The document is a Tinker Air Force Base Outage Request Form and accompanying guidelines for classifying and submitting utility service interruptions. The form provides a structured template for reporting various types of outages including fire suppression, gas, electric, HVAC, water, and parking/road services, with designated sections for project information, operational support requirements, and contact details.

The guidelines specify three categories of outages: Planned (Routine), Limited Notice (Urgent), and Emergency, each with specific advance notice requirements. Planned outages require 60 calendar days notice for roads/parking/sidewalks, 21 days for utilities, and 10 days for fire alarm testing. Urgent outages have shorter timelines of 21, 10, and 7 calendar days respectively. Emergency outages are immediate responses to safeguard property or occupant health, such as mechanical failures, flooding, water line breaks, or electrical issues. For emergency requests outside normal working hours (0700-1600 M-F), personnel are instructed to call the Customer Service Desk at 734-3117.

View the file

Other files

File Type Posted
Solicitation Amendment FA813725R00350009 SF 30.pdf PDF
Solicitation Amendment FA813725R00350007 SF 30.pdf PDF
Solicitation Amendment FA813725R00350006 SF 30.pdf PDF
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf PDF
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf PDF
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf PDF
WWYK190068_RFI_23-24-25 SEP24.pdf PDF
RFI 26 WWYK190068_Rev_1_26 51 00.pdf PDF
RFI 26 Fixture with Joist.pdf PDF
Solicitation Amendment FA813725R00350005 SF 30.pdf PDF
190068_Attch01_DRWG.pdf PDF
190068_Attch04_Revised_Design_Analysis.pdf PDF
Solicitation Amendment FA813725R00350003 SF 30.pdf PDF
FP from DACA63-76-C-0111.pdf PDF
190068_IFC_Design Analysis_Final.pdf PDF
190068_DD100_Appendix A.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 45 00.00 10.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_600_01_2016_c6.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
tinkerafb_HWMP.pdf PDF
Recovered Materials Determination Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
007200_Attch7a_AF3952.pdf PDF
EMS General Awareness Training for Contractors Aug 2018 PDF.pdf PDF
00 70 00.pdf PDF
tinkerafb_INRMP.pdf PDF
dafman91-203.pdf PDF
ufc_3_260_04_2018.pdf PDF
afi91-202_afmcsup.pdf PDF
ufc_3_601_02_2021.pdf PDF
dafi91-202.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
017800_Attch1_DD1354.pdf PDF
Solicitation - FA813725R0035 for WWYK190068.pdf PDF
01 33 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
WWYK190068 Canceled SiteVisit Signin 12JUN25.pdf PDF
EAL List - 190068.xlsx XLSX spreadsheet
190068_ATT10_Submittal_Register.pdf PDF
190068_ATT9_SOW.pdf PDF
190068_ATT11_Revised_Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All outages and service interruptions will be classified in one of three possible categories:

a. Planned (Routine) – An interruption in parking or utility services, which can be foreseen well in advance and/or is part of an existing schedule. Planned outages include all repair projects, with enough lead time to allow them to be accomplished on a non-emergency basis, and all capital and renovation projects which require outages during construction. Planned outages should be submitted to the Outage Coordinator prior to the requested outage using the following timelines:

• Roads/Parking Lots/Sidewalks – 60 calendar days

• Utilities (all) – 21 calendar days

• Fire Alarm Testing – 10 calendar days

b. Limited Notice (Urgent) – An interruption in parking or utility services that cannot reasonably be foreseen in advance to be considered a “routine” outage or which does not allow for extensive pre-planning or coordination prior to the interruption. A Limited Notice Outage may be required when repairs must be accomplished within a short time frame (which may not allow time for BCE to notify or meet with stakeholders) to safeguard property and occupant health.

Limited Notice or Urgent outages should be submitted to the Outage Coordinator prior to the requested outage using the following timelines:

• Roads/Parking Lots/Sidewalks – 21 calendar days

• Utilities (all) – 10 calendar days

• Fire Alarm Testing – 7 calendar days

c. Emergency Outage – An interruption in parking or utility services that must be accomplished immediately to safeguard property or occupant health. This may occur as the result of a natural or human-caused hazard. Examples of emergency outages may include, but are not limited to:

mechanical failure, flooding within buildings, water line breaks, electrical outages or “power blips”, or hazardous materials incidents. Outages requests are considered an Emergency Request if they are submitted to the Outage Coordinator in a time frame that is less than the Urgent timelines noted above. Emergency requests must still be supported with an outage request form explaining the situation and reason that the outage cannot be accomplished as a Routine or Urgent Outage. Emergency Requests outside of normal working hours (0700-1600 M-F) should call the Customer Service Desk at 734-3117 for immediate assistance.

Form - Outage Request
Vance Gate Outage Request Form.pdf
Other or Remarks:
Gates specify which:
Primary_2:
Type1: Off
Type2: Off
Type3: Off
Reason:
Work Order #:
Project #:
Description of Work to be Performed:
Other Operational Support Required:
Impact of Outage:
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Road_2: Vance Gate
Project Name:
Exact Location Bldg Post intersection etc:
Outage Start Date:
Outage End Date:
Outage StartTime:
Outage End Ti me:
Primary:
Position:
Phone:
Email:
Alternate:
Position_2:
Phone_2:
Email_2:
TAFB Contract Point of Contact lnspectorPMCOR: Darren Hulsey
Position_3:
Phone_3:
Email_3:
Alternate_2:
Position_4:
Phone_4:
Email_4:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Text19:
Text20:
Text21:
Text22: Preventive Maintenance on mechanical and electronic controls
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Yes
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Text32:
Text33: This gate is only open mornings and evenings. Mid day work will not impact traffic