Fuel_OIl_Released_2J-TF33-53-11_WP009.pdf
PDF 554 KB Posted
- Attached to
- FUEL/OIL TEST STAND Federal contract opportunity
- Solicitation number
- FA8125-18-R-0017
About this file
2J-TF33-53-11
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| fuel_oil_solicitation_amendment..docx | DOCX document | |
| Fuel_Oil_Released_7J1-93-3.pdf | ||
| Fuel_Oil_Released_2J-TF33-53-11_WP018.pdf | ||
| fuel_oil_Released_7J1-91-3.pdf | ||
| Fuel_Oil_Released_6J24-10-13.pdf | ||
| Fuel_oil_Released_7J1-96-3.pdf | ||
| Fuel_Oil_Released_7J1-72-3.pdf | ||
| Fuel_oil_Released_7J1-94-3.pdf | ||
| Fuel_Oil_Released_7J1-93-3.pdf | ||
| Fuel_Oil_Released_7J1-84-3.pdf | ||
| Fuel_oil_Released_7J1-85-13.pdf | ||
| fuel_oil_Released_7J1-91-3.pdf | ||
| Test_stand_drawings.pdf | ||
| SOW-Fuel_Oil_Test_Stand_Purchase-Property_H8TC07_27June2018-Jandula.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK PACKAGE 009 00
APPLICABLE TCTOS
NONE
TECHNICAL PROCEDURES
HEATER, FUEL ANTI-ICING - DEPOT
MAINTENANCE
EFFECTIVITY: ENGINE MODELS TF33P-5 P-7A PW-100A PW-102 PW-
102A
REFERENCE MATERIAL REQUIRED
T.O. 2J-TF33-53-1 Introduction and General Information
SWP 005 01 Table of Limits
SWP 005 02 Table of Limits
SWP 005 03 Table of Limits
SWP 010 01 Inspection, Fluorescent Penetrant Normal Sensitivity (SPOP 62)
SWP 014 10 Plating, Nickel, on Stainless Steel, Nickel or Cobalt (SPOP 26)
WP 016 00 Brazing, General
SWP 016 01 Brazing, Silver
T.O. 2J-TF33-53-2 Rework and Reidentification
SWP 016 02 Heater Assembly - Fuel Anti-icing
CONSUMABLE MATERIALS
ACETONE PMC 9008, O-A-51
ALCOHOL, ISOPROPYL PMC 9094, TT-I-735
ALKALI SOLUTION -
BRAZE, SILVER AMS 2666
CLOTH, ABRASIVE, 120 GRIT -
FLUID, CALIBRATING (PMC
9041)
MIL-C-7024, TYPE II
Publication Number Publication Title
Nomenclature Specification Part No. CAGE Code
Page 1 of 13DISTRIBUTION STATEMENT "D" Chg. Date: 15 JUNE 2016 Rev: 5
12/4/2017file://52wwyk-as-2027v.area52.afnoapps.usaf.mil/PMXG-ETIMS$/ETOS/2J-TF33-53-11-WA-1/...
ILLUSTRATED SUPPORT EQUIPMENT
Figure T1. PWA 10888 Adapter
Figure T2. PWA 10890 Adapter
Figure T3. PWA 16464 Adapter
Figure T4. PWA 16465 Adapter
Figure T5. PWA 16466 Adapter
1 INTRODUCTION.
This Work Package contains instructions for fuel anti-icing heater assembly depot maintenance.
2 FUEL ANTI-ICING HEATER ASSEMBLY - DISASSEMBLY. (PN 398229 AND 518759) (P-5), (PN 479142 AND 495123) (P-7A), (PN 752816 AND 760136) (PW-100A) (PN 500405) (PW-102, -102A).
(See Figure 1.)
FLUX, SILVER BRAZING HIGH
TEMPERATURE
AMS 3411
METAL, FILLER AMS 5680
OIL, LUBRICATING MIL-L-7808
SOLVENT, PETROLEUM P-D-680, TYPE II
APPLICABLE SUPPORT EQUIPMENT
PWA 10888 Adapter T1
PWA 10890 Adapter T2
PWA 15189 Stand -
PWA 16464 Adapter T3
PWA 16465 Adapter T4
PWA 16466 Adapter T5
EXPENDABLE ITEMS
PACKING, PREFORMED 364125 AS REQUIRED
PACKING, PREFORMED MS9021-047 AS REQUIRED
a. Loosen screws, and remove metering plate(6, Figure 1) from air outlet flange(7).
b. Remove ten bolts and locknuts which secure air inlet flange(1) to housing(10).
c. Remove upper support(12) and flange.
Tool No. Tool Name Figure/Paragraph No.
Nomenclature Part No Quantity
Page 2 of 13DISTRIBUTION STATEMENT "D" Chg. Date: 15 JUNE 2016 Rev: 5
7 ASSEMBLY.
(See Figure 1.)
8 TEST.
(8) Fill fuel side of heater with fuel system calibrating fluid MIL-C-7024, Type II, and allow displaced air to bleed through valve in fuel-out adapter.
(9) Close valve after bleeding air.
(10) Apply test fluid at 490 to 510 psig (P-5) and 540 to 560 psig (P-7A, PW-100A, -102, and -102A0 at room temperature, until temperatures of test fluid and housing are stabilized at room temperature.
(11) Close valve on fuel-in adapter.
(12) There shall be no visible leakage and no loss of pressure during two-minute test period.
a. Lubricate and place two preformed packings(9)in grooves in ID of housing(10, Figure 1), and two preformed packings(3) in grooves on OD of core end plate(2).
Do not twist, bend, or scratch tubes or otherwise damage core.
Ensure performed packings do not crimp or break during assembly.
b. Insert end of core(4) into air inlet of body.
c. Align flat surface of eng plate OD(2) with flat surface of housing ID.
d. Push core into housing until it seats using arbor press.
e. Install gasket(11) in groove in air inlet flange.
f. Secure flange(1) and upper support(12) to body with bolts and locknuts. Torque 75 to 85 pound-inches.
g. Install gasket(8) in groove in air outlet flange.
h. Secure flange(7) and lower support(5) to body with ten bolts and eight locknuts. Torque to 75 to 85 pound-inches.
i. Install metering plate(6) on air outlet flange after satisfactory completion of testing.
j. Secure plate with two screws torqued 33 to 36 pound-inches. Ensure head of screw does not project above plate surface.
k. Stake each screw in two places.
Page 10 of 13DISTRIBUTION STATEMENT "D" Chg. Date: 15 JUNE 2016 Rev: 5
(See Table 2.)
CALIBRATING FLUID MIL-C-7024 is combustible and is an irritant to the skin, eyes, and respiratory system. Keep ignition sources away. Avoid direct body contact. Wear protective clothing/equipment. Provide adequate ventilation.
a. Following equipment and conditions needed to perform testing:
(1) Calibrating fluid MIL-C-7024, Type II.
(a) Maintain test fluid at room temperature.
Table 2. Heater Pressure Drop.
2400 0 to 1.0
14000 0 to 8.0
(2) Fuel pressure and air pressure sources capable of supplying 220 psig and 550 psig, respectively, at no-flow conditions.
(3) Pump capable of supplying test fluid at 14,000 phr with discharge pressure of 100 psig.
(4) Flowmeter to measure test fluid of 2,000 to 14,000 phr with accuracy of plus or minus one percent.
(5) Pressure gage to measure fuel and air pressures of 0 to 550 psig within 5 psig.
(6) Test adapters as follows:
(a) Two static pressure test adapters.
(b) One air outlet static pressure test adapter.
(c) One air inlet static pressure test adapter.
(d) One fuel inlet adapter.
(e) One fuel outlet adapter.
(7) Differential pressure gage capable of measuring differential pressures from 0 to 20 psi within 0 to ±0.1 psig at base pressure at 100 psig.
b. Perform the following tests:
W (phr) f Pressure Drop (psi)
Page 11 of 13DISTRIBUTION STATEMENT "D" Chg. Date: 15 JUNE 2016 Rev: 5
9 PREPARATION FOR STORAGE.
(1) Fuel side leak check.
(a) Install PWA 16465 and PWA 10888 adapters on fuel inlet port, and PWA 16466 and PWA 10888 adapters on fuel outlet port.
(b) Connect assembly to PWA 15189 stand assembly, or equivalent, using line of not more than
0.375 inch ID and not more than three feet in length.
(c) Connect pressure gage to fuel in adapter.
(d) Fill fuel side of heater with test fluid, and allow displaced air to bleed through valve in fuel-out adapter.
(e) Close valve after bleeding air.
(f) Apply and maintain 30 psig test fluid pressure until temperature of test fluid and heater body are stabilized at room temperature; then close valve.
(g) Indicated heater test fluid pressure shall not decrease more than five psig in two minutes with no make up. There shall be no visible leakage.
(h) Apply and maintain 540 to 560 psig test fluid pressure at room temperature; then close valve on fuel-in adapter.
(i) Indicated heater test fluid pressure shall not decrease more than five psi in two minutes with no make up. There shall be not visible leakage.
(2) Fuel side flow check.
(a) Remove PWA 10888 adapters, and connect differential pressure gage between remaining PWA 16465 and PWA 16466 adapters.
(b) Flowing in normal direction and maintaining 90 to 110 psig heater inlet pressure, measure heater pressure drop at flows specified in Table 2. Pressure drop shall be within limits shown.
(3) Air side leak check.
(a) Install PWA 16464 adapter on air inlet port and PWA 10890 adapter on air outlet port.
(b) Connect pressure gage to PWA 16464 adapter, using line of no more than 0.375 inch ID and no more than three feet in length.
(c) Apply 200 psig air pressure to air-in side of heater, and close valve on air-out side. Air pressure shall not decrease more than 100 psig in two minutes.
a. If anticipated storage period is 21 days or less, capping of both fuel ports and both air ports is sufficient, after draining excess fluid from unit.
Page 12 of 13DISTRIBUTION STATEMENT "D" Chg. Date: 15 JUNE 2016 Rev: 5
ENGINE OIL is combustible and is an irritant to skin, eyes, and respiratory system. Keep ignition sources away. Provide adequate ventilation. Minimize skin contact. Follow good hygiene practices. Wear protective clothing/equipment.
b. If anticipated storage period is more than 21 days, flush fuel side only with oil conforming to MIL-L- 7808.
(1) Connect flushing oil supply to fuel inlet, and pump oil through heater until all test fluid is removed.
(2) Drain excess oil, and cap all ports.