Sources_Sought_Synopsis_Ceramic_Bead_Shot_Peen.pdf

PDF 201 KB Posted

Attached to
REMEDIAL MAINTENANCE OF CERAMIC BEAD PEENING MACHINE
Solicitation number
FA8132-16-Q-0016
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT SYNOPSIS

FOR

REMEDIAL MAINTENANCE OF THE

INNOVATIVE PEENING SYSTEMS (IPS) ROBOTIC ROTARY

INDEXING CERAMIC BEAD PEENING MACHINE

This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for Remedial Maintenance of the Innovative Peening Systems (IPS) robotic rotary indexing ceramic bead peening machine for use by United States Air Force (USAF) personnel. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

INSTRUCTIONS:

1. Below is a document containing a description of the Remedial Maintenance of the Innovative Peening Systems (IPS) robotic rotary indexing ceramic bead peening machine requirement and a Contractor Capability Survey, which allows you to provide your company’s capability.

2. If, after reviewing these documents, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities. If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)

a. Identify any areas of work that your organization believes should be broken out exclusively for Small Business.

3. Both large and small businesses are encouraged to participate in this Market Research.

Joint ventures or teaming arrangements are encouraged.

4. Questions relative to this market survey should be addressed to Trevor Myers, trevor.myers.3@us.af.mil

PURPOSE/DESCRIPTION

The Government is conducting market research to identify potential sources that possess the production data/repair data, expertise, capabilities, and experience to meet qualification requirements for the Remedial Maintenance of the Innovative Peening Systems (IPS) robotic rotary indexing ceramic bead peening machine.

PERFORMANCE WORK STATEMENT

FOR

REMEDIAL MAINTENANCE

OF THE

INNOVATIVE PEENING SYSTEMS (IPS) ROBOTIC ROTARY

INDEXING CERAMIC BEAD PEENING MACHINE

AFMC OC-ALC/OBCA

JUNE 15, 2016

1. DESCRIPTION OF SERVICES

1.1. Scope.

1.1.1. The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform Remedial Maintenance (RM) on-base at the Oklahoma City-Air Logistics Complex (OC-ALC) The equipment is listed in Appendix [A (On-Base)].

1.1.2. The contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein and conform to the manufacture’s equipment specifications and this Performance Work Statement (PWS).

1.2. Remedial Maintenance (RM).

1.2.1. RM is defined as unscheduled work requirements which are not otherwise defined in this PWS. RM includes the evaluation, troubleshooting and diagnosis of equipment to isolate the source of a malfunction.

1.3. Malfunction and Notification Process.

1.3.1. Upon occurrence of an equipment or system malfunction, the Government Point of Contact (GPOC) will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.

the equipment identification number (ID#) a brief description of the malfunction location of equipment name and telephone number of the POC

1.3.2. Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.

1.3.3. Equipment Evaluations.

The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

the equipment ID# date of evaluation description of findings and recommendations required parts and part numbers (P/N) cost of parts number of parts needed estimated labor hours required to complete the repair

Any recommendations cited shall consider:

the priority of the requested service available source for obtaining new parts the availability of the new parts shipping and delivery schedules of parts other factors which may be peculiar to the specific repair requirement

1.4. Authorizations for Repair Actions.

1.4.1. Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.4.2. Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.5. Parts and Materials.

1.5.1. The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

1.6. Service Report.

1.6.1. Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the GPOC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the GPOC. As a minimum, the final service report shall contain the following information:

name of the company requested service date contract number equipment ID# description of services provided additional services recommended (if any) printed name and signature of technician who performed the services printed name and signature of on-site Government SME or GPOC start and completion dates complete breakdown of the labor cost (hours and rate) materials and parts used details of any other charges printed name and signature stating only new parts and materials were used written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.

1.7. Increase or Decrease of Equipment.

1.7.1. The Government reserves the right to increase or decrease the number of the 76th PMXG/QPE Ceramic Bead Shot Peen to be serviced by two (2) each, through means of a modification based on the Government need during the life of the contract.

The Contractor shall provide the agreed upon Ceramic Bead Shot Peen RM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.

1.8. Contractor Performance.

1.8.1. According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The GPOC will participate in the administration of this contract. Any matter concerning a change to scope, prices, terms or conditions of this contract shall be referred to the CO. All services that have been performed by the Contractor during the period of this contract will be subject to review by the Contracting Officer or GPOC.

1.9. Maintenance Documentation.

1.9.1. The Contractor shall notify the Government SME upon completion of each PM/RM/Repair/or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.9.2. Red Tagged Items.

1.9.2.1. Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.9.3. Red X Clearance.

1.9.3.1. The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.9.4. Red X Clearance on Equipment.

1.9.4.1. Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

1.10. Corrective Action Report (CAR)/Complaint Contractor Response Time.

1.10.1. The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive action(s) in relation to the submitted CAR or Customer Complaint.

1.11. Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis.

1.11.1. This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.12. Hours of Operation.

1.12.1. The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 07:00 a.m. to 3:30 p.m. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the CO. Upon approval from the CO, the Government SME or GPOC must be present with the Contractor.

1.12.2. These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.13. Contractor Personnel.

1.13.1. The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.13.1.1. The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel.

The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.13.1.2. Listing of Contractor Employees.

1.13.1.2.1. The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the GPOC within five (5) business days after the contract award date. Within five (5) business days, the Contractor shall also provide an updated listing of personnel to the GPOC when employees affecting the work of this contract change status or position.

1.13.1.3.1. The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty GPOCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor;

however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein.

The Contractor shall employ and maintain a technically trained and experienced work force.

1.14. Environmental Protection & Safety.

1.14.1. The Contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, instructions, and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.14.2. Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

1.14.3. Material Safety Data Sheet/Safety Data Sheet (MSDS/SDS).

1.14.3.1. Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.14.3.2. The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the GPOC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs) and a completed OC-ALC Form 152, SDS Information Sheet. The Contractor shall receive approval from the GPOC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal

Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier;

signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The GPOC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the GPOC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as Government employees.

1.14.4. Hazardous Material (HAZMAT).

1.14.4.1. If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” in writing on company letterhead. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.14.4.2. The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the GPOC monthly, the last business day of each month, or when the required work is completed. The GPOC will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

1.14.5. Hazardous Waste.

1.14.5.1. If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” in writing on company letterhead. This certification shall be provided to the POC within ten (10) days after award. Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.14.5.1.1. The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the GPOC if the required waste containers are not available on site.

1.14.6. Discharges.

1.14.6.1. Any discharges into Tinker’s Industrial Waste Treatment Plant (IWTP) or sanitary sewer will be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).

The GPOC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.14.7. Off-Site Discharges

1.14.7.1. For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide a letter ten (10) calendar days after contract award date to the GPOC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.14.8. Spills.

1.14.8.1. Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record.

The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.14.9. Environmental Training. Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.14.9.1. Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the GPOC for approval within ten (10) calendar days after contract award date. Once written approval is received from the GPOC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the GPOC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFBI 32-7004, “Hazardous Waste Management”.

1.15. Forms and Publications, TO, AFI and AFMCI.

1.15.1. The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via internet at www.e-publishing.af.mil. In the event that a form or publication is not available online, the GPOC will provide the form, instruction or publication to the Contractor upon written request (e-mail is acceptable) by the Contractor. In the event that laws, regulations, Technical Orders (TO’s), AFI’s, Air Force Material Command Instructions (AFMCI’s) change during the term of this contract, the Contractor is required to comply as such changes come into effect.

Contractors delivering or handling official USAF records shall comply with the applicable records management regulations AFI 33-322, Chapter 3 in its entirety.

1.16. Foreign Object Damage (FOD) and Drop Object Prevention (DOP)/House-keeping and Tool Control.

1.16.1. Housekeeping.

1.16.1.1. The Contractor shall keep the work areas clean and neat IAW Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.

1.16.2. Foreign Object Damage (FOD) and Dropped Object Prevention (DOP).

1.16.2.1. Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36- 2232, AFMC Supplement 1, paragraph 9.2., and A4.3.4. (Initial)/A4.3.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the GPOC or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM. The Contractor shall provide a contractor devised certificate to the GPOC for each employee within five (5) business days after the contract award date. The certificates shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide a contractor devised certificate of training to the GPOC prior to the employees starting work in the OC-ALC shops. On an annual basis, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide an updated contractor devised certificate of training to the GPOC within five (5) business days of the new period of performance (PoP) start date.

1.16.3. Tool Control and Accountability.

1.16.3.1. While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21- 101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC- ALC industrial areas. The MXRIWRS Form 032 is available from the GPOC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the GPOC within five (5) business days after Remedial Maintenance actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the GPOC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The GPOC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the GPOC. The CM shall ensure each employee on the job site receives a briefing from the GPOC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

1.17. Privately Owned Motor Vehicles (POV).

1.17.1. Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

1.18. Visitor Pass.

1.18.1. The Contractor shall contact the GPOC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The GPOC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.19. Foreign National(s).

1.19.1. The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a US Government facility.

1.20. Health and Safety on Government Installation.

1.20.1. While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, GPOC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

1.21. Emergency Procedures.

1.21.1. The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.22. Special Qualification.

1.22.1. The Contractor shall provide personnel with the following special qualifications.

The Repair Technicians shall have certifications provided by the OEM to reflect that they are an authorized dealer or repair facility of training from a manufacturer of Ceramic Bead Shot Pin company provided with the Contractor’s proposal and have at least five (5) years provable experience.

1.23. Training - General.

1.23.1. The GPOC will provide training via training via slides or classroom, prior to the Contractor performing work at the OC-ALC. The Government will be responsible for all approved cost associated with the training identified below. The GPOC will document training on and maintain copies of completed AF IMT 1151, Training and Attendance Rating, as part of the contract surveillance file. For purposes of identification and compliance with Personally Identifiable Information (PII) requirements, only the last four (4) of the Contractor employee’s Social Security Number (SSN) will be input on the form.

1.21.2. The Contractor shall contact the GPOC prior to work being performed in order to accomplish the required training or verify the required training as listed below has been accomplished.

Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU

AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB

Initial Fire Safety and Prevention Training CTESAF0000100SU

Refresher Fire Safety and Prevention Training Computer Based Training (CBT)

CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9700138BR

OC-ALC Human Factors Training, CBT MTEMAS9700501BR

Environmental Management Systems (EMS) - General Awareness Training

MTEENV9733070BR

2. Reserved.

Section Three

GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES

3.1. Government Furnished Property (GFP) And Services

3.1. Government Furnished Property.

3.1.1. Government Property Repair/Maintenance On-Base is not considered Government Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government Organizations (76 PMXG/QPE ) for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and/or disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.

3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base. Not Applicable.

3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base. Not Applicable.

3.2. Shared Property of the Government. Not Applicable.

3.3. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB, OK:

3.3.1. Security Forces. The Government will provide general on-base security forces' service.

The security forces’ telephone numbers are 911 for emergencies, 734-2000 for crime in progress, and 734-3737 for non-emergency calls.

3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 734-3981. For routine calls to dispatch call 734-7964.

3.3.3. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the Contractor requires additional utility services, it shall be the Contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.3.4. Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris.

3.3.5. Workspace. The Government will provide access to the equipment and adequate workspace around the equipment.

3.4. Intangible Government Property is not applicable to the performance of this contract.

3.5. Contractor Acquired Property (CAP) or Fabrication is not applicable to the performance of this contract.

End of PWS

Appendix A (Equipment List)

Automatic Rotary Indexing Ceramic Bead Peening System

15‐Jun‐15

OC No./

Equipment

ID

Description Manufacturer Model No.

Serial No.

Part No/NSN

Location

1 OC 18404 Automatic rotary indexing ceramic bead peening system

Innovative Peening Systems

N/A 4003 N/A Bldg 3221 Blast Shop

End of Appendix A

CONTRACTOR CAPABILITY SURVEY

Part I. Business Information Please provide the following business information for your company/institution and for any teaming or joint venture partners:

Company/Institute Name:

Address:

Point of Contact:

CAGE Code:

Phone Number:

E-mail Address:

Web Page URL:

Size of business pursuant to North American Industry Classification System (NAICS)

Code: 811310 Based on the above NAICS Code, state whether your company is:

Small Business (Yes / No) Woman Owned Small Business (Yes / No) Small Disadvantaged Business (Yes / No) 8(a) Certified (Yes / No) HUBZone Certified (Yes / No) Veteran Owned Small Business (Yes / No) Service Disabled Veteran Small Business (Yes / No)

Central Contractor Registration (CCR) (Yes / No) A statement as to whether your company is domestically or foreign owned (if foreign, please indicate the country of ownership).

Submit information to the requiring activities’ address, include phone number, must be received no later than close of business 1 July 2016.

Part II. Capability Survey Questions

A. General Capability Questions:

1. Does your company have the knowledge and experience working with automated shot peen equipment?

2. Do you have the rigging capability necessary to handle large equipment?

3. Would you be willing to bid for this job?

B. Repair Questions:

1. Describe your capabilities and experience in modifying existing systems/equipment (hardware and software) to solve maintenance and support problems in the depot environment.

2. Describe your configuration management processes and how you identify and resolve parts obsolescence and diminishing manufacturing sources problems?

3. Describe your process for maintaining inventory records and reporting on hand/in work balances and repair status to your customer.

4. Do you have the mechanical means to repair/fabricate the necessary broken components?

5. Does your company have any knowledge and experience working with Siemens PLC motion controllers, specifically for shot peen equipment?

C. Commerciality Questions:

1. Are there established catalogs or market prices for our requirement? If you offer this product and/or service to both U.S. Government and commercial sources, is the same workforce used for both the U.S. Government and general public? Is our requirement offered to both under similar terms and conditions? Briefly describe any differences.

2. Describe your standard warranty and return process for services furnished to the government for items similar in nature to this requirement.

D. Services Questions

1. Describe your services capabilities and experience with regard to the requirements of this effort.

2. Describe your capabilities and experience in developing/modifying procedures. Include associated upgrade of technical orders and preparation of new technical orders.

3. Demonstrate your ability and experience for the same or similar services, which are currently provided in the commercial and/or military environment by providing the following information on the same or similar items:

a) Contract Number

b) Procuring Agency

c) Contract Value

d) Services Provided

4. Describe your capabilities and experience in any required test, evaluation, and repair processes/procedures with regard to the required items.

5. Describe how you/your organization will identify and resolve parts obsolescence and diminishing manufacturing sources problems?

6. Discuss your process for addressing any fit, form, and or function issues that may arise out of the requirements of this effort.

7. Describe your process for maintaining inventory records and reporting on hand/work-in-process balance and manufacturing status to your customer as required.

8. How will your organization address the absence of drawings, specifications, technical data, test procedures, etc.

9. If your company can not perform the entirety of the requirement what part could or would your company be able to perform. Provide specific info on what could be broken out for your company’s performance.

SOURCES SOUGHT SYNOPSIS Ceramic Bead Shot Peen pg1
Sources Sought Synopsis Ceramic Bead Shot Peen

File details come from the government source that posted it. Updated .