UTTR GRAVEL CRUSH AND HAUL SITE VISIT HELD 17 September 2020 at 12:00 pm MST
CONTRACTOR QUESTIONS/GOVERNMENT RESPONSES:
1. Q: What are the distances to each gravel pit in relation to the nearest gate/ point of entry.
A: PowerPoint attached
2. Q: Can equipment be staged on range?
A: Yes, in predetermined staging areas, generally at each pit. The government will consider alternate staging areas, after reviewing potential test/ mission impacts and range operations requirements.
3. Q: Can a vehicle refueling point be set up (Fuel Trailer) on range at the gravel pit being utilized.
A: Yes, providing the appropriate precautions are taken to prevent fuel spills, etc.
4. Q: Can the offeror propose an alternate method of billing gravel crushed/ hauled other than what is requested in the SOW?
A: Please complete the documents in the solicitation AS IS but feel empowered to also submit a separate document with your proposed alternate method of billing.