ATTACHMENT_4_ADS-B_SOO.pdf
PDF 876 KB Posted
- Attached to
- T-38C Avionics Component Integration and Contractor Logistics Support Federal contract opportunity
- Solicitation number
- FA8211-15-R-0001
About this file
Automatic Dependent Surveillance-Broadcast (ADS-B) Statement of Objectives (SOO)
View the file
Other files for this federal contract opportunity
Show all 50
T-38C Avionics Component Integration and Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
FA821114R0001
T-38C Avionics Component Integration (AvCI)
STATEMENT OF OBJECTIVES (SOO)
Automatic Dependent Surveillance – Broadcast
(ADS-B) Development and Integration
T-38 Systems Program Office (SPO)
AFLCMC/WLDMA
Hill AFB UT 84056
Date 23 October 2014
Page ii of iv
Table of Contents 1 Overview
1.1 Purpose
1.2 Background
2 Objectives
2.1 Development Concept
2.2 Key Performance Parameters
3 Scope of Work
3.1 Administration
3.2 Program Management
3.3 Data Rights
3.4 Quality Assurance
3.5 Corrosion Prevention and Management
3.6 Configuration Management
3.7 Risk Management
3.8 Software Management
4 Engineering Change Proposal
4.1 ECP Content
4.2 System Requirements
5 Test and Test Support Activities
5.1 System Test and Integration
5.2 Developmental Test (DT and Force Development Evaluation (FDE)
6 Certifications and Approvals
6.1 Authority to Test and Authority to Operate
6.2 Platform Information Assurance
6.3 Airworthiness
6.4 CNS-ATM
7 Formalize Change after Successful Test
7.1 Finalize configuration and Release Documents
8 Hardware and Production and Delivery
Page iii of iv
8.1 A Kits - Aircraft Modification Kit
8.2 B Kits – System LRUs
8.3 Production Schedule
8.4 Packaging
8.5 Contract Field Team
9 Diminishing Manufacturing and Material Shortages (DMSMS)
9.1 DMSMS Management
9.2 DMSMS Reporting
9.3 DMSMS Mitigation
10 Government Furnished Equipment
10.1 Systems Integration Lab (SIL)
11 Associate Contractor Agreement
12 Conditions and Assumptions
13 Compliance Directives and Reference Documents
13.1 T-38C Performance Requirements
13.2 Department of Defense Instructions
13.3 Air Force Instructions
13.4 Air Force Manuals & Pamphlets
13.5 Military Standards and Specifications
13.6 Military Handbooks
13.7 Civilian Aviation Directives
14 Deliverables:
15 Technical Data Package (TDP)
Page iv of iv
Table of Tables Table 2-1 T-38C Avionics System Components
Table 6-1 Minimum Documents Required for ATT/ATO
Table 8-1 T-38C Aircraft locations
1 Overview
1.1 Purpose
This SOO provides the basis for a priced proposal to develop and integrate a solution for the Federal Aviation Administration (FAA) Automatic Dependent Surveillance - Broadcast
(ADS-B) system requirement into the T-38C aircraft and avionics system. The requirement is to provide a developed and fully integrated solution to include all drawings, technical data and Time Compliance Technical Order (TCTO) information outlining installation requirements.
1.2 Background
All T-38C that will continue to fly after 1 January 2020 shall have ADS-B Out capability installed with equipment that:
1. Meets the requirements in TSO-C166, Extended Squitter Automatic Dependent
Surveillance – Broadcast (ADS–B) and Traffic Information Service – Broadcast (TIS–B)
Equipment Operating on the Radio Frequency of 1090 Megahertz (MHz)
2. Meets the requirements of Title 14 Code of Federal Regulations (14 CFR) § 91.227
As mandated by the FAA, Full Operational Capability (FOC) must be no later than 1
January 2020.
2 Objectives
2.1 Development Concept
The concept of development shall minimize, to the extent possible impact to the T-38C mission. The Government desires that the Time Compliance Technical Order (TCTO) be accomplished at the field level to reduce aircraft downtime and programmed maintenance impact. Field Level TCTOs are limited to approximately 25 man-hours.
Proposals shall provide an estimate of the time required for equipment retrofit. If the estimate exceeds 25 man-hours, the contractor shall provide a recommended retrofit solution. The related T-38C avionics system components are listed below in table 2-1.
Table 2-1 T-38C Avionics System Components
Part Number Description Supplier CAGE Unit(s) Per
Assembly
34200602-3SRB NAVIGATION UNIT (EGI/INS) Honeywell International Inc. 94580 1
066-01143-0601 TRANSPONDER, MODE S Honeywell International Inc. 22373 1
066-01146-0101 PROCESSOR, TCAS II Honeywell International Inc. 22373 1
2.2 Key Performance Parameters
2.2.1 The ADS-B system shall meet or exceed the current system specifications. Refer to the following documents.
1. Meets the requirements in TSO-C166, Extended Squitter Automatic Dependent
Surveillance – Broadcast (ADS–B) and Traffic Information Service – Broadcast (TIS–B)
Equipment Operating on the Radio Frequency of 1090 Megahertz (MHz)
2. Meets the requirements of Title 14 Code of Federal Regulations (14 CFR) § 91.227
2.2.2 The solution shall integrate with the avionics system components and not compromise current system performance. All equipment shall continue to meet or exceed the current T-38C System Performance Specification. Additionally, the solution shall operate with the replacement components being developed as part of this contract.
3 Scope of Work
3.1 Administration
3.1.1 The Contractor shall perform administrative functions, to include scheduling meetings, arranging facilities, providing status reports, documenting official decisions and actions assigned, and maintaining charter documents, records, and databases referenced within this document.
3.1.2 The Contractor shall appoint a primary Point of Contact (POC) for this contract. This individual shall be the primary representative and have the Contractor’s full authority to act on matters pertaining to the performance of the services under this contract.
3.1.3 To meet the requirements of this contract the contractor shall be required to develop and deliver information to the Government in accordance with the Contract Data Requirements List (CDRL). Where possible the contractor shall submit one CDRL to encompass the program requirements. (e.g. Configuration Management Plan should include the HUD, MDP, ADS-B, VHF Nav/Comm development and integration and overall T-38C avionics system management)
3.1.4 All documents sited in this PWS refer to the base document but shall include the latest revision. Document may be available on ASSIST or other Government document repository sites. (https://assist.dla.mil/online/start/index.cfm) (http://www.e-publishing.af.mil/) (http://www.e-publishing.af.mil/otherpublishingsites.asp)
3.2 Program Management
3.2.1 The Contractor shall develop and deliver an Engineering Change Proposal (ECP). (CDRL
A014)
3.2.2 The Contractor shall develop and maintain an Integrated Master Schedule (IMS). (CDRL
A001)
3.2.3 Kickoff Meeting: The Contractor shall host a kickoff meeting within 30 working days after receipt of order (ARO) and provide meeting minutes within five working days of meeting (CDRL A017)
3.2.4 Technical Interchange Meetings (TIM): The Contractor shall host TIMs as required, at an expected frequency of two per year. Levels of participation will be based on the subject matter. Meeting minutes shall be provided within five working days of the conclusion of the meeting. (CDRL A017)
3.2.5 Program Management Reviews (PMR): The Contractor shall host PMRs to brief program status to Government program office personnel. The Government will coordinate/notify the Contractor of the meeting schedule. There will be a maximum of two meetings per year. The PMR location will alternate between the Contractor’s facility and a government facility. Meeting minutes shall be provided by the Contractor within 5 working days of the conclusion of the meeting. (CDRL A003)
3.3 Data Rights
3.3.1 The Government requires Unlimited or Government Purpose Rights for all developed items, components, processes, computer software, and technical data used in the execution of this contract.
3.3.2 Software procured by the Contractor shall have the licensing agreement(s) assigned or transferred to the Government, giving the Government the same direct rights against suppliers that the Contractor would have.
https://assist.dla.mil/online/start/index.cfm http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/otherpublishingsites.asp
3.3.3 The Contractor shall obtain prior written approval from the Procuring Contracting
Officer (PCO) prior to committing to the use of any private and mixed funds developed items, components, processes, computer software, and technical data which it:
A. Intends to deliver with Limited Rights
B. Intends to deliver with Government Purpose License Rights
C. Intends to deliver with Restricted Rights
D. May have less than Unlimited Rights
E. Will use in the performance of this Contract
F. Cannot meet the requirements outlined in paragraph 3.3.1 through 3.3.2
3.4 Quality Assurance
3.4.1 The Contractor shall implement and maintain a Quality Assurance (QA) program IAW
AS9100 and AS9110 standards as applicable. As part of this QA program the Contractor shall maintain a responsive surveillance system that continually monitors, documents, and corrects deficiencies in processes and procedures. When requested, the Contractor shall allow the Government access to their QA program documents and processes.
3.4.2 The Contractor shall submit a Quality Control Plan. (CDRL A025)
3.4.3 The Contractor Quality Organization shall provide support of requirement peer reviews, monitoring of activities to ensure processes are being followed, review of products generated (e.g., System Change Description) and support of meetings (staff, program status, Technical Interchange, etc.) to ensure compliance with established Contractor quality standards.
3.4.4 Contracting Officer Representative (COR): The Program Office COR(s) will review and approve Contractor submitted metrics and deliverables for purposes of billing and acceptance. Program Office CORs must receive and concur with Contractor-submitted metrics prior to DCMA acceptance of invoices in Wide Area Work Flow (WAWF).
3.4.5 The Contractor will be notified by letter upon contract award of the Primary and
Alternate CORs assigned to this contract.
3.5 Corrosion Prevention and Management
3.5.1 Using MIL-HDBK-1568 as a guide, develop a Corrosion Prevention and Control
Management Plan. (CDRL A034)
3.5.2 Identify production manufacture and repair facility corrosion prevention and control procedures. (AC 43.206 - Inspection, Prevention, Control, and Repair of Corrosion on
Avionics Equipment or equivalent)
3.6 Configuration Management
3.6.1 Using MIL-HDBK-61 for guidance, the Contractor shall develop, implement and maintain a Configuration Management Plan (CMP) that describes how the T-38C configuration documentation is to be maintained during the Contract Period of Performance (PoP)
(CDRL A006). The plan shall describe the processes to:
A. Maintain the existing configuration identification
B. Establish configuration control to evaluate proposed engineering changes and determine affected items and means of approval
1. The Contractor shall perform a Physical Configuration Audit (PCA) to ensure the design matches the specifications of the equipment being delivered to the Government.
2. The Contractor shall perform a Functional Configuration Audit (FCA) to ensure that the equipment being delivered to the Government meets the documented performance specifications and meets or exceeds the performance specifications specified in the T-38C System Performance
Specification.
C. Provide updates to Technical Orders/Technical Manuals in accordance with TM-86-
01N, Attachment 9 of this proposal (CDRL A029)
D. Provide updates to engineering drawings (CDRL A033)
E. Provide change documentation and update the Technical Data Package (TDP) as required for this effort. The TDP is defined in Section 15 of this document. (CDRL
A029)
F. Provide for and deliver to the Government the necessary Configuration Status accounting documents (CDRL A037)
3.7 Risk Management
3.7.1 The Contractor shall develop the criteria, methods, and procedures used for identifying critical risks associated with the implementation of this Contract. Using the latest
Department of Defense (DoD) Risk Management Guide as reference, the Contractor shall implement a risk management process and provide a Risk Management Plan (RMP) that efficiently identifies, analyzes, mitigates, and tracks potential impacts to mission success.
3.7.2 The Contractor shall develop, implement, and maintain a RMP using AFI 63-101/20-101, AFMCI 63-1201 and AFPAM 63-128 as guidance. The RMP will be delivered to and approved by the Government. (CDRL A002)
3.7.3 The Contractor’s RMP shall identify risk, assess or analyze risk and implement procedures to reduce or eliminate risk to achieve program goals.
3.7.4 The Contractor’s RMP shall be implemented by Integrated Product Teams and managed as part of systems engineering/program management processes.
3.7.5 The Contractor shall provide on-going identification, analysis, abatement, and risk tracking.
3.7.6 The Contractor shall maintain a system risk summary and provide regular status reporting of key risk areas to the Government Program Manager.
3.8 Software Management
3.8.1 The Contractor shall design, fabricate, integrate, test, and evaluate the hardware, software, facilities, personnel subsystems, training, and the principle items necessary to satisfy program requirements, and to support and operate the system. This includes the requirements analysis, design, coding and unit testing, component integration and testing, and Computer Software Configuration Item (CSCI) level testing for software. This also includes system development and operational test and evaluation, software quality, configuration management, and support for software.
3.8.2 The Contractor shall develop and maintain a Software Management Plan. (CDRL A021)
4 Engineering Change Proposal
4.1 ECP Content
4.1.1 The ECP shall be Firm Fixed Price (FFP).
4.1.2 The Contractor shall conduct necessary system and design reviews and provide meeting minutes within five working days (CDRL A017). The minimum requirements are:
A. Systems Requirements Review (SRR)
B. Preliminary Design Review (PDR)
C. Critical Design Review (CDR)
D. Test Readiness Review (TRR)
E. Production Readiness Review (PRR)
4.1.3 The ECP shall contain an Integrated Master Schedule (IMS) to encompass all
Government/Contractor interrelationships. (CDRL A001)
A. The IMS shall integrate the tasks of all Government stakeholders and the
Contractor’s teams.
B. The IMS shall use critical path methodology to define and emphasize the program’s critical elements.
C. The IMS shall contain all control points (milestones) and all requirements for reviews, audits, and meetings required by this SOO.
4.1.4 The ECP shall provide a detail system design and include integration into the current T-
38C avionics system.
4.1.5 The ECP shall identify all hardware components by manufacturer, manufacturer source/cage code, manufacture part number, quantity and nomenclature
4.1.6 Software items required to integrate and test the solution shall be identified by developer, developer source/cage code, title, and version identification number. All software executable code, source code (including developer notes) shall be delivered with Unlimited Rights to the Government. (CDRL A005)
4.1.7 The ECP shall Identify and define any environmental qualification testing that may be required to include additional testing that may be required for Commercial Off-The-
Shelf (COTS) or Non-Developmental Items (NDI) that do not meet the T-38C specifications.
4.1.8 The contractor shall develop the overall ESOH risk management approach for the ADS-B system as part of the Systems Engineering (SE) Process per MIL-STD-882 and National
Environmental Policy Act (NEPA).
4.1.9 The Contractor shall perform weight and balance computations of proposed configurations and provide the results to the Government program office and
Government engineering for determination and approval.
4.1.10 The Contractor shall provide drawing and Technical Order (TO) changes for all TOs affected by the aircraft system changes. The contactor shall comply with TM-86-01N, Air
Force Technical Manual Contract Requirements (TMCR). The Contractor shall:
A. Provide mark-ups in accordance with TM-86-01N for all TOs and aircrew flight manuals affected by the aircraft system changes. (CDRL A029)
B. Provide all required changes to the Technical Manuals and installation drawings.
(CDRL A033)
C. Prepare and deliver a Time Compliant Technical Order (TCTO) for the installation of the ADS-B system into the T-38C (CDRL A029)
4.1.11 The Contractor shall provide information and technical support during development of the Technical Engineering Review Board (TERB) and Configuration Control Board (CCB) documentation and provide telephone support during these meetings.
4.2 System Requirements
4.2.1 The Contractor shall design and develop a hardware and/or software solution to provide
ADS-B Out capability IAW the requirements of 14 CFR § 91.227 and TSO-C166.
4.2.2 The Contractor shall complete all integration and test activities required to modify aircraft and associated support equipment.
4.2.3 The Contractor shall ensure that equipment installed on aircraft as a result of this modification meets the antenna and power output requirements of Class A1, A1S, A2, A3, B1S, or B1 equipment as defined in TSO–C166.
4.2.4 The Contractor shall ensure that modified aircraft meet the following performance requirements for Navigation Accuracy Category for Position (NACP), Navigation Accuracy
Category for Velocity (NACV), Navigation Integrity Category (NIC), System Design
Assurance (SDA), and Source Integrity Level (SIL) as defined in TSO-C166:
1. The aircraft's NACP must be less than 0.05 nautical miles.
2. The aircraft's NACV must be less than 10 meters per second.
3. The aircraft's NIC must be less than 0.2 nautical miles.
4. The aircraft's SDA must be 2.
5. The aircraft's SIL must be 3.
6. Changes in NACP, NACV, SDA, and SIL must be broadcast within 10 seconds.
7. Changes in NIC must be broadcast within 12 seconds.
4.2.5 Modified aircraft must be capable of broadcasting the following information, as defined in TSO–C166. The message elements defined in paragraphs 4.2.5 items 7 through 10 and shall be enterable inputs during the appropriate phase of flight.
1. Length and width of the aircraft
2. An indication of the aircraft's latitude and longitude
3. An indication of the aircraft's barometric pressure altitude
4. An indication of the aircraft's velocity
5. An indication that TCAS II is installed and operating in a mode that can generate resolution advisory alerts
6. An indication if a resolution advisory is in effect
7. An indication of the Mode 3/A transponder code specified by Air Traffic Control (ATC)
8. An indication of the aircraft's call sign that is submitted on the flight plan, or the aircraft's registration number
9. An indication if the flight crew has identified an emergency, radio communication failure, or unlawful interference
10. An indication of the aircraft's “IDENT” to ATC
11. An indication of the aircraft assigned International Civil Aviation Organization (ICAO)
24-bit address
12. An indication of the aircraft's emitter category
13. An indication of whether an ADS–B In capability is installed
14. An indication of the aircraft's geometric altitude
15. An indication of the NACP;
16. An indication of the NACV;
17. An indication of the NIC;
18. An indication of the SDA
19. An indication of the SIL
4.2.6 Modified aircraft shall meet the following latency requirements:
1. The aircraft must transmit its geometric position no later than 2.0 seconds from the time of measurement of the position to the time of transmission.
2. Within the 2.0 total latency allocation, a maximum of 0.6 seconds can be uncompensated latency. The aircraft must compensate for any latency above 0.6 seconds up to the maximum 2.0 seconds total by extrapolating the geometric position to the time of message transmission.
3. The aircraft must transmit its position and velocity at least once per second while airborne or while moving on the airport surface.
4. The aircraft must transmit its position at least once every 5 seconds while stationary on the airport surface.
4.2.7 The Contractor shall ensure that the ADS-B Out modification has minimal impact to current configuration and no interference with current aircraft capabilities.
4.2.8 The offeror shall provide schedule timelines for design, development, and integration testing activities and the optional task of aircraft modification to ensure full operational capability (FOC) by 1 January 2020. The proposed dates cannot be earlier than 1
October 2015 due to Government funding procedures. Proposed development/integration timeline must allow sufficient time for fleet retrofit, whether
Government or Contractor install, in order to meet the January 2020 operational need date.
5 Test and Test Support Activities
5.1 System Test and Integration
5.1.1 All performance/environmental test results shall meet or exceed current T-38C
Performance Specifications. Test reports shall be delivered to the Government Program
Office. (CDRL A036)
5.1.2 The developed system and all proposed replacement equipment shall meet or exceed the Mean Time Between Failure (MTBF) rate(s) identified in the Form-Fit-Function &
Interface Specification. (e.g. Mode S Transponder vs. ADS-B capable Mode S
Transponder)
5.1.3 The Contractor shall identify requirements for any additional test or support equipment and deliver requirements to the Government. (CDRL A038)
5.1.4 The Contractor shall install and evaluate the ADS-B system for proper fit in the aircraft.
5.1.5 The ADS-B system installation procedures and hardware configurations shall comply with USAF aircraft hardware and maintenance practices. Reference: 1-1A-XX series
Technical Manuals.
5.1.6 The Contractor shall develop new or adapt existing Acceptance Test Procedures (ATP) for the ADS-B system components/LRUs. (CDRL A036) The Government will provide current system test procedures.
5.1.7 Using the Systems Integration Lab (SIL), the Contractor shall perform the T-38C Avionics
ATP for the ADS-B system equipment and deliver the resulting test report to the
Government. (CDRL A036)
5.2 Developmental Test (DT and Force Development Evaluation (FDE)
5.2.1 The Contractor shall prepare and deliver a pre-DT release letter and configuration memo. (CDRL A015)
5.2.2 The Contractor shall provide inputs to the test team at Edwards AFB for the DT test plan.
5.2.3 The Contractor shall install and evaluate the ADS-B system for proper fit in the aircraft.
5.2.4 The Contractor shall perform on-aircraft ground operational checkout in accordance with the current T.O. 1T-38C-2-12 procedures or newly developed procedures as required.
5.2.5 The Contractor shall perform on-aircraft Electromagnetic Compatibility/Interference
(EMC/EMI) Safety of Flight (SOF) testing and deliver the test report to the Government.
(CDRL A036)
5.2.6 The Contractor shall provide engineering support during DT flight tests at Edwards AFB.
5.2.7 The Contractor shall prepare and deliver a pre- Force Development Evaluation (FDE) release letter and configuration memo.
5.2.8 The Contractor shall assist the test team at Randolph AFB in the development of the FDE test plan.
5.2.9 The Contractor shall provide engineering support during FDE at Randolph AFB.
5.2.10 The Contractor shall support all Government system test review boards, as required.
6 Certifications and Approvals
6.1 Authority to Test and Authority to Operate
The Contractor shall develop and coordinate the documents below with the T-38 Systems
Program Office (SPO) and other government agencies to ensure systems(s) receive
Authority to Test (ATT) and Authority to Operate (ATO). (CDRL A029)
Table 6-1 Minimum Documents Required for ATT/ATO
Document Purpose
Time Compliance Technical Order Installation instruction and required support
Program Introduction Document Test organization requirements and objectives e.g.
instrumentation requirements, data analysis plan
Deficiency Reports Make the test organization aware of potential issues to assign risk
Suggested Flight Test Plans for all phases of testing (DT, FDE)
Test techniques, test points, limitations, and management information
6.2 Platform Information Assurance
The Contractor shall provide information and technical support during the development of the update to USAF Platform Information Technology (PIT), Architecture Analysis
Report (AAR), Security Requirements Tailored Matrix (SRTM) and Risk Analysis for the T-
38C Talon. (CDRL A039)
6.3 Airworthiness
6.3.1 The Contractor shall provide support for airworthiness risk assessment activities.
6.3.2 The Contractor shall comply with all relevant Airworthiness requirements cited in MIL-
HDBK-516B and provide documentation of compliance to the Government and assist with the following processes or approvals: (CDRL A040)
A. Impact Assessment
B. Modified Airworthiness Certification Criteria
C. Risk Assessment
D. System Program Office Engineering and T-38 Chief Engineer approval
E. Air Force Material Command, Director of Engineering Approval
6.4 CNS-ATM
6.4.1 The contractor shall provide technical assistance and act as the T-38C Subject Matter
Expert (SME) for all CNS/ATM compliance requirements. The contractor is responsible for all processes and administration to support the Government in obtaining a CNS/ATM
Type 2 Data Chain Letter of Acceptance (LOA) and all applicable certifications required for any hardware/software development, sustainment and operation efforts. (Reference
AFI63-137)
6.4.2 The contractor shall maintain and update as required for certification currency, all T-38C
CNS/ATM documentation throughout the period of performance IAW AFI63-137. At a minimum, CNS/ATM documentation consists of the following: (CDRL A015)
A. T-38C RNAV/RNP/VNAV/ADS-B Tailored Performance Matrixes (TPMs)
B. T-38C Data Compliance Plan Updates
C. T-38C NavData Architecture Updates
D. T-38C RNAV/RNP/VNAV/ADS-B Performance Assessment (PA)
7 Formalize Change after Successful Test
7.1 Finalize configuration and Release Documents
7.1.1 The Contractor shall prepare release documents for Government approval.
7.1.2 The Contractor shall deliver final drawings and final TCTO(s) requirements
7.1.3 The Contractor shall acquire final release approval from the Government.
7.1.4 The Contractor shall provide all final system documentation and deliverables to the government.
8 Hardware and Production and Delivery The contractor shall provide the necessary Kits/materials to modify 456 aircraft. The
Contractor shall deliver a list of all procurable hardware to include: (CDRL A042)
8.1 A Kits - Aircraft Modification Kit
8.1.1 A Kits will include all components and hardware required to modify the T-38C aircraft to accept the new ADS-B system.
8.2 B Kits – System LRUs
8.2.1 B Kits will include ADS-B system LRU components (Packaged Separately).
8.3 Production Schedule
8.3.1 The Contractor shall provide a projected schedule for kit production and delivery assuming quantities sufficient to modify 456 T-38C aircraft. The schedule should highlight ramp up periods and maximum monthly deliveries once full rate production is achieved.
8.3.2 The Contractor shall provide an equipment fielding/basing plan. (CDRL A010)
8.4 Packaging
8.4.1 All kits will be packaged in accordance with ASTM D 3951-98 (2004)
8.5 Contract Field Team
8.5.1 This is an optional requirement to be exercised at Government discretion.
8.5.2 The Contract shall provide an estimate for system installation by a contractor provided contract field team.
8.5.3 The estimate shall be a Firm-Fixed-Price for a single team to retrofit the aircraft by operating location and should coincide with the Material Fielding Plan. Once an operating location is completed the team will move to the next location. For estimating purposes use table 8-1.
Table 8-1 T-38C Aircraft locations
Operating Locations
(July 2014)
Command
*Assigned
Aircraft
COMBS
Columbus AFB, MS AETC 87 YES Laughlin AFB, TX AETC 65 YES Randolph AFB, TX AETC 90 YES Sheppard AFB, TX AETC 123 YES Vance AFB, OK AETC 66 YES Holloman AFB, NM AFMC 4 NO Edwards AFB, CA AFMC 11 NO Patuxent River, MD USN 10 NO
Number of aircraft may change due to unforeseen circumstances
9 Diminishing Manufacturing and Material Shortages
(DMSMS)
9.1 DMSMS Management
9.1.1 The Contractor shall acquire and deliver the ADS-B system Bill of Materials (BOM).
(CDRL A035)
9.1.2 The Contractor shall ensure all BOM information is entered into the Government and
Industry Data Exchange Program (GIDEP).
9.1.3 The Contractor shall develop and submit a DMSMS Management Plan for managing the potential loss of manufacturers or supplier(s) of parts and/or material required for performance of this SOO. At a minimum, the plan shall address the following: (CDRL
A008)
A. Means and approach for providing the Government with information regarding obsolescence and DMSMS issues
B. Planned resolution of discovered DMSMS issues
C. Parts list screening
D. Parts list monitoring
E. Communication with and availability of information to the Government
F. Means and approach for establishing obsolescence and DMSMS solutions
G. Process for data entry and extraction from predictive tools used. GIDEP shall be used and is the minimum requirement.
9.2 DMSMS Reporting
9.2.1 The Contractor shall prepare and submit to the Government a report upon discovery or notification of any obsolescence issues affecting components utilized in the replacement
ADS-B system. (CDRL A007)
9.2.2 The Contractor shall continue to update the report provided in paragraph 9.2.1 until the issue is successfully mitigated. (Successfully mitigated is defined as “no impact to the
Government or future supportability of the ADS-B system”.)
9.3 DMSMS Mitigation
9.3.1 The Contractor shall be responsible for the costs of investigating part availability, inter-changeability and substitutability, locating part replacement, vendor interface, engineering efforts, testing requirements, drawing changes, and all other actions associated with this SOO/ECP.
9.3.2 During the period of performance the Contractor shall prevent any additional costs from being incurred by the Government due to obsolescence.
10 Government Furnished Equipment
10.1 Systems Integration Lab (SIL)
10.1.1 The Contractor shall have use of the T-38C Systems Integration Lab (SIL), located at the
Boeing St. Louis facility. The use shall be on a non-interference basis and shall be scheduled in advance to preclude schedule and performance conflicts.
10.1.2 Location of SIL:
The Boeing Company
5890 N. Lindbergh Blvd.
Hazelwood, MO 63402
10.1.3 Current T-38C avionics system Acceptance Test Procedures will be provided by the
Government to the awardee.
11 Associate Contractor Agreement
Offeror shall enter into Associate Contractor Agreement (ACA) in the accomplishment of this requirement. The agreement shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the accomplishment of the
AvCI Program Task Orders which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract. (IAW Clause H040 of the basic AvCI contract)
12 Conditions and Assumptions Preliminary Test (PT), and Developmental Test (DT) will be conducted at Edwards AFB, CA.
The Government will provide aircraft, pilots, fuel, and facilities during the test period.
FDE will be conducted at Randolph AFB, TX. The Government will provide aircraft, pilots, fuel, and facilities during the test period.
13 Compliance Directives and Reference Documents The Contractor’s solution shall comply, where applicable, with all of the following standards, regulations, and guidebooks.
13.1 T-38C Performance Requirements
T-38C System Performance Specification, Revision H, dated 14 Feb 2011.
13.2 Department of Defense Instructions
DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology
(IT) (DIACAP)
DoD Directive 4715.1E – Environment, Safety, and Occupational Health
13.3 Air Force Instructions
AFI 33-200, IA Management
AFI 33-210, Air Force Certification and Accreditation (C&A) Program (AFCAP)
AFI 62-601, MIL-HDBK-516B, and AW Bulletins: USAF Airworthiness
AFPD 62-6, USAF Airworthiness
AFI 63-101 Acquisition and Sustainment Life Cycle Management
AFI 63-131 Modification Management
AFI 63-137, Assurance of Communications, Navigation, Surveillance/Air Traffic
Management (CNS/ATM) Navigation Safety, and Next Generation Air
Transportation System (NEXGEN) Performance.
AFMCI 63-1201 Implementing Operational Safety, Suitability, and Effectiveness
(OSS&E) and Life Cycle Systems Engineering
13.4 Air Force Manuals & Pamphlets
AFM 36-2234, Instructional Systems Development, Courseware Development
Standards HQ AETC/A3F
AFPAM 63-119, Certification of System Readiness for Dedicated Operational Testing
13.5 Military Standards and Specifications
MIL-STD-882, Department Of Defense Standard Practice for System Safety
MIL-STD-411, Aircrew Station Alerting Systems
MIL-STD-461, Requirements for the Control of Electromagnetic Interference
Characteristics of Subsystems and Equipment
MIL-STD-464, Electromagnetic Environmental Effects Requirements for Systems
MIL-STD-704, Aircraft Electric Power Characteristics
MIL-STD-1472, Human Engineering
MIL-STD-1787, Aircraft Display Symbology
MIL-DTL-5096, Manuals, Technical: Inspection and Maintenance Requirements;
Acceptance and Functional Check Flight Procedures and Checklists; Inspection Work
Cards; and Checklists; Preparation of
MIL-DTL-38804, Time Compliance Technical Order Specification
MIL-DTL-38807, Technical Manuals - Illustrated Parts Breakdown
MIL-STD-38784, Standard Practice for Manuals, Technical: General Style and Format
Requirements
AFGS-87219B, Electrical Power Systems, Aircraft (Attachment 7)
AFGS-87256, Integrated Diagnostics
13.6 Military Handbooks
MIL-HDBK-516, Airworthiness Certification Criteria
MIL-HDBK-419A, Grounding, Bonding, and Shielding for Electronic Equipment and
Facilities, Volume 1 & 2 (Attachment 15)
MIL-HDBK-454B, General Guidelines for Electronic Equipment (Attachment 16)
The Contractor should contact the government if they have difficulty in locating any of the above listed documents.
MIL-DTL-5920G, Manuals, Technical: Sample Basic Weight Checklists And Loading
Data (Attachment 6)
MIL-DTL-5096G, Manuals, Technical: Inspection and Maintenance Requirements;
Acceptance and Functional Check Flight Procedures and Checklists, Inspection Work
Cards, and Checklists, Preparation of (Attachment 5)
13.7 Civilian Aviation Directives
AS 9100C Quality Management Systems - Requirements for Aviation, Space and
Defense Organizations
AS 9110 Quality Maintenance Systems – Aerospace – Requirements for
Maintenance Organizations
Federal Aviation Administration Advisory Circular, AC 20-153A, Acceptance of Aero
Data Processes and Associated Databases
Radio Technical Commission for Aeronautics, RTCA/DO-200A, Standard for
Processing Aeronautical Data and AC 20-153A, Acceptance of Aeronautical Data
Processes and Associated Databases
Federal Aviation Administration Technical Standard Order, TSO-C166, Extended
Squitter Automatic Dependent Surveillance – Broadcast (ADS–B) and Traffic
Information Service – Broadcast (TIS–B) Equipment Operating on the Radio
Frequency of 1090 Megahertz (MHz)
14 Deliverables:
CDRL
Number
Short Name
Short Name
Full Name Paragraph DID
A001 IMS Integrated Program Management
Report (IPMR)
3.2.2, 4.1.3 DI-MGMT-81861
A002 RMP Contractor’s Risk Management Plan 3.7.2 DI-MGMT-81808
A003 Status Report Contractor’s Progress, Status and
Management Report
3.2.5 DI-MGMT-80227
A004 Report Manhour Estimate, Technical Cost
Proposals
DI-FNCL-81116
A005 Software Applications Computer Software Product End Items
End Items
4.1.6 DI-MCCR-80700
A006 CMP Contractor’s Configuration
Management Plan
3.6.1 DI-CMAN-80858B
A007 Obsolescence Report Progress Report (Studies) 9.2.1 DI-ADMN-81313A
A008 DMSMS Management
Plan
Diminishing Material Shortages and
Material Management Plan
9.1.3 DI-MGMT-81949
A009 Engineering Analysis Human Engineering System Analysis
Report
DI-HFAC-80745B
A010 Field Material and
Basing Plan Management Plan 8.3.2 DI-MGMT-80004A
A011 CAP Corrective Action Plan DI-RELI-80254
A012 Database Database Design Description (DBDD) DI-IPSC-81437A
A013 Analysis Producibility Analysis Report DI-MGMT-80797
A014 ECP Engineering Change Proposal (ECP) 3.2.1 DI-CMAN-80639C
A015
Evaluation Primary
Flight Reference
Endorsement Package
Technical Report-Study/Services 5.3.1, 6.4.2 DI-MISC-80508B
A016 Block Upgrade Process Management Plan DI-MGMT-80004A
A017 Meeting Minutes and
Action Items Report, Record of Meeting/Minutes 3.2.3, 3.2.4, 4.1.3 DI-ADMN-81505
A018 System Change
Description
Revisions to Existing Government
Documents
DI-ADMN-80925
A019
Specification Change
Notices SCN, Requirements Change
Notice
Specification Change Notices (SCN) DI-CMAN-80643C
Number
Short Name
Short Name
Full Name Paragraph DID
A020 AvCI Avionics
Roadmap Management Plan DI-MGMT-80004A
A021 Software
Management Plan Management Plan 3.8.2 DI-MGMT-80004A
A022 Courseware Delivery Web-Based Courseware DI-SESS-81699
A023 ATD Software Changes Computer Software Product End
Items
DI-MCCR-80700
A024 Safety and Health
Mgmt Report
Contractor's Progress, Status and
Management Report
DI-MGMT-80227
A025 Quality Control Plan Management Plan 3.4.1 DI-MGMT-80004A
A026 Safety Plan Environmental Health and Safety Plan
(HSP)
DI-ENVR-81375
A027 Phase-in/out
Transition Plan
Management Plan DI-MGMT-80004A
A028 Government Owned
Equipment Inventory Checklist/Record (ICL/R) DI-MISC-81191A
A029 Document Changes Document Changes
3.6.1 C, 3.6.1 E,
4.1.10 A, 4.1.10 C, 6.1
DI-MISC-80358
A030 DAL Data Accession List (DAL) DI-MGMT-81453A
A031 Property Management
Plan Management Plan DI-MGMT-80004A
A032 Safety Accident/Incident Report DI-SAFT-81563
A033 Drawings Product Drawings/Models and
Associated Lists
3.6.1 D, 4.1.10 B DI-SESS-81000E
A034 Corrosion Prevention Corrosion Prevention and Control
Plan
3.5.1 DI-MFFP-81403
A035 Data for Forecasting Source Data for Forecasting DMSMS 9.1.1 DI-SESS-81656
A036 ATR Acceptance Test Report (ATR) 5.1.1, 5.1.6, 5.2.5 DI-QCIC-81891
A037 CSA Configuration Status Accounting
Information
3.6.1 F DI-CMAN-81253A
A038 Equipment
Requirements List
Maintenance Test and Support
Equipment Requirements List
5.1.3 DI-SESS-80294B
A039 Sys. Architectural
Analysis
DoD Architecture Framework
Documentation
6.2 DI-MGMT-
81644B?
A040 Specifications Airworthiness Specification 6.3.2 DI-SESS-81766
A041 Airworthiness Report Airworthiness Certification Criteria
Report
DI-SESS-81768
A042 Procurable Hardware Provisioning Parts List Section 8 DI-SESS-81715
A043 Corrective Action Plan Contractor’s Corrective Action Plan DI-MGMT-80501
Number
Short Name
Short Name
Full Name Paragraph DID
A044 50/50 Reporting 10 USC 2466 (50/50) Requirements
Report
DI-MGMT-81749A
A045 Cost-Per-Flight-Hour
Report
Technical Report-Study/Services DI-MISC-80508B
15 Technical Data Package (TDP)
1. T-38C Avionics System Performance Specifications
2. T-38C ATD Performance Specifications
3. List of Government Furnished Equipment (GFE) at Suppliers/Vendors
4. GFE List Supplement, Equipment at L-3 DS
5. T-38 System Integration Lab – Avionics
6. T-38 System Integration Lab – Test Equipment
7. T-38 System Integration Lab – Computing Equipment
8. Equipment Planned for T-4 Engine Test Cell
9. Training Support Equipment (Items used for Courseware support)
10. GFE TCNO Computers
11. List of Aircraft Panels in Storage at COMBS facilities
12. Group A Parts Inventory and Consumption
13. Group B Inventory and Consumption
14. T-38C Air Vehicle Drawings
15. T-38C Avionics System Architecture Diagram
16. T-38C Form Fit Function & Interface (F3I) Specifications
17. T-38C Interface Control Documents (ICDs) T-38C Avionics Architecture Diagram
18. GFI T-38C Air Vehicle Technical Manuals
19. List of Software Components
20. T-38C Contractor Furnished Test Equipment List
21. DMSMS Data from predictive Tools/Database
22. ACMI Parameters
23. List of MFL/PFL
24. ATD Equipment at Contractor
25. T-38C ATD Drawings
26. T-38C ATD Architecture Diagram
27. ATD System Interface Control Documents (ICD)
28. GFI T-38C ATD Technical Manuals
29. IMIS Historical Data
File details come from the government source that posted it. Updated .