HSEP Proposed CDRL Package 20210716.pdf
PDF 3 MB Posted
- Solicitation number
- FA8207-21-R-0002
About this file
This document outlines a proposed federal contract solicitation for Hardness Surveillance Electromagnetic Pulse Program testing services in support of the Minuteman III Intercontinental Ballistic Missile program. Key details include:
-
The Air Force Nuclear Weapons Center requires engineering, equipment repairs, site deployment and redeployment, HEMP and SREMP testing, analysis, forecasting, cybersecurity monitoring and documentation to support MMIII hardness surveillance.
-
A qualified, nuclear-certified contractor must furnish a high-energy pulser and supporting equipment, as well as cleared personnel, to perform these services at various locations over a one-year base period and five one-year option periods.
-
The anticipated sole-source contractor is General Dynamics Mission Systems, Inc.
-
The solicitation will be released electronically on SAM.gov with no paper copies distributed. Foreign participation is prohibited.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA820721R0002.pdf | ||
| initial DD254 for HSEP 20210721.pdf | ||
| HSEP PWS 20210716.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Data Requirements List (CDRL) Program: HSEP Hardness Surveillance EMP Program Date: 16 July 2021 Version: 1 Date of Determination: Contract Award Date This is a Proposed CDRL package for HSEP Hardness Surveillance EMP Program. Final reviews from our Functional Experts have not been completed.
1. Introduction
This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program.
The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines
The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DIDs), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.
3. Communications
Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NMED) and the cognizant Program Manager (PM). Copies of all forms and templates noted in this file are available as requested from PM, DMO, or PCO.
4. Codes used in the DD Form 1423
The directions for submittal and approval of data are indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15, and 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.
Code Inspection Acceptance SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)
DD Destination (DD Form 250 or equivalent
Destination (DD Form 250 or equivalent document)
SD Source (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
DS Destination (DD Form 250 or equivalent
Source (DD Form 250 or equivalent document)
Code Inspection LT Letter of Transmittal only NO No inspection or acceptance required XX Inspection and acceptance requirements specified elsewhere in contract S Indicates the contractor’s facility D Indicates the primary destination point
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
Code Description A Approval Required N/A Approval Not Required
4.3 Block 10, Frequency of Submittals
Code Description DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time and revisions R/ASR Revisions as required ASGEN As generated ASREQ As required* DFDEL Deferred delivery DFORD Deferred ordering DFREQ Deferred requisitioning ONE/P One time preliminary draft XTIME Multiple separate submittals (i.e., 2Time, 3Time) EOQ End of Quarter
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
Code Description ATP Authority To Proceed ASGEN As generated ASREQ As required* CDR Critical Design Review CA Contract Award CO Change Order CD Calendar Day(s) CP/REQ Change page/as required CP/O Change page/(only) DCARC Defense Cost and Research Center DFDEL Deferred delivery FQT Formal Qualification Test FCA Functional Configuration Audit PCA Physical Configuration Audit TRR Test Readiness Review SA Supplemental Agreement WD Working Day(s)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Version
The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.
5.2 DID Tailoring
The DID is a specification for the preparation of data. A DID may only be tailored down, never added to. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of Objectives (SOO).
5.3 Scientific and Technical Information (STINFO) Distribution Statement Markings
The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Department of the Air Force Instruction (DAFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to http://quicksearch.dla.mil/ denote the audience for which the data is intended. A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD Manual (M) 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking of all documents:
Distribution Statement A:
Approved for public release. Distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NME.
Distribution Statement C:
Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NME.
Distribution Statement D:
Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to
AFNWC/NME.
Distribution Statement E:
Distribution authorized to DoD Components only for Test and Evaluation (date determination). Other requests shall be referred to AFNWC/NME.
Distribution Statement F:
Further dissemination only as directed by
AFNWC/NME.
5.4 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:
Export Control Warning Statement:
This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 2018 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
When the data is export controlled, include Export Control as one of the reasons IAW DoDI 5230.24 Enclosure 4. Paragraph 2.g.
DoDD 5230.25 is available online at https://www.esd.whs.mil/DD/.
NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.
Note – When distributing export controlled data, include the “Notice to Accompany…” IAW DoDD 5230.25 Enclosure 5, by paper copy or read-me-file.
Destruction Notice:
Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:
For classified documents:
https://www.esd.whs.mil/DD/
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program:
Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.
For unclassified, limited documents:
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Controlled Unclassified Information (CUI) Markings IAW DoDI 5200.48, mark all applicable technical documents with the appropriate CUI markings and CUI legend control box. Note - CUI marking requirements do not affect STINFO requirements, CUI replaces For Official Use Only (FOUO) (when applicable).
5.5 Pricing CDRL Items Separately
If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted. If due date falls on a non-business day, i.e. weekend or holiday, due date is pushed to the next business day.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13, or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. For access to CDRLVue, the contractor must obtain and maintain T-1 eligibility, National Agency Check with Inquiries (NACI).
THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY.
(See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a CDA form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (e.g., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter CDA requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14 or Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
If any deliverables contain classified information, contractor must obtain and maintain T-3 eligibility, National Agency Check with Law and Credit (NACLC). Classified CDRLs and classified documentation are submitted IAW this instruction and are never to be emailed.* Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 and DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.
Outer Envelope:
Address ATTN: AFNWC/NMOS ICBM Security Office
Inner Envelope:
Address ATTN: Name of person for whom the document should be delivered
*A letter of delivery shall be submitted to TopVue https://icbm.topvue.com/topvue-icbm/, when classified data is delivered via the instructions above.
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.
Written Approval
“Written Approval” indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this https://icbm.topvue.com/topvue-icbm/ document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the CDA form, signed and dated by the representative stated in ORG
1. Data items submitted for approvals are NOT automatically approved without government approval.
Approved with Comment or Disapproved
The Contractor shall revise data items “Approved with Comments or Disapproved” IAW the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the “Approved with Comments or Disapproved”, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL
If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification (TDID) number, a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data item’s approval or disapproval.
Should the Government have comments on the data item, the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter IAW the format and timeline noted in block 16. Comments will be assigned one of the following codes:
COMMENT CODE CODE DESCRIPTION
C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., General Officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S Substantive Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data IAW with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
8. Data Accession List (DAL)
During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of the current version, for DID DI-MGMT-81453) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List
The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of an address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list. Any changes to the Attention/To or Contract Info list will not require a contract mod.
ORG#/ Name Address Attention/To Contact Info
ORG1/AFNWC/NMET
Hill AFB UT 84056 Program PM PMs email
ORG2/AFNWC/NMET
Hill AFB UT 84056
Program Engineer Engineers email
ORG3/AFNWC/NM
Hill AFB UT 84056
Alt Program Manager
ORG4/AFNWC/NMED 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
CM afnwc.nies.icbm.conm@us.af.mil
ORG5/AFNWC/NMED 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Software afnwc.nies.software@us.af.mil
ORG6/AFNWC/NMED 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Quality afnwc.nies.qualityoffice@us.af.mil
ORG7/AFNWC/NMES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
IUID/Parts Engineering afnwc.nies.partsengineering@us.af.mil
ORG8/AFNWC/NMED 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Risk Management afnwc.nies.riskmgmt@us.af.mil
ORG9/AFNWC/NMES 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
Safety afnwc.niev.safetymanager@us.af.mil
ORG10/AFNWC/NMES 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
Security afnwc.ni.programprotection@us.af.mil
ORG11/AFNWC/NMES 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
Environmental afnwc.niev.environmentalgroup@us.af.mil
ORG12/AFNWC/NMES 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
Corrosion afnwc.niev.corrosiongroup@us.af.mil
ORG13/AFNWC/NMES 6053 Elm Ln Bldg 1255 Hill AFB UT 84056
Nuclear Surety afnwc.niev.nuclearsuretymanager@us.af.m il
ORG14/AFNWC/NMED 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
TOMA toma.lm@us.af.mil
ORG15/AFNWC/NMA 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Assessment afnwc.niei.fde@us.af.mil
ORG16/AFNWC/NMA 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
WS Integration
ORG17/AFNWC/NMES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
EMI afnwc.nmes.emirequests@us.af.mil
ORG18/AFNWC/NMET 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
FDE afnwc.niei.fde@us.af.mil
ORG19/AFNWC/NMES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
NHS afnwc.nmes.nhs@us.af.mil
ORG20/AFNWC/NMA 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Reference Models mailto:afnwc.nies.icbm.conm@us.af.mil mailto:afnwc.nies.software@us.af.mil mailto:afnwc.nies.qualityoffice@us.af.mil mailto:afnwc.nies.partsengineering@us.af.mil mailto:afnwc.nies.riskmgmt@us.af.mil mailto:afnwc.niev.safetymanager@us.af.mil mailto:afnwc.ni.programprotection@us.af.mil mailto:afnwc.niev.environmentalgroup@us.af.mil mailto:afnwc.niev.corrosiongroup@us.af.mil mailto:afnwc.niev.nuclearsuretymanager@us.af.mil mailto:afnwc.niev.nuclearsuretymanager@us.af.mil mailto:toma.lm@us.af.mil mailto:afnwc.niei.fde@us.af.mil mailto:afnwc.nmes.emirequests@us.af.mil mailto:afnwc.niei.fde@us.af.mil mailto:afnwc.nmes.nhs@us.af.mil
ORG21/AFNWC/NMET 6014 Dogwood Ave Bldg 1258
TE (Alt LTDO) afnwc.nmet.workflow@us.af.mil
ORG22/AFNWC/NXZT 6008 Warleigh Rd Bldg 1580
Cybersecurity afnwc.MMIII.ITsupport@us.af.mil
ORG23/AFNWC/NMASF 6059 Wardiegh Rd Bldg 1204
SELECT Lab
ORG24/AFGSC/A3TT 245 Davis Ave E Ste 256 Barksdale AFB LA 71110 ATTN: Rank First Last Name
Global Strike afgsca3itworkflow@us.af.mil
ORG25/AFNWC/NMLA
6014 Dogwood Ave Bldg 1258
DEMIL
ORG26/406
SCMS/GULAB
6038 Aspen Ave Bldg 1289 SW Hill AFB UT 84056-5805
Provisioning 406scms.provisioning@us.af.mil
ORG27/406
SCMS/GULAA
7973 Utility Dr Bldg 1135
Packaging 406scms.gulaa.contractshill@us.af.mil
ORG28/419 SCMS/GUBA 6051 Gum Ln Bldg 1226
CAV AF kathryn.denning@us.af.mil amanda.parlet.1@us.af.mil
ORG29/75 ABW/SE 7290 8th St Bldg 383
Base Safety
75abw.se.workflow@us.af.mil
ORG30/DCMA/ACO DCMA
Program DCMA
ORG31/AFNWC/NMOF 6008 Wardleigh Rd Bldg 1580 Hill AFB UT 84056
Funds AFNWC.MMIII.Cost@us.af.mil
ORG32/AFNWC/PZ 6008 Wardleigh Rd Bldg 1580 Hill AFB UT 84056
Program CO
ORG33/AFNWC/NMED 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Data Management afnwc.nies.datamgmtoffice@us.af.mil
ORG34/AFNWC/NMES/S
IV
6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
SIV afnwc.nie.siv@us.af.mil
ORG35/AFNWC/AEDC 6020 Gum Ln Bldg 1218 Hill AFB UT 84056
LDTO afnwc.aftc.aedcte@us.af.mil
ORG36/AFNWC/NMOS 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056
ICBM Security afnwc.MMIII.security@us.af.mil
ORG37/406
SCMS/GULAA
7973 Utility Dr Bldg 1135 Hill AFB UT 84056
Hazardous Packaging
406scms.gulaa.hill-hazpackaging@us.af.mil mailto:afnwc.nmet.workflow@us.af.mil mailto:afnwc.MMIII.ITsupport@us.af.mil mailto:afgsca3itworkflow@us.af.mil mailto:406scms.provisioning@us.af.mil mailto:406scms.gulaa.contractshill@us.af.mil mailto:kathryn.denning@us.af.mil mailto:amanda.parlet.1@us.af.mil mailto:75abw.se.workflow@us.af.mil mailto:AFNWC.MMIII.Cost@us.af.mil mailto:afnwc.nies.datamgmtoffice@us.af.mil mailto:afnwc.nie.siv@us.af.mil mailto:afnwc.aftc.aedcte@us.af.mil mailto:afnwc.MMIII.security@us.af.mil
10. CDRL Master Listing Index
Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.
CDRL # Description DID # A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249 A003 Briefing Material DI-MGMT-81605 A004 Report, Record of Meeting/Minutes DI-ADMN-81505 A007 Program Management Plan DI-MGMT-81797 A016 Implementation Plan DI-MGMT-81737 A026 Status Report DI-MGMT-80368 A035 Deficiency Report (DR) DI-PSSS-81535 A037 Request for Variance (RFV) DI-SESS-80640
A059-1 Technical Report - Study/Services (System Security Report) DI-MISC-80508
A059-2 Technical Report - Study/Services (Security Assessment Report)
DI-MISC-80508
A059-3 Technical Report - Study/Services (Authorization Decisions Report (ADR))
DI-MISC-80508
A059-4 Technical Report - Study/Services (System Engineering Analysis Report (SEAR))
DI-MISC-80508
A059-5 Technical Report - Study/Services (Nuclear Certification Evaluation (NCE))
DI-MISC-80508
A060 Test Plan DI-NDTI-80566 A061 Test Procedure DI-NDTI-80603 A062 Test/Inspection Report DI-NDTI-80809 A067 Safety Assessment Report (SAR) DI-SAFT-80102 A071 Accident Incident Report DI-MGMT-82188 A080 Nuclear Certification Impact Statement (NCIS) DI-NUOR-81888 A091 Preservation & Packing Data DI-PACK-80120 A092 Special Packaging Instructions (SPIs) DI-PACK-80121 A107 Training Materials DI-ILSS-80872 A108 Government Property (GP) Inventory Report DI-MGMT-80441 A111 Data Accession List (DAL) DI-MGMT-81453
A135 SYSTEM PROBLEM REPORT (SPR) DI-MGMT-81232
A141 Operational Security (OPSEC) Plan DI-MGMT-80934
11. DD Form 1423s (full 1423’s)
*1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
AFNWC/NMED
6. REQUIRING OFFICE
PWS Paras 2.1.4, 2.3.4, 4.1.7
5. CONTRACT REFERENCE
DI-ADMN-81249B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Meeting Agenda
Conference Agenda
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
General Dynamics Mission Systems, I
F. CONTRACTOR
FD2020-22-50050 TEMP-1702861
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM X OTHER
A
B. EXHIBIT
A. CONTRACT LINE ITEM NO.
XX
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
12. DATE OF FIRST
As Reqd
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
I. APPROVED BY
H. DATE
G. PREPARED BY
Block D: HSEP Hardness Surveillance EMP Program
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Meeting Agenda to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Meeting Agenda via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to the CDRL.
ORG 33 (LODO)
ORG 32 (LODO)
ORG 2 (LODO)
ORG 1 (LODO)
0 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
21-30
LM
Page 1 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Paras 2.1.4, 2.3.4, 4.1.7
DI-MGMT-81605
Briefing Material
A003
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
SEE BLK 16
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Briefing Materials to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Briefing Materials via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 2 (LODO)
Page 2 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
AFNWC/NMET
PWS Para 2.1.4, 2.3.4, 4.1.7
DI-ADMN-81505
Meeting Minutes
Report, Record of Meeting/Minutes
A004
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 15 days after meeting or event has been held. Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Meeting Minutes to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 2 (LODO)
Page 3 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 2.1.1
DI-MGMT-81797
PROGRAM MANAGEMENT PLAN
A007
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Annually
BLOCK 4:
1. Delete paragraph 2.c. in its entirety.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit updated Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Program Management Plan to TopVue, https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Program Management Plan via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 2 (LODO)
Page 4 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
AFNWC/NMES
DI-MGMT-81737
Implementation Plan
A016
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Block 5: PWS Para 2.1.7, 2.2.8, 4.1.5, 4.1.10, 5.3, 8.2
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Implementation Plan NLT 30 days after award of contract. Government will be allowed 15 days, after receipt from contractor, to review for comments. Contractor shall submit revised Implementation Plan incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
Contractor shall submit subsequent Implementation Plan semi-annually after that.
BLOCK 14:
For unclassified deliverables, contractor shall submit Implementation Plan to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Implementation Plan via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG33 (Lt of del
ORG32 (Lt of del
1 ORG10 (Lt of del
ORG2 (Lt of deli
ORG1 (Lt of deli
0 1 0 15. TOTAL
Page 5 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 2.1.3
DI-MGMT-80368A
Status Report
A026
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Monthly
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Initial Submittal:
Contractor shall submit initial Status Report the 10th day of the month following the first complete month of the contract.
Subsequent Submittals:
Contractor shall submit subsequent Status Report the 10th day of each month thereafter for the duration of the contract.
Government will be allowed 15 days, after receipt from contractor, to review for comments. Contractor shall submit revised Status Report incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Status Report to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Status Report via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 2 (LODO)
Page 6 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 4.2.1
DI-PSSS-81535A
DEFICIENCY REPORT (DR)
A035
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Deficiency Report (DR) NLT 24 hours after discovery of CAT I deficiencies and NLT 3 days after discovery of CAT II deficiencies to https://JDRS.mil.
BLOCK 14: For unclassified deliverables, contractor shall submit DR to https://JDRS.mil and a letter of delivery to TopVue https:
//icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1).
For classified deliverables, contractor shall submit DR via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
NOTE: Deficiency Reports shall be submitted IAW Air Force TO 00-35D-54
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 2 (LODO)
Page 7 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW Para
DI-SESS-80640E
REQUEST FOR VARIANCE (RFV)
A037
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Request for Variance (RFV) (DD Form 1964) NLT 10 days after discovery of variance. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised RFV incorporating Government comments, if applicable, NLT 20 days after receipt from Government.
Final approval of Major and Critical variances shall be obtained through the ICBM SPO Technical Engineering Review Board (TERB) Configuration Control Board (CCB).
Final approval of Minor variances can be made by the Sustainment Chief Engineer without approval of the TERB/CCB.
Instructions on completing the DD Form 1694 con be found on the form and in the ICBM Handbook, ICBMSD-HB-63-1105.
BLOCK 14:
For unclassified deliverables, contractor shall submit RFVto TopVue https:
//icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1).
For classified deliverables, contractor shall submit RFV via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 4 (LODO)
ORG 2 (LODO)
Page 8 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Paras 2.4.2, 2.4.5
DI-MISC-80508B
System Security Report
Technical Report - Studies/Services
A059-1
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements).
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Technical Report – Study/Services (System Security Report) NLT 30 days after completion of analysis. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment. Contractor shall submit revised Technical Report – Study/Services (System Security Report) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Technical Report – Study/Services ((System Security Report) to TopVue https:
//icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1).
For classified deliverables, contractor shall submit Technical Report – Study/Services (System Security Report) via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 34 (LODO)
ORG 32 (LODO)
ORG 2 (LODO)
Page 9 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 2.4.2
Security Assessment Report
A059-2
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements.)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Technical Report – Study/Services (Security Assessment Report) NLT 30 days after completion of analysis. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment. Contractor shall submit revised Technical Report – Study/Services (Security Assessment Report) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Technical Report – Study/Services (Security Assessment Report) to TopVue https:
//icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1).
For classified deliverables, contractor shall submit Technical Report – Study/Services (Security Assessment Report) via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 32 (LODO)
ORG 2 (LODO)
Page 10 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 2.4.2
Authorization Decision Report (ADR)
A059-3
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements.)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Technical Report – Study/Services (Authorization Decision Report (ADR)) NLT 30 days after completion of analysis.
Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment. Contractor shall submit revised Technical Report – Study/Services (Authorization Decision Report (ADR)) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Technical Report – Study/Services (Authorization Decision Report (ADR)) to TopVue https:
//icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1).
For classified deliverables, contractor shall submit Technical Report – Study/Services (Authorization Decision Report (ADR)) via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to
ORG 32 (LODO)
ORG 2 (LODO)
Page 11 of 28 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
PWS Para 7.2, 7.4
A059-4
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Block 3: System Engineering Analysis Report (SEAR)
BLOCK 4:
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices, and CUI marking requirements.)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Technical Report – Study/Services (System Engineering Analysis Report (SEAR)) NLT 30 days after completion of analysis. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment. Contractor shall submit revised Technical Report – Study/Services (System Engineering Analysis Report (SEAR)) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14:
For unclassified deliverables, contractor shall submit Technical Report – Study/Services (System Engineering Analysis Report (SEAR)) to TopVue https://icbm.topvue.com/topvue-icbm/ as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .