Performance_Work_Statement_for_Film_Processing_Equipment.pdf

PDF 472 KB Posted

Attached to
Film Processing II Federal contract opportunity
Solicitation number
FA8125-16-Q-0066
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Performance Work Statement (PWS) -- PM RM for Film Processing Equipment

View the file

Other files for this federal contract opportunity

Other files attached to Film Processing II, newest first.
File Type Posted
Wage_Determination_2005-2431_(Rev.-21) _Rev._Date_29_Dec_2015.pdf PDF
Appendix_A_--_Film_Processing_Equipment.pdf PDF
Official_Solicitation_SF_1449_--_FA8125-16Q-0066_--_Film_Processing_Equipment.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

Preventative Maintenance

On

Film Processing II AMXG

Prepared

By

OC-ALC/OCA

2 May 2016

Section One

1.0 Description of Services

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Preventive

Maintenance (PM) and Repair at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A.

1.1.1 The Contractor shall be responsible for insuring all services, parts and Original Equipment

Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform 1 PM per month on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the

Government Point of Contact (POC) within five (5) business days after contract award. The

Contractor shall notify the Government POC seven (7) business days prior to each scheduled PM visit.

1.3 Over and Above (O&A): O&A is defined as work discovered during the course of performing the Repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In

Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS)

252.217-7028. PGI 217.77. Due to units being under warranty any Repairs must be processed through the OEM until 17 March 2017.

1.4 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the GPOC will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.

the equipment identification number (ID#) a brief description of the malfunction location of equipment name and telephone number of the Point of Contact (POC)

Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days. (Tailor these dates dependent upon your requirement.)

1.5 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

the equipment ID# date of evaluation description of findings and recommendations required parts and part numbers (P/N) cost of parts number of parts needed estimated labor hours required to complete the repair

Any recommendations cited shall consider:

the priority of the requested service available source for obtaining new parts the availability of the new parts shipping and delivery schedules of parts other factors which may be peculiar to the specific repair requirement

1.6 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter

Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.6.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the

Contractor to ensure the repair is performed in a timely manner.

1.7 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

1.8 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the

Government SME. When necessary the Government SME will forward the service report to the

Government POC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the Government POC. As a minimum, the final service report shall contain the following information:

name of the company requested service date contract number equipment ID# description of services provided additional services recommended (if any) printed name and signature of technician who performed the services printed name and signature of on-site Government SME or Government POC start and completion dates complete breakdown of the labor cost (hours and rate) materials and parts used details of any other charges printed name and signature stating only new parts and materials were used written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.

1.9 Contractor Performance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The Government POC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the

CO or Government POC.

1.10 Corrective Action Report (CAR)/Complaint Contractor Response Time: The

Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or

Customer Complaint.

1.11 Maintenance Documentation: The Contractor shall notify the Government Subject Matter

Expert (SME) upon completion of each Preventive Maintenance / Remedial Maintenance /

Repair / or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.12 Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based

(FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The

Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.13 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI

21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.14 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

1.15 Continuation of Essential Department of Defense (DoD) Contractor Services During

Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.16 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 7:00am to 4:00pm. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert

(SME) or Government POC must be present with the Contractor.

1.16.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.17 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

Contractor shall submit a “Letter of Competency” stating that their technicians have experience in the PM and Repair of GE X-Ray Film Processors.

1.18 Contractor Personnel: The Contractor shall provide the name of the Contract Manager

(CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and Government POC, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-

ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The

Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.18.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel.

The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker

AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.19 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the GPOC within five (5) business days after the contract award date. Within five (5) business days, the

Contractor shall also provide an updated listing of personnel to the Government POC when employees affecting the work of this contract change status or position.

1.20 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction

(AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty Government POCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.21 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The

Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.21.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force

Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per

Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and

Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping

Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

1.22 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” in writing on company letterhead. This certification shall be provided to the Government POC within ten (10) days after award. Upon Government POC receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.22.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker

AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma

City Air Logistics Complex (OC-ALC) Supplement to AFI 32-7086, “Hazardous Materials

Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the Government POC monthly, the last business day of each month, or when the required work is completed. The Government POC will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4 th

) day of the following month or the first (1 st ) subsequent business day.

http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/

1.23 Safety Data Sheet (SDS) and Labeling: Upon Government POC receipt of the “No

HAZMAT Usage” certification, the requirements of this section no longer apply.

1.23.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72

ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the Government POC, ten (10) calendar days after contract award date all Safety

Data Sheets (SDSs) and a completed OC-ALC Form 152, SDS Information Sheet. The

Contractor shall receive approval from the Government POC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the

Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200

(2012): product identifier; signal word; hazard statement(s); precautionary statement(s);

pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The Government POC will forward all SDS submittals to 72

ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the Government

POC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and

SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.24 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” in writing on company letterhead. This certification shall be provided to the Government POC within ten (10) days after award. Upon Government POC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.24.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the Government POC if the required waste containers are not available on site.

1.25 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental

Compliance). Notice of intent documentation shall be provided to the Government POC within ten (10) days after award. The Government POC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into

IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.26 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment

Works (POTW). The Contractor shall provide a letter ten (10) calendar days after contract award date to the Government POC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.27 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the Government POC and UEC. The

Contractor shall provide five (5) copies of a typed or written report about the incident within four

(4) clock hours as follows:

One (1) copy to CO, two (2) copies to the Government POC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill

2.) Date and time of incident

3.) Location and source of spill

4.) Substance or pollutant spilled

5.) Amount spilled and rate of discharge

6.) Any damages or injuries involved

7.) Extent of area impacted

8.) Potential hazards

9.) Actions taken

10.) Organizations contacted

11.) Remarks Section - that addresses the cause of the spill (e.g. human error, Equipment, etc.) and whether 911 was called and which agencies responded.

1.28 Environmental Training: Upon Government POC receipt of the “No Hazardous Waste

Generation” certification, the requirements of this section no longer apply.

1.28.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure

Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the Government POC for approval within ten (10) calendar days after http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 contract award date. Once written approval is received from the Government POC, the

Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the Government POC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFBI 32-7004, “Hazardous Waste Management”.

1.29 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.30 FOD and DOP: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-

2232, AFMC Supplement 1, paragraph 9.2., and A4.3.4. (Initial)/A4.3.5. (Refresher). The

Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM. The Contractor shall provide a contractor devised certificate to the Government POC for each employee within five (5) business days after the contract award date. The certificates shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide a contractor devised certificate of training to the Government POC prior to the employees starting work in the OC-ALC shops. On an annual basis, the Contractor and Contractor personnel shall be required to review the

FOD/DOP training and to provide an updated contractor devised certificate of training to the

Government POC within five (5) business days of the new period of performance (PoP) start date.

1.31 Tool Control and Accountability: While performing contract services in or around

Maintenance Production Shops, which includes ramp areas, the Contractor shall maintain control of any and all tools to ensure accountability. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the Government POC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The

Government POC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the Government POC.

1.32 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

http://www.youtube.com/watch?v=tYcbodjFPnM

1.33 Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The

Government POC will assign a sponsor for the Contractor from within the organization. The

Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the

Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an

AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.34 Foreign Nationals: The Contractor shall notify the Government POC before sending a

Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.35 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, Government

POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government CA within one (1) business day of damage to

Government property or equipment during the execution of the contract.

1.36 Emergency Procedures: The Contractor personnel shall follow the direction of the

Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the

Contractor’s responsibility to account for their employees following an emergency evacuation.

The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.37 Training – General: The Government POC will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC. The Government will be responsible for all approved costs associated with the training identified below. The Government

POC will document training on and maintain copies of the completed AF IMT 1151, Training

Attendance and Rating, as part of the contract surveillance file. For purposes of identification and compliance with Personally Identifiable Information (PII) requirements, only the last four

(4) of the contractor employee’s Social Security Number (SSN) will be input on the form.

1.37.1 The Contractor shall contact the Government POC prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:

Contractor Required Courses Course Number

FOD and DOP Awareness Training Course Initial CHPMAS0000400SU

AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB

Initial Fire Safety and Prevention Training CTESAF0000100SU

Refresher Fire Safety and Prevention Training, Computer Based

Training (CBT)

CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR

OC-ALC Human Factors Training, CBT MTEMAS9700501BR

Environmental Management Systems (EMS) - General Awareness

Training

MTEENV9733070BR

Lockout/Tagout Course for Others, CBT CTEMAS0003002CB

Section Two

2.0 Performance Assessment

2.1 Quality Assurance Inspection/Acceptance: According to the contract's inspection of services clause, the government will evaluate the Contractor's performance under this contract.

The contract monitor is a representative of the CO and will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or Government POC.

2.2 Performance Evaluation Meetings: The Contract manager may be required to meet with

Government CO and the Government POC during the performance period of this contract.

Meetings will be as often as necessary thereafter as determined by the CO. The written minutes of all performance evaluation meetings may be prepared by the government and signed by the contract manager, CO, and Government POC. Should the Contractor non-concur with the minutes; the Contractor shall so state any areas of non-concurrence in writing to the CO within ten (10) calendar days of receipt of the signed minutes. The minutes will be included in the contract file.

Section Three

3.0 Government Furnished Property (GFP) and Services

3.1. Government Furnished Property.

3.1.1. Government Property Repair/Maintenance On-Base is not considered Government

Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government

Organizations (76th AMXG/MXDEN) for Government Property Repair/Maintenance On-

Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.

3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base.

-Not Applicable.

3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base.

3.2. Shared Property of the Government.

3.3. Government Furnished Services are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:

3.3.1. Security Forces. The Government will provide general on-base security forces’ service.

The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.

3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.

3.3.3. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.3.4. Telephone. The Government will provide telephone service consisting of the following

Classes of Service. The Contractor shall ensure that the Government provided telephone usage is limited to only official Government business related to the performance of this contract. The

Contractor shall furnish their own telephone service provided by local commercial carrier for their use in matters other than official Government business. NOTE: Only list applicable telephone service(s).

CLASS "A"/ CLASS OF SERVICE "1"

- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls

- Dial "98" for long distance calls

- Dial "94" Defense Switched Network (DSN) calls

- On-base calls

CLASS “D” / CLASS OF SERVICE "2"

- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls

- Dial "94" Defense Switched Network (DSN) calls

- On-base calls

CLASS “G” / CLASS OF SERVICE "3"

- For on-base calls only

CLASS "H" / CLASS OF SERVICE "4"

- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls

- Dial "98" for long distance calls

- On-base calls

*CLASS "F"/ CLASS OF SERVICE "5"

- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls

- On-base calls

3.3.5. Custodial Services. The Government will provide custodial services limited to the extent provided in the Base Custodial Contract(s) for the Government provided facilities.

3.3.6. Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris.

3.3.7. Insect and Rodent Control. The Base Civil Engineering Entomology will provide service for Government provided facilities.

3.3.8. Workspace. The Government will provide access to the equipment and adequate workspace around the equipment.

3.4. Intangible Government Property.

3.5. Contractor Acquired Property (CAP), Time & Material (T&M) or Fabrication.