Statement of Work - Crane Operated Rental_RFI.pdf
PDF 142 KB Posted
- Attached to
- Crane Operated Rental
- Solicitation number
- FA820125RCORental
About this file
This Statement of Work (SOW) details a crane operated rental for the 309th Software Engineering Group (SWEG) at Patrick Space Force Base in Florida. The government requires a 35-ton rough terrain crane with an operator to support the radar 19.14 pedestal upgrade project for the Radar Open System Architecture (ROSA-3) at the Eastern Range. The contract specifies a two-week initial performance period from 2 June 2025 to 13 June 2025, with an option to extend for two additional weeks (16 June 2025 - 27 June 2025). The crane and operator will be on-site Monday through Friday from 0800-1630 hours, delivering and picking up the equipment at 1300 E Hall Rd in Merritt Island, FL, to assist with replacing pedestal elevation arms and slip ring as part of the Legacy MIPR Pedestal upgrade and ROSA-3 Control Group integration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
309TH SOFTWARE ENGINEERING GROUP (SWEG)
RADAR OPEN SYSTEM ARCHITECTURE (ROSA-3)
INTEGRATION (19.134) AND FEED ASSEMBLY
CRANE OPERATED RENTAL
Patrick Space Force Base (PSFB), Florida
22 April 2025
1.0 INTRODUCTION
1.1 Purpose
The Government requires a crane operated rental to complete the antenna pedestal upgrade for the Radar Open System Architecture (ROSA-3) radar at the Eastern Range
(ER).
1.2 Scope
The Contractor shall provide a 35-ton rough terrain crane operated rental for two (2) weeks, with the option for the Government to extend two (2) additional weeks.
1.3 Background
The 520 SWES is responsible for the radar 19.14 pedestal upgrade project (upgrading to the Legacy MIPR Pedestal and completing the Integration of the ROSA-3 Control Group) on the Eastern Range. The 520 SWES requires a crane to complete the replacement of the pedestal elevation arms and slip ring.
2.0 DESCRIPTION OF SERVICES
The Contractor shall provide an operator and a 35-ton rough terrain crane operated rental for two (2) weeks, with the option for the Government to extend two (2) additional weeks.
2.1 The Contractor shall deliver/pick up the crane at radar 19.14 in Merrit Island, FL.
2.2 The operator shall be on-site Monday -Friday during the Period of Performance
(PoP) to operate the crane.
3.0 PERIOD OF PERFORMANCE
3.1 2 June 2025 - 13 June 2025
3.2 Option to extend (in one-week intervals): 16 June 2025 -27 June 2025
4.0 HOURS OF OPERATION
4.1 Monday – Friday: 0800 - 1630
5.0 DELIVERY ADDRESS
1300 E Hall Rd
Merritt Island, FL 32953
File details come from the government source that posted it. Updated .