Attachment_1_INE_PWS.pdf
PDF 448 KB Posted
- Attached to
- Inertial Navigation Element Federal contract opportunity
- Solicitation number
- FA812817R0003
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| INE_J&A_Approved_-_FINAL_Redacted.pdf | ||
| FA812817R0003.pdf | ||
| Exhibit_A_A012_Attachment_A_CFO_Report_Format.pdf | ||
| FA812817R0003.pdf | ||
| Exhibit_A_A008_Conference_Agenda.pdf | ||
| Exhibit_A_A010_Scientific_Technical_Reports_Summary.pdf | ||
| Exhibit_A_A005_Contractors_Progress_Status.pdf | ||
| Exhibit_A_A002_Risk_Management_Status_Report.pdf | ||
| Exhibit_A_A009_Conference_Meetings.pdf | ||
| Exhibit_A_A003_Quality_System_Plan.pdf | ||
| Attachment_1_Appendix_B_INE_GFP.pdf | ||
| Exhibit_A_A006_Briefing_Material.pdf | ||
| Exhibit_A_A012_CFO_Quarterly_Report.pdf | ||
| Exhibit_A_A001_Risk_Management_Plan.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
for
Engineering and Analysis Support for Sustainability of the Air Launched Cruise Missile
(ALCM) Inertial Navigation Element (INE) P/N 750600
ENGINEERING SERVICES
DATE: 2 0 September 2017
PR #: FD2030-17-31219
PREPARING ORGANIZATION: AFNWC/NDME
TINKER AFB, OK 73145-8901
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD Contractors only; Administrative Use, 24 May 2017. Other requests shall be referred to AFNWC/NDM 7330 Sentry Blvd, Tinker AFB, OK 73145-8901
Signature Page
Approved:
EUGENE SORRELL, NH-03, DAF
Chief, Program Management Section Missile Sustainment Division
AFNWC/NDMPM
DSN: 339-8819, COM: (405) 739-8819
ROBERT A. DANG, NH-04, DAF
Chief, Engineering and Technical Branch Missiles Sustainment Division
AFNWC/NDME
DSN: 336-5853, COM: (405) 736-5853
Table of Contents
1.0 SECTION I - DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1 Scope
1.2 Program Requirements
1.3 Release of Public Information
1.4 Status Reports (MSR)
1.5 Engineering Integrated Product Team (IPT) Meetings
1.6 Post-Award Meetings
1.7 Deliverables
2.0 SECTION II –ENGINEERING SERVICES
2.1 Government Furnished Property (GFP)
2.2 Contract Data Requirements List Markings and Submissions
3.0 SECTION III – NON-RECURRING ENGINEERING TASKS
3.1 INE Analysis and Implementation Plan
4.0 SECTION IV – SERVICE SUMMARY (SS)
4.1 Performance Requirement Threshold
4.2 Contractor Performance Evaluation
5.0 SECTION V – CONTRACT DATA REQUIREMENT LIST
6.0 SECTION VI – ACRONYMS
1.0 SECTION I - DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1 Scope
This Performance Work Statement (PWS) defines the requirements for the AGM-86B, Air Launched Cruise Missile (ALCM) Inertial Navigation Element (INE) (P/N 750600)
Engineering Services Contract. This PWS defines the extent and types of engineering services that the Contractor will provide in support of the INE. The weapon systems utilizing the INE are managed by the Air Force Nuclear Weapons Center Missile
Sustainment Division (AFNWC/NDM), hereafter referred to as the Program Office.
The scope of this contract is limited to analyzing INE components and providing assistance to the Program Office in developing a comprehensive plan addressing INE reliability and sustainment issues in the areas of Performance (reliability, availability, maintainability and hardness); Supportability (obsolescence and diminishing manufacturing sources and material shortages); and Repairability (tooling, materials, capability, test/support equipment, environmental, cybersecurity). In addition, the
Contractor, in collaboration with the Program Office, will also analyze the potential use of
Tomahawk RMUCs and Conventional Air Launched Cruise Missile INEs.
The Contractor shall leverage its previously developed proprietary data and acquired rights pertaining to the AGM-86B ALCM INE to perform engineering services which may include: remanufacturing, engineering modeling, qualification testing, technology insertion at Circuit Cart Assembly (CCA) level, and validity of reutilizing Navy Tomahawk
Missile Reference Measuring Unit and Computer (RMUC) circuit cards and components for use in the sustainment of the INE.
The aforementioned tasks are in support of the Program Office’s responsibility to ensure
AGM-86B ALCM INE’s reliability and sustainment. Parties understand and agree that all deliverables provided in performance of this contract (i) shall not be deployed or tested in the field; (ii) shall be limited to use in laboratory testing in accordance with the agreed upon PWS; and (iii) shall not be used in live munition testing.
Any efforts shall not impact the Operational Flight Software (OFS). Also, the contractor shall maintain form, fit and function to the current configuration (Class II Changes Only).
Any required Class I changes shall be considered changes to scope and subject to an equitable adjustment, IAW DFARS 243.205-71, in cost, fee and schedule.
1.2 Program Requirements
1.2.1 Risk Management
The Contractor shall establish and maintain a Risk Management Plan for early identification of program risk and mitigation of risk. The Contractor shall submit a Risk
Management Plan and provide a Risk Report at monthly engineering IPT teleconferences. The Contractor shall brief risk management status for all Moderate and High Risks during Contract Program Management Review (PMR) meetings. (CDRL
A001 - Risk Management Plan, CDRL A002 - Risk Management Status Report)
1.2.2 Quality System Management
The Contractor shall maintain a quality system, that includes all material purchased, which adheres to the requirements of SAE- AS9100, Quality Management Systems –
Requirements for Aviation, Space and Defense Organizations. The Contractor shall maintain a Quality System Plan (QSP). (CDRL A003 – Quality System Plan submitted
IAW SAE-AS9100).
The Contractor shall ensure that the quality system procedures, planning, and other documentation and data that comprise the quality system are available for review upon request from Government. The Contractor shall support Government quality audits for inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of implementing procedures.
The Contractor shall allow Government quality audits to be performed on Contractor maintained files. The Government will provide the Contractor with prior notification of the impending quality audit by at least 14 calendar days. Upon completion of a
Government quality audit, the Contractor shall incorporate into the process corrective action(s) to eliminate the cause of the defects. The Contractor shall ensure all material purchased or subcontracted from other contractors meets all requirements of this contract.
1.2.3 Program Protection Plan
The ALCM/CALCM Program Protection Plan (PPP) and the Counterintelligence Support
Plan (CISP) will be provided as Government Furnished Information (GFI) per the contract DD Form 254. The Contractor shall be entitled to an equitable adjustment, IAW
DFARS 243.205-71, if the imposed requirements impact the Contractor’s estimated cost, fee and/or schedule. The Contractor shall provide OPSEC protection for all
Sensitive/Critical Information (CI) in accordance with Air Force Instruction (AFI) 10-701, Chapter 8, PPP and CISP for protection of Critical Program Information (CPI) and CI identified. The Contractor shall, as requested by the government, provide input to updates of the PPP and CISP. Requests for clarification of the PPP and/or CISP shall be made by the
Contractor to the PCO no later than thirty (30) business days from receipt of the PPP and CISP or updates thereof.
1.3 Release of Public Information
Release of information pertaining to this contract shall be reviewed and approved for release in accordance with DOD 5220.22-M, the National Industrial Security Operating
Manual (NISPOM), Section 5, Para, 5-511, Disclosure to the Public and the Contract
Security Classification Specification, DD Form 254, section 12.
1.4 Status Reports (MSR)
The Contractor shall submit monthly status/progress reports which summarize all accomplishments and efforts (technical, financial, projections, problems, etc.) during the reporting month. (CDRL A005 - Contractor's Progress, Status and Management Report)
1.4.1 The Contractor shall conduct quarterly Technical Interchange Meetings (TIMs) at
Contractor facility to present results of assessment and status update. Video
Teleconferencing (VTC) or telecoms shall be used in lieu face-to-face meetings as directed by the PCO. The Contractor shall generate and provide presentation materials as required to aid in the discussion of the TIMs. The Contractor shall provide agenda, meeting minutes, and track Action Items associated with the meeting. (CDRL A008 -
Conference Agenda; CDRL A009 - Conference Minutes; CDRL A006 - Briefing Material)
1.4.2 The Contractor shall conduct monthly telecon meetings to provide status update.
(CDRL A008 - Conference Agenda; CDRL A009 - Conference Minutes)
1.4.3 The Contractor shall provide monthly activity reports. (CDRL A005 - Contractor’s
Progress, Status and Management Report)
1.5 Engineering Integrated Product Team (IPT) Meetings
1.5.1 The Contractor shall participate in Engineering IPT meetings by telecom, video teleconference (VTC) or face-to-face as directed by the Procuring Contracting Officer
(PCO)/Contracting Officer’s Representative (COR) to discuss status/progress of all accomplishments and efforts. The Contractor shall provide the presentation materials two business days prior to the meeting. (CDRL A006 – Briefing Material)
1.5.2 The Contractor shall provide initial response to all assigned action items within
10 business days. (CDRL A009 – Conference Minutes)
1.6 Post-Award Meetings
The Contractor shall participate in post-award meeting at Tinker AFB to discuss contractual/technical requirements of the awarded task orders as directed by the PCO.
1.7 Deliverables
The Contractor shall ensure all deliverables are submitted IAW the Delivery Schedule specified by individual task orders, and the format, content, and distribution of such deliverables is in compliance with the Contract Data Requirement List (CDRL).
2.0 SECTION II –ENGINEERING SERVICES
Tasks in Section II will be performed on a non-recurring basis throughout the applicable
PoP.
2.1 Government Furnished Property (GFP)
With the exception of the Government property identified in Appendix B, the Contractor shall be responsible for furnishing all labor, materials and facilities necessary for performing the contract. Appendix B provides detailed instruction pertaining to the management and control of Government owned property.
2.1.1 Financial Improvement Audit Readiness (FIAR)
This contingency support may be required during this contract and will encompass tasks to transition and maintain compliance with DoD Financial Improvement and Audit
Readiness (FIAR) requirements associated with all reportable GFP. Effort will include inventory verification, validation, reconciliation and audit assistance, cataloging of parts, material, Support Equipment (SE), tools and test equipment, National Stock
Number (NSN) cross reference research, database entry, Air Force Equipment
Management System (AFEMS) or successor system data entry/management, and production of all FIAR mandated reports. (CDRL A011 – Recurring Inventory Report)
2.1.2 GFP Reporting
The Contractor shall provide a quarterly report IAW CDRL A012 – GFP Report.
2.1.3 Nuclear Certified Equipment Annual Inventory/Verification
Contractor shall support a Government annual inventory/verification of Government
Nuclear Certified Equipment (NCE) to include verifying legibility of identification information (i.e. data plate, information plate, appropriate markings, etc.) and condition.
The Government will notify the Contractor at least 30 calendar days prior to each visit.
2.2 Contract Data Requirements List Markings and Submissions
The Contractor shall ensure proper markings and data rights legends are applied to all submissions. Data delivered with improper markings shall be returned to the contractor for correction at no additional cost to the Government. No additional time for scheduled reporting will be allowed for improper markings. For information submitted by e-mail, ensure data containing For Official Use Only (FOUO) or other protected information is properly marked and encrypted. Do not send classified information except through authorized secure systems.
3.0 SECTION III – NON-RECURRING ENGINEERING TASKS
The contractor shall complete the following tasks for this effort. An Initial kick-off meeting will be scheduled.
3.1 INE Analysis and Implementation Plan
3.1.1 Perform predictions based upon failure history, INE operational usage scenarios, availability of cannibalization spares, aging assessments, repair and scrap assumptions to support ALCM INE Sustainment Assessment
3.1.2 Perform Obsolescence assessment of INE subassemblies to determine viability for continued repairs and/or re-manufacture
3.1.3 Perform Repair & Remanufacture assessments to determine options and resources needed to provide ongoing repair and/or remanufacture capability
3.1.4 Perform redesign and/or technology insertions for identified subassemblies to provide form, fit, and function replacement spares at best value to the government (avoid necessity for requalification and nuclear recertification as a goal)
3.1.5 Perform assessment of CCA and Instrument Test Equipment and provide & pursue options for supporting INE Sustainment
3.1.6 Provide Project Management for overall project leadership, customer interface and to ensure compliance to contract/SOW requirements and budgets.
Provide ongoing status to customer via verbal and written communication, reports, briefing charts etc. and pursue options as directed by the customer.
3.1.7 From the RMUC feasibility study performed under separate contract, the contractor shall test the compatible circuit cards from the 10 provided RMUCs to verify compatibility to ALCM -4 INE requirements for potential use.
3.1.8 Results of Tasks 3.1.1 through 3.1.7 will be documented via (CDRL
A010 – Scientific & Technical Report)
4.0 SECTION IV – SERVICE SUMMARY (SS)
The Contractor shall ensure the performance requirement thresholds and support for surveillance methods are achieved as follows:
4.1 Performance Requirement Threshold
The Contractor shall achieve the thresholds identified in Table 4-1.
4.2 Contractor Performance Evaluation
The evaluation of performance will occur when the Program Office evaluates the service of the Contractor via Contractor Performance Assessment Report (CPAR) to determine whether or not it meets the performance measures of the contract.
TABLE 4-1 - SERVICE SUMMARY
Performance Requirement PWS
Para Performance Requirement Threshold
SS-1: The Contractor shall ensure that all deliverables are submitted IAW the Delivery Schedule specified by PWS, and that the format, content, and distribution of such deliverables comply with
CDRL.
1.2.1, 1.2.2, 1.5,1.5.1, 1.5.2,1.5.3, 1.6.1,2.1,3.
Compliance with CDRL format and content with no more than two deficiencies per quarter.
If directed by PCO/COR to correct;
correct and resubmitted within 10 calendar days.
No more than one late CDRL delivery per quarter
SS-4: The Contractor shall complete all tasks by assigned due dates.
1.8 Completed on-time with no more than
two late submission per contract period. No individual submission more than 21 calendar days late or 25% of POP, whichever is less.
5.0 SECTION V – CONTRACT DATA REQUIREMENT LIST
TABLE 5-1 – CDRL Data Item Description
CDRL DID Title PWS Para
A001 DI-MGMT-81808 Risk Management Plan 1.2.1
A002 DI-MGMT-81809 Risk Management Status Report 1.2.1
A003 DI-QCIC-81379 Quality System Plan 1.2.2
A005 DI-MGMT-80227 Contractor's Progress, Status and Management Report
1.5, 1.5.3
A006 DI-MGMT-81605 Briefing Material 1.5.1,1.6.1
A008 DI-ADMN-81249B Conference Agenda 1.5.1, 1.5.2
A009 DI-ADMN-81250B Conference Minutes 1.5.1, 1.5.2, 1.6.2
A010 DI-MISC-80048 Scientific and Technical Report Summary
3.1.8
A011 DI-MGMT-80259 Recurring Inventory Report 2.1.1
A012 DI-MISC-80508B/T GFP Report 2.1.2
6.0 SECTION VI – ACRONYMS
ACO Administrative Contracting Officer AFB Air Force Base AFI Air Force Instruction AFNWC Air Force Nuclear Weapons Center ALCM Air Launched Cruise Missile ALMAG Air Launched Munitions Analysis Group ATE Automated Test Equipment CALCM Conventional Air Launched Cruise Missile CAP Contractor Acquired Property CCA Circuit Card Assembly CDRL Contract Data Requirements List CI Critical Information CISP Program Protection Plan COR Contracting Officer’s Representative CPAR Contractor Performance Assessment Report CPI Critical Program Information
DFARS Defense Federal Acquisition Regulation Supplement DID Data Item Description DoD Department of Defense EA Engineering Assignment ES Engineering Services FAR Federal Acquisition Regulation FOUO For Official Use Only GFE Government Furnished Equipment GFI Government Furnished Information GFM Government Furnished Material GFP Government Furnished Property GIDEP Government-Industry Data Exchange Program GNC Guidance, Navigation, and Control GPS Global Positioning System GRITS GPS Receiver/INE Test Set IAW In Accordance With IPT Integrated Product Team IUID Item-Unique Identification JTR Joint Travel Regulation MILSTRIP Military Standard Requisitioning and Issuing Procedures MSR Monthly Status Report MTL Mobile Test Laboratory NCE Nuclear Certified Equipment AFNWC/NDM Missile Sustainment Division NLT No Later Than OEM Original Equipment Manufacturer OFS Operational Flight Software OPSEC Operations Security PCO Procuring Contracting Officer POC Point of Contact PoP Period of Performance PMR Program Management Review PPP Program Protection Plan PWS Performance Work Statement QSP Quality System Plan SERP Sustaining Engineering Requirement Plan SS Service Summary TIM Technical Interchange Meeting
| 2017-09-21T09:31:05-0500 | |
| SORRELL.EUGENE.JR.1095974348 |
| 2017-09-21T09:07:50-0500 | |
| DANG.ROBERT.ANH.1184496247 |
File details come from the government source that posted it. Updated .