience in performing the contract” regardless if profit is lost or not - nor does the Govt have the legal right to provide such relief per the FAR and the Dispute clause (52.233-1) in the RFP/contract; thus, if such request is received it should be rejected per the Dispute clause. If the Contractor fails to perform and meet the terms of the FFP contract default procedures should start immediately per the Dispute clause.

6. AUTHORITY: IAW FAR 16.501-2(b)(1)(i) “to permit Government stocks to be maintained at minimum levels". A 5 year IDIQ provides the greatest flexibility for supply chain buys to meet reoccurring demands and plus surges while saving both parties time and money.

7. FUND TYPE: 97X4930 CSAG-S Working Capital Funds (WCF). Revolving funds do not expire once obligated on to a production contract.

8. Manufacturer shall build and test IAW the current TDP and AS9100. The DoD manufacturer shall build, test, and deliver serviceable quality A-10 parts to the USAF by the required delivery times IAW the current TDP attached in SECTION J and higher level contract quality requirements in the AS9100. To meet the requirement, the DoD manufacturer is fully responsible for reviewing the entire TDP thoroughly before bidding on the requirement and identifying any discrepancies in a reasonable time to resolve the discrepancy in-order to bid on-time. No Economic Price Adjustment (EPA) is authorized for this requirement. By bidding on the requirement, the offeror certifies as a responsible DoD manufacturer that they are technical capable, have the financial resources, and a complete and current TDP to deliver serviceable assets No Later Than (NLT) the required delivery times in SECTION B.

**PLEASE NOTE: Any deviations to the TDP shall be approved only by the Design Authority (USAF)**

9. TDP Access: The Procurement Contracting Officer (PCO) is the point of contact for TDP access. The current and complete TDP is attached in SECTION J of the RFP/IDIQ and is export controlled. To access the TDP the party must download the TDP from SAM.gov. The TDP is attached to the solicitation notice and is available for 5 years from date of award. The solicitation number is listed in BOX 4 of page 1 of the RFP/IDIQ. Find the solicitation number in SAM.gov, go to the bottom of the notice to “Attachments/Links”, and select the request access button. If you are contractor please e-mail the PCO at leslie.evans.1@us.af.mil with the firm’s CAGE code so that the PCO can verify the firm has an active DD Form 2345, Military Critical Technical Data Agreement, and grant access to the export controlled TDP. The request must be for official business and purpose to bid on the requirement. The PCO is leslie.evans.1@us.af.mil for pre-award and for post-award, the assigned PCO.

10. Foreign Participation Not Allowed. Critical technology involved, export controlled D. The TDP can only be released to U.S.

contractors.

11. On-Time-Delivery (OTD) is Critical to National Security. Contractor shall provide the Government (PM, Engineer, PCO, DCMA IS & QAS) OTD status no less than every month, by the last day of each month, until full delivery via email with a subject line that identifies the purpose (ie..Delivery Status FA8212-22-X-XXXX PN XXXX) IAW FAR Clause 52.242-2, Production Progress Reports (APR 1991).

12. NSN is not CSI per the A-10 Engineer.

13. Non-manufacturing rule applies to this acquisition. Please note that the NMR class waiver for NAICS code 336413 only applies to drones and aircraft launching equipment.

mailto:leslie.evans.1@us.af.mil mailto:leslie.evans.1@us.af.mil

11. Acquisition Subject to Qualification Requirement. Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the military aircraft, the A-10s, and thus the spares are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency; however, only a qualified responsible manufacturer may receive the award per FAR 9.2, Qualification Requirements, and FAR 9.1, Responsible Prospective Contractor. New sources may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS). If the offeror is not a qualified manufacturer at the time of bidding and has not submitted a SAR yet, the bid must include a complete SAR package in order to be accepted as a complete bid and be considered for award. Please note, the Govt intends to award as soon as possible, within 30 days after the RFP closed and the Govt has up to contract award to qualify new sources; however, contract award shall not be delayed to qualify new sources per FAR 9.202 (e). The Contracting Officer need not refer challenges to the qualification requirements to the Small Business Administration (SBA) per FAR 9.202(d).

IAW AFMC FORM 260, FIRST ARTICLE REQUIREMENTS. NOTE: If there is a conflict in delivery schedule SCHEDULE B supercedes AFMC FORM 260.

SVC/FSC Additional Descriptions

Please Note: Each contract stands on its own. The Contractor shall not hold-off on making the first article for this contract even if the Contractor is making a first article for the same NSN on another contract. If the First Article is waived this CLIN quantity becomes part of the production article quantity of the same NSN and shall have the same delivery terms and unit price as the production articles. Post award waivers will require a contract modification to correct the unit price and delivery schedule.

FA8212-23-R-0002

File details come from the government source that posted it. Updated .