Amendment1.doc

DOC document 41 KB Posted

Attached to
Boom Lifts and Man Lifts
Solicitation number
FA8126-15-Q-0148
Issued by

About this file

Amendment 1 offerors are required to sign and return 1 copy in acknowledgement of the amendment.

View the file

Other files

File Type Posted
Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-May-2015 03:00 PM to 11-Jun-2015 03:00 PM.

The following have been modified:

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Two (2) 30 ft Self – Propelled Electric Articulating Boom Lift Genie Model Z-30/20N (NARROW) or EQUIVALENT with the following OPTIONS:

Working height maximum 36 ft 11.14 m

Platform height maximum 30 ft 9.14m

Horizontal reach maximum 21 ft 5 in 6.53 m

Controls fully proportional controls

Power-Source 48V DC power source

Cylinder Bellows

Acrylic Console Shield

Hostile Environmental Kit

Vertical Jib

Flashing Amber Beacon

Platform Swing Gate

Air to the platform

Aircraft Protection Package

Two (2) New Genie GR20 Runabout or EQUIVALENT

Working height 25 ft 9 in

Platform height 19 ft 9 in

Lift capacity Up to 500 lbs

AC power to platform

Dual wheel brakes

Descent and tilt alarm

On board diagnostic system

Auxiliary platform lowering

Non-marking solid tires

Automatic 25 amp battery charger

FOB destination 12 weeks ADC

All offerors will be evaluated for technical acceptability, deemed either acceptable or unacceptable according to the requirements. Only technically acceptable offers will be considered for award.

Evaluation Criteria:

1) Technical Acceptabilty

2) Price

Factors 1 and 2, when combined, are of equal importance.

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .