The document is a Material Approval Submittal form (AF IMT 3000) used for contractors to submit shop drawings, equipment data, manufacturer's literature, certificates, and material samples to the government for approval in a federal contract. The form is part of a solicitation for Tinker Air Force Base (FA813725R0035) specifically targeting MAC BOA Holders to repair the fire suppression system in Building 2280 at Tinker Air Force Base in Oklahoma.

Key instructions for contractors include: consecutively numbering submissions, clearly identifying and tabbing materials for review, preparing four copies of the form, and understanding that the material approval is not valid without the contracting officer's signature. The solicitation is restricted to Tinker AFB - MAC BOA Holders, with an initial site visit required on Thursday, June 12th at 10:30 AM CST, and contractors must submit an RSVP and Entry Access List within 5 calendar days of the project posting to be considered eligible to propose.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
190068_Attch01_DRWG.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
190068_DD100_Appendix A.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
EMS General Awareness Training for Contractors Aug 2018 PDF.pdf PDF
00 70 00.pdf PDF
tinkerafb_INRMP.pdf PDF
dafman91-203.pdf PDF
ufc_3_260_04_2018.pdf PDF
afi91-202_afmcsup.pdf PDF
ufc_3_601_02_2021.pdf PDF
dafi91-202.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
017800_Attch1_DD1354.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 45 00.00 10.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
tinkerafb_HWMP.pdf PDF
Recovered Materials Determination Form.pdf PDF
007200_Attch7a_AF3952.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
01 33 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
00 80 00.pdf PDF
WWYK190068 Canceled SiteVisit Signin 12JUN25.pdf PDF
190068_ATT10_Submittal_Register.pdf PDF
190068_ATT9_SOW.pdf PDF
EAL List - 190068.xlsx XLSX spreadsheet
190068_ATT11_Revised_Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-062 Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

TO: (Contracting Officer’s Representative) FROM: (Contractor) DATE (YYYYMMDD)

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

New RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

DATE (YYYYMMDD) [Contractor] TYPE OR PRINT NAME AND GRADE Signature

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Project Manager)

For Evaluation and Action

DATE (YYYYMMDD) [Base Civil Engineering CM/Inspector] TYPE OR PRINT NAME Signature

TO: (AF Contracting Officer’s Representative)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE (YYYYMMDD) [Base Civil Engineering Project Mgr] TYPE OR PRINT NAME Signature

APPROVED DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

TO: (Contractor)

DATE (YYYYMMDD) [Contracting Officer’s Representative] TYPE OR PRINT NAME Signature

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

FROM Contractor:
DATE YYYYMMDD:
CONTRACT NUMBER:
PROJECT NUMBER:
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN:
TO Contractor:
Group1: Choice1
ITEM 1:
ITEM 2:
ITEM 3:
ITEM 4:
ITEM 5:
ITEM 6:
APPROVED 1:
SEE REVERSE 1:
INITIAL 1:
Spec Sect/Par #/Dwg 2:
Spec Sect/Par #/Dwg 1:
Spec Sect/Par #/Dwg 3:
Spec Sect/Par #/Dwg 4:
Spec Sect/Par #/Dwg 5:
Spec Sect/Par #/Dwg 6:
APPROVED 2:
APPROVED 3:
APPROVED 4:
APPROVED 5:
DISAPPROVED 1:
DISAPPROVED 2:
DISAPPROVED 3:
DISAPPROVED 4:
DISAPPROVED 5:
DISAPPROVED 6:
SEE REVERSE 2:
SEE REVERSE 3:
SEE REVERSE 4:
SEE REVERSE 5:
SEE REVERSE 6:
APPROVED 6:
INITIAL 2:
INITIAL 3:
INITIAL 4:
INITIAL 5:
INITIAL 6:
DESCRIPTION OF MATERIAL 1:
DESCRIPTION OF MATERIAL 2:
DESCRIPTION OF MATERIAL 3:
DESCRIPTION OF MATERIAL 4:
DESCRIPTION OF MATERIAL 5:
DESCRIPTION OF MATERIAL 6:
KTR DATE:
INSP DATE:
PM DATE:
COR DATE:
Group3: Choice2
TO COR:
KTR Name:
INSP Name:
PM Name:
COR Name:
To PM:
Back Pg Remarks:
To COR:
SN #:
Previous SN #:
Group2: Choice3