Level_3_Bullet_Proof_Doors(Questions_Answers).docx

DOCX document 14 KB Posted

Attached to
Bullet Proof Doors (Level 3)
Solicitation number
FA8125-17-Q-0034
Issued by

About this file

Contractor questions and answers

View the file

Other files

File Type Posted
Bullet_Item_Description_4.docx DOCX document
Bullet_Proof_Doors_Amendment_(2)CSS-1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Level 3 Bullet Proof Doors Questions and Answers

1. Overall timeline of the project?

Answer: 6-8 Week

2. Interior doors:

Wood or Steel?Answer: Steel
Welded Frame or Knockdown Frame (Adjustable onsite)?Answer: Welded Frame
Threshold?Answer: None
Weather Sweep?Answer: Yes
Door Hardware/Lockset/Cipher Lock Same as Exterior?Answer: Yes

3. Exterior Door:

Steel or wood?Answer: Steel
Welded Frame or Knckdown Frame (Adjustable onsite)?Answer: Welded Frame
Door Hardware/Lockset same as Interior?Answer: Yes