Questions-FA812621Q0015.pdf

PDF 278 KB Posted

Attached to
Bridge Crane Federal contract opportunity
Solicitation number
FA812621Q0015
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Crane, newest first.
File Type Posted
CRANE INSTALL SKETCH.pdf PDF
M20-062 - Item Description.pdf PDF
COMBO - FA812621Q0015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M20-062 Bridge Crane Solicitation Questions and Answers

1) Please provide each of the following regarding Item 1 (Louden 3 Ton Capacity Single Girder

Underhung Motor Driven Crane – or equivalent):

a) Please confirm that the indicated "75 FMP Travel Speed, 2 - 4 FPM Travel Speed” indicated in Item I.g. is for both of the following:

i. Crane.

ii. Hoist.

Crane (Bridge) speed is course travel rate 75 fpm with a fine travel rate between 2 and 4 fpm.

b) Hoist speed?

Hoist course travel rate is 14 fpm, fine travel rate is between 2 and 4 fpm.

c) Lifting height?

Lifting height is 20 ft.

d) Per the “Hoist A / B” reference in Item 1.m.i.:

i. What is the crane configuration?

ii. Is there any sketch?

Crane configuration, see attached sketch.

e) Frequency inverter for lifting?

Frequency inverter duty motors required.

2) Please provide each of the following regarding Item 3 (3 Ton Acco Work-Rated Monorail

Hoist-Close Headroom, Cross Mounted – or equivalent):

a) Please clarify the requirement to “Maintain 4 ft - 0 in Hook Centers” requirement in

Item 3.d. This requirement is not clear.

Hoists able to be positioned with 4 ft. between hook centers on same bridge.

b) Frequency inverter for lifting?

Frequency inverter duty motors required.

c) Please confirm that the Item 3 requirement is for four (4) equal hoists running on the same runway beam. That is our understanding of the overall Item 3 requirement.

4 hoists total, 2 bridges total, 2 hoists per bridge.

d) A diagram of the installation is requested for reference.

See attached sketch.

3) How will the cranes be suspended?

The cranes will be suspended from a steel structure.