SOW Snow Removal.doc
DOC document 27 KB Posted
- Attached to
- Snow Removal IDIQ Federal contract opportunity
- Solicitation number
- FA8201-09-R-0005
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Service Wage Decision.doc | DOC document | |
| Snow Removal Attn Bidders.doc | DOC document | |
| FA8201-09-R-0005.doc | DOC document | |
| Snow Removal Pricing.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SERVICE CONTRACT FOR SNOW REMOVAL
9-19-08
1. The contractor shall:
a. Provide manpower and all equipment (temporary lighting, generators, snow-blowers, loaders, trucks and etc.) needed for expedient snow removal.
b. Shall be on-call, or report on an as-needed basis.
c. Shall arrive on the work site within one hour of notification by the Civil Engineering Customer Service personnel.
d. Remove snow from the areas designated by the Contracting Officer’s representative at Hill Air Force Base Utah. Snow is not to be plowed against docking areas, dumpsters, fire hydrants, fences or as to block driveways or sidewalks. During a heavy snowfall it may be required for snow to be loaded on trucks and deposited at a site on Base as designated by the Contracting Officer’s representative at Civil Engineering.
e. Be paid based on man-hours worked at the current wage determination, Occupation Code 11030 – General Services and Support Occupations, 11210 – Laborer, Grounds Maintenance.
f. Contractor will adhere to all posted speed limits and traffic signals on Hill Air Force Base Utah. Any and all damaged caused by fault of the contractor to vehicles, road signs, sidewalks, guardrails, fences, facilities or any real property will be the responsibility of the contractor. In the event that damage does occur the contractor will be responsible for repairs or replacement of equal quality/quantity to replace the damaged item(s).
g. The contractor shall adhere to all OSHA regulations.