CSS-FA8126-12-Q-0301.doc
DOC document 115 KB Posted
- Attached to
- Cart Kits
- Solicitation number
- FA8126-12-Q-0301
About this file
CSS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| image2012-07-02-130330 | — | |
| Cart Proposal Attachment with picture.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation
(IAW FAR 12.603)
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
The Oklahoma City-Air Logistics Center (OC-ALC/PKEA) at Tinker Air Force Base Oklahoma, intends to negotiate a firm fixed price contract for the acquisition of material listed below.
Proposal Submission Information: See 52.212-1 below.
EVALUATION OF RESPONSES:
Award will be conducted and evaluated under the provisions of FAR 12 and 15 procedures. The responsible offeror must be registered in the Online Representations and Certifications (ORCA) database (available at: http://orca.bpn.gov/) system per FAR 52.212-3, and submit a completed copy of the Offeror Representations and Certifications – Commercial Items with their quote. Offeror must also be registered in the Central Contractor Registration database (available at: www.ccr.gov) per FAR 52.212-1. Lack of registration in CCR will qualify contractor as ineligible for award. All responsible sources may submit a quotation in response to this solicitation, which shall be considered. This solicitation is being issued as a Request for Quotation (RFQ), for a firm fixed type contract. The Oklahoma City-Air Logistics Center (OC-ALC/PKEA) at Tinker Air Force Base Oklahoma intends to award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government (best value).
Number of Contracts to be Awarded:
The Government intends to select one contractor; however, the Government reserves the right to award no contract at all, depending on the quality of the proposals/quotes and prices submitted and the availability of funds.
Rejection of Unrealistic Offers
The Government may reject any proposal/quote that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
High Pressure Turbine KIT CART, 36"X36"X
FFP
High Pressure Turbine KIT CART, 36"X36"X38" 6 LEVEL, 2 SLIDING DRAWERS BLUE COLOR CARTS USING WHITE HIGH-DENSITY POLYETHYLENE (HDPE) 1" BLACK FOAM INSERTS, 4 LB DENSITY POLYETHYLENE
FOB: Destination
PURCHASE REQUEST NUMBER: F3YCFP2101A001
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
High Pressure Compressor 40"X40"X42" 3 L
High Pressure Compressor 40"X40"X42" 3 LEVEL, 2 SLIDES BLUE COLOR CARTS USING WHITE HIGH-DENSITY POLYETHYLENE (HDPE) 1" BLACK FOAM INSERTS, 4 LB DENSITY POLYETHYLENE
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
108 High Pressure Turbine Shroud, MOD 12
108 High Pressure Turbine Shroud, MOD 12 4 LEVEL, 2 SLIDES, REMOVEABLE BASE BLUE COLOR CARTS USING WHITE HIGH-DENSITY POLYETHYLENE (HDPE) 1" BLACK FOAM INSERTS, 4 LB DENSITY POLYETHYLENE
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
108 High Pressure Turbine Nozzle, MOD 10
108 High Pressure Turbine Nozzle, MOD 10 4 LEVEL, 2 SLIDE, REMOVEABLE BASE BLUE COLOR CARTS USING WHITE HIGH-DENSITY POLYETHYLENE (HDPE) 1" BLACK FOAM INSERTS, 4 LB DENSITY POLYETHYLENE
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 90 dys. ADC |
| 1 |
| F3YCFP |
76 PMXG/QPE
3001 STAFF DR
TINKER AFB OK 73145-3303
405-736-4116
F3YCFP
| 0002 |
| 90 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F3YCFP
| 0003 |
| 90 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F3YCFP
| 0004 |
| 90 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F3YCFP
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| JAN 2012 |
| 52.204-7 |
| Central Contractor Registration |
| FEB 2012 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| FEB 2012 |
| 52.212-3 |
| Offeror Representations and Certification--Commercial Items |
| APR 2012 |
| 52.212-3 Alt I |
| Offeror Representations and Certifications--Commercial Items (APR 2012) Alternate I |
| APR 2011 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| FEB 2012 |
| 52.212-5 (Dev) |
| Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Deviation) |
| MAY 2012 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| MAR 2012 |
| 52.223-3 |
| Hazardous Material Identification And Material Safety Data |
| JAN 1997 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-11 |
| Ozone-Depleting Substances |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-18 |
| Place of Manufacture |
| SEP 2006 |
| 52.225-25 |
| Prohibition on Engaging in Sanctioned Activities Relating to Iran--Certification. |
| NOV 2011 |
| 52.232-15 |
| Progress Payments Not Included |
| APR 1984 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.223-7001 |
| Hazard Warning Labels |
| DEC 1991 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program |
| JUN 2012 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| MAR 2008 |
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)
52.212-2 Evaluation Factors for Award
General Information
1. Basis for Contract Award:
This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 of this solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
2. Number of Contracts to be Awarded:
The Government intends to select one contractor for the award. However, the Government reserves the right to award no contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.
3. Rejection of Unrealistic Offers:
The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
4. Correction Potential of Proposals:
The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal not meeting the Government's requirements is not considered correctable, the offeror may be eliminated from the competitive range.
5. Evaluation Factors Factor 1—Technical Proposal Factor 2—Cost/Price
a. Evaluation Methodology:
Only those offerors determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Then, price will be evaluated and the proposals will be listed from lowest to highest price based on the total evaluated price.
Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.
b. Technical Factor:
Acceptable – The proposal meets specified minimum requirements necessary for acceptable contract performance.
Unacceptable – The proposal fails to meet specified minimum requirements necessary for contract performance. Proposals with an unacceptable rating are not awardable.
Technical acceptability will be based on an evaluation of proposals against the criteria stated below and all technical specifications in the SOW. Offerors are required to present all the information as stated in the Instructions to Offerors, FAR 52.212-1. The minimum requirement is met when the Offeror’s proposal thoroughly substantiates all the following essential criteria:
1. To build kit carts as designed on drawings and the specifications furnished by Tinker AFB.
2. Products must be made of Creform Tubular Material
3. Tolerances: +-.250 on all dimensions on height of carts
4. Tolerances: +- .125 on flatness of shelves
5. All shelves will be supported by at least 2 cross bars, installed with 28mm type pipe and metal brackets
6. All cart legs and frames will be made with w8mm type material and metal corner brackets
7. Where and when required, 28mm pipe will be double walled for strenghth
8. All cart with wheels must be 4” dia. With at least 2 wheels lockable
9. All wheels/castors type carts will have 2 swivel and 2 fixed type
10. Where required ½” thick HDPE plastic shlves will be utilized, all other areas will be ¼” thick
11. All carts will be blue in color using white HDPE
12. Foam inserts will be 1 inch thick, 4 lb density polyethylene, black.
13. There will be a white under layer to show contrast. Inserts will be Laser cut with a cavities to hold up to various quantity of blades on each shelf depending on TMS.
14. Layout of pattern for cavities on foam insert to be supplied by the customer with spacing and dimensions
c. Cost/Price Factor:
Cost/Price Evaluation: The offeror’s cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements (basic award) and all options. The government may determine that an offer is unacceptable if option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the offeror’s price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices plus other associated factors such as: first article testing cost, transportation cost, price evaluation adjustments for Small Disadvantaged Business Concerns, and application of labor hours to labor hour rates, etc.
Unrealistically Low Costs or Prices: Unrealistically low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.
Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalance pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or sub-line items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.
6. Determination of Contractor Responsibility To be eligible for award, an offeror must be determined responsible. A Determination of Contractor Responsibility will be conducted in accordance with FAR 9.1. Past performance information may be gathered from both Government (such as PPIRS, CPARS) and commercial sources. Offerors will not be penalized if no past performance information is available. Past performance will either be satisfactory, neutral, or unsatisfactory. Offerors rated as satisfactory or neutral equals a determination of responsibility. Offerors rated as unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution. An offeror who receives a determination of non-responsibility will not be eligible to receive the contract award.
7. Past Performance:
Past performance information may be gathered from both Government (such as PPIRS, CPARS) and commercial sources. Offerors will not be penalized if no past performance information is available. Past performance will either be satisfactory, neutral, or unsatisfactory where satisfactory equals a neutral or determination of responsibility, and unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution.
8. Discussions:
It is the Government’s intent to award without discussions; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions (FPRs) will be considered in making the source selection decision. If a request for FPR is issued, offeror responses to EN notices must be included in the FPR in order to be consider in the final evaluation.
9. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors, and all technical specifications of the Statement of Work (SOW). Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. In the case that a discrepancy exist between the Instruction to Offerors (ITO) and the evaluation factors for award, the evaluation criteria in 52.212-2 will take precedence
(End of provision)
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of provision
252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-O0004) (JAN 2012)
(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012,(Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that—
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that—
(1) It is [ ___ ] is not [X ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,
(2) It is [ ___ ] is not [X ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
5352.201-9101 OMBUDSMAN (AUG 2005) (AFFARS)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, Business & Mission Support Division Chief, Directorate of Contracting, OC-ALC/PKC, Tinker AFB OK 73145, Phone: 405-736-3273. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
(End of clause)
TAFB 100-16. WAWF DODAAC AND EMAIL DISTRIBUTION TABLE (COMBO)
In order to properly transmit your invoices electronically using WAWF https://wawf.eb.mil <https://wawf.eb.mil/> you must insert the following codes in order to transmit through the system each invoice:
Invoice Type:
INVOICE AND RECEIVING REPORT (COMBO)
*Contract Number:
SEE BLOCK 2
*Delivery Order:
*Issue Date:
SEE BLOCK 3
*Issue DODAAC:
FA8126
*Admin DODAAC:
FA8126
Inspected By DODAAC/Ext:
SAME AS SHIP TO
*Ship To Code/Ext:
Ship From Code:
LPO DODAAC/Ext:
*Pay DODAAC:
F03000
ADDITIONAL EMAIL NOTIFICATIONS:
1.
2. Thomas.long@tinker.af.mil
Payments may be expedited electronically via the Internet through the Wide Area Work Flow (WAWF) system.
WAWF may be accessed at https://wawf.eb.mil.
WAWF Training may be accessed online at http://www.wawftraining.com.
Payment information may be accessed using the DFAS website at https://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.
TAFB 100-17. “TRUCK ENTRY GATE” NOTICE
IMPORTANT DELIVERY INFORMATION
Tinker Air Force Base has constructed a “Truck Entry Gate” (Gate 33), which is located at the corner of 59th Street and Air Depot Blvd (southwest corner of the base). The gate will be opened beginning 15 September 2004.
Gate 33 shall be used for all deliveries by truck to this base.
(Trucks will not be allowed to gain access through any other gate.)
Since your firm’s delivery on this order is affected, please advise your delivery carrier to use the new gate. This should minimize the impact of your delivery.
DELIVERIES TO BUILDING 3001 (B / 3001)
Be advised that delivery vehicles destined for B / 3001 are prohibited from using “Staff Drive”.
Delivery vehicles may make deliveries only in designated unloading areas.
Since your firm’s delivery may be affected, ensure that your delivery carrier receives proper instructions on delivery / unloading requirements for B / 3001. Unloading in designated unloading areas will minimize any inconvenience, and, attendant ramifications, which may accrue, to your delivery / delivery carrier for failure to adhere to this requirement.
TAFB 100-18. IMPORTANT DELIVERY INFORMATION
If Block 15 “Deliver To”, Page 1 of the Standard Form 1449, directs delivery to the “Transportation Officer, BLDG 506, Door 22” be advised of the following:
1. All deliveries to Building 506, Door 22, will require appointments twenty-four (24) hours in advance. Any unscheduled delivery will be refused. Additionally, any carrier that arrives late may, at the receiving personnel’s discretion, be required to reschedule the appointment or wait for an available time slot the same day. No redelivery charges will be paid for rescheduled appointments. Delivery hours are Monday through Friday 7:00 AM (0700 Hours) – 1:00 PM (1300 Hours), excluding holidays, for local LTL carriers.
2. Carriers assigned standing appointments will be required to call for any additional deliveries (more than one per day). Delivery appointments will be made by contacting (405) 739-2349 from 7:00 AM (0700 Hours) – 3:00 PM (1500 Hours) Monday through Friday, excluding holidays. When calling for a delivery appointment, please specify trailer size, indicate whether load is palletized, and all pertinent information regarding the load (i.e., hazardous, explosives, oversized cargo, specialized, etc.). Carriers will ensure that all material to be delivered to the Building 506 receiving dock is tailgated/staged to the back of the trailer, any failure to comply with this request will cause the carrier to be turned away and their appointment will be rescheduled.
3. Delivery hours for long-haul drivers and air freight 7:00 AM – 6:00 PM. Should a long haul driver arrive after hours indicated above, the driver shall call the DDOO ESOC (405) 739-2488, 730-5612, and 739-5613 for delivery instructions.
TAFB 900-1 LIST OF ATTACHMENTS
DESCRIPTION
NR OF PAGES
TAFB Computer drawing
2 pages
TAFB Snap Shots
2 pages
Please review all documents carefully before completing
OFFEROR INFORMATION
BUSINESS NAME:
| STREET ADDRESS: |
| CITY, STATE, ZIP: |
CAGE CODE and/or DUNS:
BUSINESS WEB ADDRESS:
CONTACT PERSON:
| TELEPHONE: |
| FAX: |
E-MAIL:
DISCOUNT TERMS:
NET 30 or _______% IN _______ DAYS
DAYS REQUIRED FOR DELIVERY:
| Offerors Authorized Representative's Signature |
| Date |
| Type or Print Name |
| Position or Title |
Contractor is Required to sign this document and return 1 copy to issuing office. Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms and conditions specified herein.
File details come from the government source that posted it. Updated .