Justification and Approval (J&A) for Other Than Full and Open Competition
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
NOTE: If a Justification and Approval was approved for the preceding acquisition, a copy of the approved J&A for the predecessor action must be included in the staff package for approval of the instant J&A. This applies to J&A staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor J&A will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Funding level for this acquisition: < $700K > $700K and < $13.5M > $13.5M and < $93M > $93M
Contracting Activity: AFNWC/PZBB
Purchase Request / Local ID Number:
Program / Project (and PE, if applicable): Mk21 Multi Probe Antenna
Program Type (PEO or Other Contracting): PEO
Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
Estimated Contract Cost (including options): $85,951,000 J&A Type: Class Individual
COORDINATION (AFFARS 5306.304(a) ) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
Date
28 Aug 2018
Program Mgr
CHRISTOPHER M PASTOR
AFNWC NIAE DSN: 777-4261
Signature
X
Date
28 Aug 2018
Contracting Officer Blake Davis
AFNWC PZBB DSN: 775-5550
Signature
X
Date
29 Aug 2018
AFNWC/PZBB Branch Chief
TREVOR BRASWELL
AFNWC/PZBB DSN: 777-2694
Signature
X
Date
29 Aug 2018
Legal Reviewer
KEVIN L. CUTLER
75 ABW/JAQ DSN: 586-4193
Signature
X
Date
30 Aug 2018
Chief of Contracting Office (COCO)
KAYLA V. MARSHALL
AFNWC/PZB DSN: 777-4106
Signature
X
Date
05 Sep 2018
ICBM System Program Manager (SPM) LUKE C. G. CROPSEY, Col, USAF
AFNWC/NI DSN: 777-8647
Signature
X
Date
10 Sep 2018
Competition Advocate
JEFFERY L. SORENSEN
AFNWC/PZ DSN: 246-1924
Signature
X
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
Date
18 Sep 2018
Senior Center Contracting Official (SCCO) RANDY L. RIVERA, Col, USAF
AFNWC/PZ DSN: 246-4745
Signature
X
APPROVAL (AFFARS 5306.304(a) )
Date Program Executive Officer/Strategic Systems (PEO/SS) SHAUN Q. MORRIS, Maj Gen, USAF
AFNWC/CC DSN: 246-6567
Signature
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
Note 1: For help completing the following sections, see "Specific Guidance for Completing this Template" below.
Note 2: Each field will expand automatically if additional space is needed.
I. Contracting Activity.
AFNWC/PZBB
6008 Wardleigh Rd, Bldg 1580 Hill AFB, UT 84056 Contracting Officer: Blake Davis
DSN: 775-5550
II. Nature and/or description of the action being processed.
A. Upon approval to use other than full and open competition procedures, the Air Force (AF) will extend the current contract (FA8204-14-C-0011) with Textron Defense Systems (TDS) to procure MK21 Multi Probe Antennas (MPA's) as replenishment spares for the ICBM Force Development Evaluation (FDE) Flight Test Program. This is in support of the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Weapon System. TDS, CAGE Code 04614, is located at 201 Lowell Street, Wilmington, MA 01887.
B. Contract Type and Structure: This is a supply contract with a Firm-Fixed-Price pricing arrangment.
C. Type J&A: Individual.
III. Description of supplies/services required to meet agency needs.
A. Under this extension, TDS will provide up to approx. 140 additional MPA's as replenishment spares in support of the MMIII ICBM Weapon System FDE Flight Test Program. These antennas are used to transmit data from the Joint Test Assembly 4 (JTA4) and JTA4A flight vehicles.
NOMENCLATURE NSN Qty.
Multi Probe Antenna Assembly 1135-01-571-4933 approx 140 ea.
B. This resulting extension will have a total estimated value of $86M over 10 years. This estimate is based on previous production costs plus inflation and an independent cost estimate by government cost estimators. The appropriation funding type is AF Appropriation Code 3020/BP25 Replenishment Spares and Repair Parts.
C. The estimated award date is May 2019 with an estimated final delivery by May 2029. The rationale for obtaining approval to contract for more than one fiscal year is there are no feasible actions that could be initiated to allow for future competition. This was determined through current market research as stated in paragraph VIII. A current 761 screening action is on file for this item.
The Acquisition Method Code is 3C. To ensure continued product integrity of the item, procurement is restricted to the source listed in the supplier information section of this document which is TDS, 201 Lowell Street, Wilmington, MA 01887 .
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
IV. Statutory authority permitting other than full and open competition.
The statutory authority that permits other than full and open competition for this acquisition is 10 U.S.C.2304 (c)(1), as implemented by FAR 6.302-1, Only One Responsible Source.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
A. TDS is the Original Equipment Manufacturer (OEM) for Avco Densified 3-Dimensional Quartz (AD3DQ), the window material for both operational (single probe) and flight test (multi-probe) antennas. The antenna window houses probes and allows Radio Frequency transmission from the Reentry Vehicle during flight test missions. TDS owns the proprietary AD3DQ manufacturing process; therefore, they are the only qualified source to produce the highly specialized Multi Probe Antenna Assembly. TDS re-qualified their MPA production capability in September 2012 under the ICBM Prime Integration Contract (IPIC)/F42610-98C-0001.
B. As long as AD3DQ is available, no alternate material is acceptable. Operational flight testing requires matching operational materials and configuration where feasible. MPAs used on operational flight tests replicate operational antenna performance while adding the capability to transmit telemetry data. Because operational antennas use AD3DQ windows, MPAs used on operational flight tests must also use AD3DQ to ensure comparable performance during reentry including ablation, Radio Frequency transmission, and thermal protection. The use of AD3DQ is essential to the Government's requirements which precludes consideration of an alternate product manufactured by another company.
C. MPA production requires building AD3DQ antenna windows using TDS proprietary processes.
There is no acceptable alternate material. Accordingly, TDS is the only firm capable of providing MPA production.
D. For discussion purposes, if it were possible for another company overcome the proprietary processes owned by TDS, the Government would experience substantial duplication of costs and unacceptable delays. Any other contractor would have to qualify both their process for manufacturing the quartz into billets and once the billets were produced, the billet material itself would require testing and qualification. This is in addition to them somehow finding a way around the proprietary AD3DQ manufacturing process. An independent cost estimate conducted in 2011 (market conditions are still the same today) revealed contracting to another source (assuming they could somehow overcome the barriers listed above) would cost an additional $5.5M ($6.297M in current year dollars).
It was estimated that it would take an additional two years for another company just to develop the technology and qualify the product. The production of flight worthy assets would then take 12-15 months. This would severely impact the flight testing which reduces the confidence in the weapon system reliability to unacceptable levels.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
A. A Sources Sought Synopsis (SSS) was sent out on 2 June 17 and published on FedBizOpps:
FA8214-17-4-MPA1. This SSS was published to determine all interested parties and Industry's MPA capabilities. A description of the market research conducted and results are documented in section
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
VIII below. This is validated by current market research and by the updated 761 screening action that states this item must be acquired direct from the OEM because of the proprietary rights to AD3DQ production.
B. This requirement will be synopsized in the FedBizOpps as a Notice of Proposed Contract Action IAW FAR 5.201. If other sources express interest as a result of this synopsis or other action, they will be listed in the official contract file.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The following steps will be taken to ensure that the anticipated cost of this acquisition will be fair and reasonable. In accordance with the procedures and criteria contained in Federal Acquisition Regulation (FAR) under Part 30 - Cost Accounting Standards, Part 31 - Contract Cost Principles and Procedures, Subparts 15.4 - Contract Pricing; to include technical evaluations and audits, as appropriate. Additional steps to ensure price reasonableness will be under the guidance of the Contract Pricing Reference Guides, jointly developed by the Federal Acquisition Institute and the Air Force Institute of Technology. AF will obtain certified cost and pricing data IAW FAR Subpart 15.403, when required. Final step is prepare Price Negotiation Memorandum (PNM) upon completion of negotiations. PNM contains detailed documentation / justification of price reasonableness.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
A. Lockheed Martin Air Force Strategic Programs (LM) responded to the Sources Sought Synopsis (SSS) on 30 Jun 2017. LM is one of the Original Equipment Manufacturer for the MK21 Reentry Vehicle. LM, CAGE Code 79272, is located at 230 Mall Boulevard, King of Prussia, PA 19406. LM proposed substituting a replacement antenna window material for AD3DQ. Although this material may be similar to the AD3DQ material, it does not meet MPA requirements as described in section V.
B. This SSS also revealed an additional two small businesses interested in our effort: Reagant World Inc. and Reese Industries LLC,. Each submitted a response to the SSS, but through extensive, thorough review by government experts it was determined that they were not capable of performing the process of manufacturing the proprietary MPA or the insulation billets. Engineering analysis of each facility revealed that they do not have the tooling, process, or qualifications to complete the work required.
C. TDS responded to the SSS on 28 Jun 2017. TDS is the original designer and manufacturer of the MK21 MPA and is currently nearing completion of the current contract with the Air Force to deliver these units. A site visit was conducted on 15 Aug 2017 to examine current and future capability to properly handle, manufacture, machine, and deliver MPAs. The visit revealed TDS to have all capabilities to continue production of MPA for the government.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
NA
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY13 Sep 2017
X. List of any sources that expressed, in writing, an interest in the acquisition.
See Section VIII above.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
The ICBM Systems Directorate has plans to purchase these antenna windows throughout the life of the MMIII ICBM Weapon System. Due to the nature of the operational flight test and operational materials requirements, it is not anticipated another source will be able to meet the Government's requirement for any future acquisitions. This contract extension is expected to meet the needs of the MMIII weapon system through the remainder of it's operational life. For this reason, the Program Team does not feel it would be in the best interest of the Government to pursue the purchase of any associated data rights.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Remove the Guidance pages below. Remove the IACR pages below.
Page of International Agreement Competitive Restrictions (IACR) Page of NOTE: If a Justification and Approval was approved for the preceding acquisition, a copy of the approved J&A for the predecessor action must be included in the staff package for approval of the instant J&A. This applies to J&A staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor J&A will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Funding level for this acquisition:
J&A Type:
COORDINATION (AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
Note 1: For help completing the following sections, see "Specific Guidance for Completing this Template" below.
Note 2: Each field will expand automatically if additional space is needed.
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template ( For general guidance, refer to the J&A Preparation Guide. )
I. Contracting Activity.
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed.
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (e.g., firm-fixed-price, cost-plus-incentive-fee, etc.). If exception 2 is cited (unusual or compelling urgency), state date of UCA/contract/modification issuance and amount.
An individual J&A cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate J&A prior to option exercise or the J&A supporting the basic contract must be a Class J&A. For Class J&A situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
(FAR 6.303-2(b)(2)) III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class J&AS, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLINs) e.g., technical data, support equipment, support services, etc., should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the J&A, those ancillary requirements cannot be included in the resulting contract and would require a second J&A. Also, state the type of appropriation (e.g., 3600, 3010, and 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated J&A dollar value.
IV. Statutory authority permitting other than full and open competition.
10 USC 2304(c)(?) (see Note 1 below), as implemented by FAR 6.302-? (see Note 2 below), required by FAR 6.303-2(b)(4).
Note 1: Complete the 10USC 2304(c) citation with the statutory subparagraph cited in the (a) Authority (1) Citations portion of the Competition exception used for your J&A.
Note 2: Complete the FAR citation with the appropriate subparagraph.
Note 3: For class J&As, all contracts within the class should fall within the same statutory authority. Where a different authority must be used for any contract action, a separate J&A should be prepared.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies. (FAR 6.303-2(5))
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (FAR 6.301(c)). To assist you, the following information is provided:
A. Only One Responsible Source (FAR 6.302-1)
When using this authority, thoroughly describe the contractor's unique/highly specialized capabilities and/or qualifications (e.g., facilities, personnel, special tooling acquired), and why no other type of supplies or services will satisfy the agency requirements. This authority shall be used, if appropriate, in preference to the authority in FAR 6.302-7. This authority shall not be used when any of the other authorities apply.
This authority also applies to the use of restrictive brand name descriptions in requirements documentation. An acquisition that uses a brand name description or other purchase description to specify a particular brand name, product, or feature of a product peculiar to one manufacturer does not provide for full and open competition regardless of the number of sources solicited. If a brand name will be used, you must justify it and clearly explain why a specific brand produced by a single company is required, as opposed to allowing full and open competition. The justification should indicate that the use of such descriptions in the acquisition is essential to the Government's requirements, thereby precluding consideration of a product manufactured by another company. (FAR 6.302-1(c)) Brand-name or equal descriptions do not require justifications and approvals to support their use.
In the case of a follow-on contract for continued development or production of a major system or highly specialized equipment/services, the rationale must first justify the supplies/services as being a “major system” or “highly specialized.” The rationale must then justify “either” substantial duplication of cost to the government that is not expected to be recovered through competition, or unacceptable delays in fulfilling the agency's requirements, whichever situation applies. If both of these situations apply, the rationale can be based on either of these two situations, or both. Justifications for follow-on contracts should be organized as below:
Subsection 1
(a) Describe the system or support element to which supply/service to be procured under the contemplated acquisition relates in terms of its purpose and its capabilities. Describe how the contemplated acquisition relates to that system or support element. Describe the previous acquisition history, to include a description of the work the contractor has been performing. Additionally, include the current contract number, basis of award for that contract (competitive/sole source), when the contract was awarded, and when the contract will expire. If the work the contractor will perform under the contemplated acquisition is being done under an ACAT I or II program, state that designation. If the work will not be done under an ACAT I or II program, provide a detailed explanation from a technical perspective as to why the supplies/services to be procured are “highly specialized.” This section must summarize your justification by including the main point(s) of the justification.
(b) If the planned acquisition is a “bridge” effort, which contains options, so state and explain why options are necessary.
(c) Add a concluding sentence to the end of this paragraph, suitably tailored; e.g., “Therefore, this acquisition will be a follow-on contract for the continued production of a major system,” or “Therefore, this acquisition will be a follow-on contract for the continued development of highly specialized equipment,” or “Therefore, this acquisition will be follow-on contract for the continued development of a major system,” or “Therefore, this acquisition will be a follow-on contract for the continued production of highly specialized equipment,” or “Therefore, this acquisition is for continued performance of a highly specialized service.”
Subsection 2
Begin with the following sentence, as applicable: "Award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition” or “Award to any other source would result in unacceptable delays in fulfilling the Air Force's requirements” or “Award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition and unacceptable delays in fulfilling the Air Force's requirements.” Then, discuss either or both of the following situations (although only one of these situations is needed; if the facts exist to support both, then provide that information):
(a) When the rationale is based on substantial duplication of costs, estimate the amount of duplicated costs and offset that by the amount of cost savings that are likely to be generated by competition, if feasible. Include the rationale for the amount of cost that would be duplicated (e.g., training required so that another source could acquire the skills necessary to perform the effort, equipment, facilities) and how the estimates were derived (e.g., development costs incurred by the Government under the existing contract or similar programs). (FAR 6.303-2(b)(9)(ii))
(b) When the rationale is based on unacceptable delay, provide the length of the anticipated delay, state how long it would take another source to obtain this capability (e.g., months, years) and why (if applicable), provide a description of exactly what is being delayed, and provide a detailed explanation of the impact or problem caused by the delay. For example, the impact of not adding additional quantities of launch support services staff-hours to an existing contract might cause a launch to not occur as scheduled, thus delaying the operational use of a spacecraft, thus reducing the constellation's operational availability - and thus reducing (or precluding) the ability of the war fighter to accomplish specific missions.
Subsection 3
Include one of the following sentences, whichever is applicable:
(a) “Accordingly, XYZ Corporation is the only firm capable of providing the supplies and services described in Section III above without the U.S. Air Force experiencing substantial duplication of cost that could not be expected to be recovered through competition.”
(b) “Accordingly, XYZ Corporation is the only firm capable of providing the supplies and services described in Section III above without the U.S. Air Force experiencing unacceptable delays in fulfilling its requirements.”
(c) “Accordingly, XYZ Corporation is the only firm capable of providing the supplies and services described in Section III above without the U.S. Air Force experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements.”
B. Unusual and Compelling Urgency (FAR 6.302-2, 6.303-2(a)(b)(iii), DFARS PGI 206.302-2)
Contracting Officers shall contact SAF/AQC at usaf.pentagon.saf-aq.mbx.saf-aqc-workflow@mail.mil as soon as practicable when contemplating an award under the authority cited in FAR 6.302-2 for J&As requiring SPE approval. Provide an explanation why (1) the supplies or services are needed at once because of fire, flood, explosion, or other disaster, or (2) essential equipment or repairs to that equipment are needed at once, e.g., to preclude impairment of launch capabilities or mission performance of missiles or missile support equipment, eliminate imminent grounding of the XX fleet crucial to what mission of the USAF and Defense of the Nation. In other words, identify the anticipated serious injury to the Government, the nature of the urgency, the reasons for it occurring and why it is “urgent and compelling” to preclude adverse impact to military readiness. Merely citing a Joint Urgent Operational Need (JUON), Force Activity Designator (FAD) rating, Program Management Directive (PMD)/Program Action Directive (PAD) guidance, or DX priority rating is not in and of itself sufficient reason to use this exception from the requirement to obtain full and open competition. Note that only the minimum quantity required to satisfy the unusual and compelling urgency qualifies for this exception; thus, this exception might not suffice to justify option quantities. For example, a JUON covering an entire program may not necessarily warrant a class J&A for all program requirements. The inclusion of future “unknown” requirements in class J&As proceeding on this basis is disfavored. In addition, actions covered by a relevant JUON should, a) cite the JUON, b) describe the nature of the need covered by the JUON, and c) describe the relationship between the JUON and the requirements contemplated under the J&A (e.g., whether the J&A includes requirements not covered by the JUON, whether the J&A covers just a portion of the JUON's scope, etc.). JUONs can provide important support for the J&A; however, the J&A is a stand-alone document and should not rely solely upon the fact that a JUON has been issued as a basis for approval. Activities are under a continuing duty to ensure maximum competition practicable under the circumstances, and JUONs do not automatically provide relief from that duty.
The exception for “unusual and compelling urgency” does not authorize a sole source contract. This exception only authorizes limitation to the greatest number of potential sources that can fulfill the requirement in the time needed. Therefore, the J&A should also describe the method and rationale for identifying the sources to which the solicitation will be limited. If the solicitation is to be limited to only one source, the J&A must be based on an exception that authorizes selection of a single source.
C. Industrial Mobilization; or Engineering, Developmental, or Research Capability (FAR 6.302-3)
The most important part of justifications citing this authority is demonstrating the need to maintain the capability possessed by the identified source(s). Some form of market survey may be critical in demonstrating the uniqueness of this capability.
D. Authorized or Required by Statute (FAR 6.302-5)
It is imperative to identify what is being acquired and the applicable statute authorizing other than full and open competition. Note: Some statutes do not require a written J&A.
E. National Security (FAR 6.302-6)
Provide the minimum essential information needed to establish validity of the justification. This information will make the J&A a classified document. Special handling procedures are required for processing such documentation to the approval authority. Only parties with a “need to know” and the proper level of security clearance should be permitted access to the documentation. Such acquisitions are also exempt from synopsis under FAR 5.202(a)(1).
This statutory authority requires that agencies shall request offers from as many potential sources as is practicable under the circumstances. This exception may be utilized to authorize limited competition in certain narrow circumstances; however, contracting officers may not authorize sole-source contracts solely through use of the national security exception unless disclosure of the agency's need to more than one source would compromise national security.
F. Public Interest (FAR 6.302-7)
(NOTE: Requires D&F in lieu of J&A.) This authority may only be used when none of the other authorities is appropriate and may not be made on a class basis. Provide detail addressing the reasons full and open competition is not in the public interest and why no other authority is appropriate for use.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (utilized as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. This is particularly important when citing the authority of 10 USC 2304(c)(1), “Only one (or a limited number of) responsible source(s)”, since it is this survey of the market place that confirms our assumptions regarding the capability of industry to meet our needs.
Specify whether this acquisition will require a Notice of proposed Contract Action (NOCA) IAW FAR 5.201. Include whether a NOCA was or will be publicized, and specify the dates or expected dates of publication of the NOCA. If the NOCA was not or will not be issued, cite the specific authority for not doing so (FAR 5.202) and the rationale for the NOCA exception. Note that, although a NOCA initiated pursuant to FAR 6.302-2 may not be required, use of this authority is not an automatic exemption from the NOCA requirement (FAR 5.202(a)(2)). If a NOCA is issued, the J&A cannot be signed until the required publicizing time IAW FAR 5.203 has been satisfied and the NOCA results have been included in the J&A package."
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable.
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits. (FAR 6.303-2(b)(7)) VIII. Description of the market research conducted and the results, or explain why market research was not conducted.
Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
Generally, some form of market research should be conducted. But it is most critical when citing the authority of FAR 6.302-1. Under such circumstances, use the following sentence: “As described in Section VI above, market research, in accordance with FAR Part 10, was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition and soliciting inquiries from interested parties.”
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available. (FAR 6.302-1(b)(2) and 6.303-2(b)(9)(i)).
X. List of sources, if any, that expressed interest in the acquisition.
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date (FAR 6.303-2(b)(11)), or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this J&A, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a J&A citing the authority at FAR 6.302-1, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 6.304). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer.
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief. (FAR 6.303-2(b)(12)) XIII. Certification by the technical/requirements personnel
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete. (FAR 6.303-2(c)) Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
The following page contains a suggested template for “International Agreement Competitive Restrictions (IACR)”. The authority to prepare an IACR has been delegated from the HCA to the Contracting Officer.
(AFFARS 5306.302-4)
COORDINATION (AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
IV. Statutory Authority: 10 USC 2304(c)(4) as implemented by FAR 6.302-4, International Agreement.
VI. Certification of Accuracy and Completeness:
As evidenced by his/her signature, the contracting officer has determined the IACR to be both accurate and complete to the best of his/her knowledge and belief. The CO also approves the IACR.
As evidenced by his/her signature, the program/technical/requirements manager(s) have/has determined that any supporting data contained in the IACR, which is his/her responsibility, is both accurate and complete.
9.0.0.2.20120627.2.874785
| Security_Markings: FOR OFFICIAL USE ONLY |
| CurrentPage: |
| PageCount: |
| Revision_Date: 13 Sep 2017 |
| new: |
| amended-with-original: |
| range_under-700K: |
| range_700K-13.5M: |
| range_13.5M-93M: |
| range_over-93M: |
| Contracting-Activity: AFNWC/PZBB |
| PR-ID-Number: |
| Program-Project: Mk21 Multi Probe Antenna |
| Program-Project: 85,951,000 |
| Program-Type: PEO |
| Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements |
| class: |
| individual: |
| Sign_and_Save_1: |
| Date: 28 Aug 2018 |
| Date: 28 Aug 2018 |
| Date: 29 Aug 2018 |
| Date: 29 Aug 2018 |
| Date: 30 Aug 2018 |
| Date: 05 Sep 2018 |
| Date: 10 Sep 2018 |
| Date: 18 Sep 2018 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-SCO-Coord: |
| Hide-PEO-Coord: |
| Hide-AQC-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 1 |
| Remove-IACR-Pages: 1 |
| Remove-Pages-Above: 0 |
| Sign_and_Save_2: |
| IACR-Hide-PM-Coord: |
| IACR-Hide-CO-Coord: |
| IACR-Hide-CSO-Coord: |
| IACR-Hide-Legal-Coord: |
| IACR-Hide-COCO-Coord: |
| IACR-Hide-CA-Coord: |
| IACR-Hide-SCO-Coord: |
| IACR-Hide-PEO-Coord: |
| IACR-Hide-AQC-Coord: |
| IACR-Hide-AQ-Coord: |
| IACR-Hide-Blank-1-Coord: |
| IACR-Hide-Blank-2-Coord: |
| IACR-Hide-COCO-Approval: |
| IACR-Hide-CO-Approval: |
| IACR-Hide-CA-Approval: |
| IACR-Hide-PEO-Approval: |
| IACR-Hide-SPE-Approval: |
| IACR-Hide-Blank-1-Approval: |
| IACR-Hide-Blank-2-Approval: |
| Section-I: |
| Section-II: |
| Section-III: |
| Section-V: |