PWS2__Blue_Grinder_10_Mar_15..pdf

PDF 242 KB Posted

Attached to
PM/RM of Butler Newall High Speed Blade Tip Grinder
Solicitation number
FA8125-15-R-0003
Issued by

About this file

PWS March 2015

View the file

Other files

File Type Posted
Redacted_J A.pdf PDF
FA8125-15-R-0003-_Blue_Grinder_Solicitation.pdf PDF
Appendix_A.xls XLS spreadsheet
Appendix_B.xlsx XLSX spreadsheet
Wage_Determination_Dated_Version_19_Dated_(December_22_2014).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Preventive and Remedial Maintenance of Butler Newall High Speed Blade Tip Grinder

10 Mar 2015

PREPARED BY:

OC-ALC/OBWK

TINKER AFB 73145

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION.

Scope. The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Butler Newall High Speed Tip Grinder Preventive (PM) and Remedial Maintenance (RM) for the Oklahoma City–Air Logistics Complex (OC-ALC). The Contractor shall also provide Personal Protective Equipment (PPE) and clothing, to include reflective clothing (belt, vest, etc.); hearing and eye protection, to include prescription safety glasses; safety harnesses; fall protection equipment;

lifting equipment and any incidentals necessary to perform the requirements of this Performance Work Statement (PWS). The Contractor shall be responsible for insuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS. The equipment is listed in Appendix A and Appendix B.

1.1. Requested Services: The Contractor shall perform three (3) PM’s per year and RM for the Butler Newall High Speed Tip Grinder.

1.2. Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and making adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform three (3) PM’s per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within five (5) business days after contract award.

The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit.

1.3. Remedial Maintenance (RM): RM is defined as unscheduled work requirements which are not otherwise defined in this PWS which includes the evaluation, troubleshooting and diagnosis of equipment to isolate the source of a malfunction.

1.3.1. Malfunction and Notification Process: Upon occurrence of equipment or system malfunction, the COR will contact the Contractor by telephone, email or fax and provide information below. If the COR notifies the Contractor via telephone, the COR will provide a written copy of the request by email or fax.

• the equipment ID#,

• a brief description of the malfunction

• location of equipment

• name and telephone number of the Point of Contact (POC)

PWS – High Speed Blade Tip Grinder

Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.

1.3.2. Equipment Evaluations: Contractor shall prepare and provide a written Estimate Repair Report to the Contracting Officer Representative (COR) by fax or email no later than (NLT) one

(1) business day after completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID #

• date of evaluation

• description of findings and recommendations

• required part(s) and part number(s)

• cost of part(s)

• number of part(s) needed

• estimated labor hours required to complete the repair

Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new part(s)

• availability of the new part(s)

• shipping and delivery schedules of part(s)

• other factors which may be peculiar to the specific repair requirement

1.4. Over and Above (O&A): O&A work means work discovered during the course of performing them repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. O&A shall be completed IAW Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028.

1.4.1. Authorizations for Over & Above: Over and Above (O&A) is provided if the contractor cannot repair the equipment entirely via the repair CLIN and additional repair actions are warranted to restore the equipment to full operational status. The Contractor shall not initiate work prior to receiving Contracting Officer authorization via an approved work request, submitted through the designated COR to the Contracting Officer. The contractor shall notify the Contracting Officer immediately if work is anticipated to exceed 75% of approved work request amount. Pricing will be definitized by the Contracting Officer via contract modification prior to commencement of work by the contractor and invoice submission.

1.5. Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

1.6. Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government Technical POC or COR. The Government Technical POC will forward the service report to the COR within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the COR. The Government will not pay an invoice submitted until an acceptable service report has been received from the Contractor. As a minimum, the final service report shall contain the following information:

• name of the company

• requested service date

• description of services provided

• additional services recommended (if any)

• printed name and signature of technician who performed the service(s)

• printed name and signature of on-site Government Technical POC or COR

• start and completion dates

• complete breakdown of the labor cost (hours and rate)

• material(s) and part(s) used

• details of any other charges

• printed name and signature stating only new parts and materials were used.

1.7. Return of Equipment. Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimated Repair Report.

1.7.1. Delivery. The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

1.7.2. Shipping. The Contractor shall provide to the COR, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Freight On Board (FOB) Destination. The ship to address is listed below. Ship to:

ATTN: SURVEILLANCE COR #/Contract No:_____________

OC-ALC/OBWK

BLDG 9001, Door E69-3

Tinker AFB OK 73145-3052

1.8. Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or COR.

1.9. Corrective Action Report/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action and preventive action(s) in relation to the submitted CAR or Customer Complaint.

1.10. Maintenance Documentation: The Contractor shall notify the Government Technical POC upon completion of each action IAW OC-ALC OI 21-203, Chapter 1, 2 and 3, as applicable.

1.10.1. Red Tagged Items: Red Tagged items create unsafe conditions for workplace and are noted by the annotation of a Red X, in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.10.2. Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instances that the Contractor clears a Red X in his or her assigned work area.

1.10.3. Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor or work leader.

1.11. Continuation of Essential DoD Contractor Services During Crisis: The Contractor shall establish and provide a written plan to ensure continued support during a crisis IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.237-7023 and 252.237-7024, which is incorporated in full text in the contract. This plan shall be submitted with the Contractor’s proposal.

1.12. Hours of Operation: The Contractor shall perform work required under this contract during the following days and hours: Monday through Friday, 7:00 AM-4:00 PM. These dates and hours exclude Federal Holidays, base closures due to inclement weather and Furlough Days, as applicable. If additional hours are required the Contractor should contact the CO for approval. Upon approval, the Government Technical POC or COR shall be present with the Contractor.

1.13. Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternate(s) who shall act for the Contractor when the manager is absent and they shall be designated in writing to the CO and COR within five (5) business days after contract award. The Contractor shall provide telephone numbers and email addresses of the

CM and alternate(s) where these persons may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak and understand English fluently.

1.13.1. The Contractor and Contractor personnel shall be required to identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.14. Listing of Contractor Employees: The Contractor shall provide an initial listing of Contractor employees’ names and position titles to the COR within five (5) business days after contract award. The Contractor shall also provide an updated listing of personnel to the COR when employees affecting the work of this contract, status changes or position changes within five (5) business days.

1.14.1. The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security and/or general well-being or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest, nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty CORs who are providing surveillance on any contracts/subcontracts awarded to the Contractor. All contract personnel depending on particular condition, occasion or place or job assignment shall require professional, suitable attire. All Contractor personnel shall conduct themselves in a professional, courteous manner.

The selection, assignment, reassignment, transfer, supervision, management and control of Contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.15. Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The

Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.15.1. Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

1.15.2. Material Safety Data Sheet/Safety Data Sheet (MSDS/SDS): Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Material Safety Data Sheets (MSDSs) or Safety Data Sheets (SDSs) and a completed OC-ALC Form 152, MSDS/SDS Information Sheet. The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer MSDS/SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The COR will forward all MSDS/SDS submittals to 72 ABW/CEIE for approval. A current manufacturer MSDS/SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer MSDSs/SDSs for all chemicals and MSDSs/SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.15.3. Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” in writing on company letterhead. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.15.3.1. The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This http://www.e-publishing.af.mil/ usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

1.15.4. Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” in writing on company letterhead. This certification shall be provided to the COR within ten (10) days after award.

Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.15.4.1. The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site.

1.15.5. Discharges: Any discharges into Tinker’s Industrial Waste Treatment Plant (IWTP) or sanitary sewer will be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.15.6. Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide a letter ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.15.7. Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident.

When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911.

If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

One (1) copy to CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.15.8. Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be on letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the COR three (3) business days prior to the pick-up or shipment of the part or equipment. The COR will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.

1.15.9. The Contractor shall ensure and provide written certification that the repaired part(s) is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be on company letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the COR two (2) business days prior to the return of the part or equipment.

1.16. Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense.

Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFBI 32-7004, “Hazardous Waste Management”.

1.17. Forms, Technical Orders (TO’s), AFI, AFMCI and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the COR will provide the form, instruction or publication to the Contractor upon written request (e-mail is acceptable) by the Contractor. In the event, laws, regulations, TO’s, AFI’s or Air Force Material Command Instructions (AFMCI’s) change during the term of this contract, the Contractor is required to comply as such changes come into effect. Contractors delivering or handling official USAF records shall comply with the applicable records management regulations, AFI 33-322, Chapter 3 in its entirety.

1.18. Housekeeping: The Contractor shall keep the work areas clean and neat IAW Industry Standards, OSHA, Fire and Safety Standards and this PWS.

1.19. Foreign Object Damage (FOD) and Dropped Object Prevention (DOP). Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps and in aircraft hangers and maintenance areas are required to receive FOD/DOP training and to comply with Air Force Materiel Command (AFMC) Sup1, Chapter 14, Paragraph 14.41 and Tinker AFBI 21-449, Chapter 4 in its entirety.

The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing either the Digital Versatile Disc (DVD) provided by the COR or at the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM. The Contractor shall provide a devised certificate to the COR for each employee within five (5) business days after contract award. The certificate(s) shall have the title of the training, name of the person who received the training and the date of the training. The Contractor shall also ensure all new employee(s) view the FOD/DOP Training and provide a Contractor devised certificate of training to the COR prior to starting work in the OC-ALC shops. Annually, the Contractor and Contractor personnel shall be http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.youtube.com/watch?v=tYcbodjFPnM required to review the FOD/DOP Training and provide an updated Contractor devised certificate of training to the COR.

1.20. Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, including ramp areas, the Contractor shall comply with AFI 21- 101_AFMC Sup 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1 &

14.5.3. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor shall turn in a Contractor Tool Listing, MXRIWRS Form 32 checklist to the COR prior to starting work in the OC-ALC Industrial Areas. Contractor personnel shall immediately notify the COR of any tools which are missing or lost from the work area or container (i.e. tool or job box, or tool bag). The COR will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. Contractor can obtain the Form 32 from the COR. The Contractor Manager (CM) shall ensure each employee on the job site is briefed on Housekeeping, FOD and Tool Control prior to starting work in OC-ALC Industrial Areas from the COR.

1.21. Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116 (in its entirety), Motor Vehicle Traffic supervision. The Contractor shall comply with Tinker AFBI 24-301 (in its entirety) for the operation of POVs within Tinker AFB.

1.22. Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for a Visitors Pass(s). The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor will arrange to meet at Pass and Registration, Building 6611 / Tinker Gate (South of I-40 off of Air Depot). The Contractor shall provide two (2) forms of identification (one of which shall be a picture ID) to the 72 SFS. The 72 SFS will provide an AF Form 75 (Visitors Pass) which will be valid for up to thirty (30) calendar days.

1.23. Foreign National(s): The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a US Government facility.

1.24. Health and Safety on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with Federal, State and Local regulations and AFI 91-203, Air Force Consolidated Occupational Safety Instruction, as established by this contract and Appendix C. The Contractor shall notify the CO of any injuries that occur to Contractor personnel while they are on the installation. The Contractor shall notify the CO of damage to Government property or equipment during the execution of the contract.

1.25. Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel in regards to emergency procedures, i.e. fire, tornado, active shooter, bomb threats, etc. It is the responsibility of the Contractor to provide guidance and establish procedures for responding to an emergency for their employees. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.26. Contractor Manpower Reporting (CMR): The Contractor shall report ALL Contractor labor hours (including sub-contractor labor hours), required for the performance of services provided under this contract for the US Air Force (AF) via a secure data collection site. The Contractor is required to completely fill in all required data fields at the website http://www.ecmra.mil.

1.26.1. Reporting inputs shall be for the labor executed during the PoP for each Government fiscal year (FY), which runs from 1 October through 30 September the following year. Although inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMR help desk email listed at http://www.ecmra.mil.

1.27. Training – General. The Government will provide training in a classroom, video or by the Government COR. The Government will be responsible for all approved costs associated with the training which is identified below in Table 1-1. The COR will document training on and maintain copies of the completed AF Form 1151(s), Training and Attendance Rating, as part of the contract surveillance file.

1.27.1. The Contractor employees shall complete all required training, to include but not limited to the below, within thirty (30) business days of the performance start date or the Contractor employee hire date if the hire date is after the PoP start date. The Contractor shall notify the COR about any new employee working under this contract, in writing, within five (5) business days.

Contractor Training Requirements Table 1-1 Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training (CBT) CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9700138BR OC-ALC Human Factors Training, CBT MTEMAS9700501BR http://www.ecmra.mil/ http://www.ecmra.mil/

Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR

2. SERVICE SUMMARY.

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary does not detract from its enforceability nor limit the rights of remedies of the Government under any other provision of the contract. The Contractor shall ensure the following service summary requirements are accomplished.

Service Summary (SS) Table 2-1

SS PERFORMANCE OBJECTIVE PWS

PARA.

PERFORMANCE

THRESHOLD

SS 1

The Contractor shall perform three (3) PM’s per year and RM for the Butler Newall High Speed Tip Grinder.

1.1. 100% Compliance

SS 2

The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform three (3) PM’s per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within five (5) business days after contract award. The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit.

1.2. 100% Compliance

SS 3

RM is defined as unscheduled work requirements which are not otherwise defined in this PWS which includes the evaluation, troubleshooting and diagnosis of equipment to isolate the source of a malfunction.

1.3. 100% Compliance

SS 4

The COR will contact the Contractor by telephone, email or fax and provide information below. If the COR notifies the Contractor via telephone, the COR will provide a written copy of the request by email or fax.

• the equipment ID#,

• a brief description of the malfunction

• location of equipment

• name and telephone number of the Point

1.3.1. 100% Compliance

SS PERFORMANCE OBJECTIVE PWS

PARA.

PERFORMANCE

THRESHOLD

of Contact (POC)

Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.

SS 5

Contractor shall prepare and provide a written Estimate Repair Report to the Contracting Officer Representative (COR) by fax or email no later than (NLT) one (1) business day after completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID #

• date of evaluation

• description of findings and recommendations

• required part(s) and part number(s)

• cost of part(s)

• number of part(s) needed

• estimated labor hours required to complete the repair

Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new part(s)

• availability of the new part(s)

• shipping and delivery schedules of part(s)

• other factors which may be peculiar to the specific repair requirement.

1.3.2. 100% Compliance

SS 6

The Contractor shall not initiate work prior to receiving Contracting Officer authorization via an approved work request, submitted through the designated COR to the Contracting Officer. The contractor shall notify the Contracting Officer immediately if work is anticipated to exceed 75%

1.4.1. 100% Compliance

PERFORMANCE

THRESHOLD

of approved work request amount.

SS 7

The Contractor shall provide a written Service Report to the Government Technical POC or COR.

The Government Technical POC will forward the service report to the COR within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the COR. The Government will not pay an invoice submitted until an acceptable service report has been received from the Contractor. As a minimum, the final service report shall contain the following information:

• name of the company

• requested service date

• description of services provided

• additional services recommended (if any)

• printed name and signature of technician who performed the service(s)

• printed name and signature of on-site

Government Technical POC or COR

• start and completion dates

• complete breakdown of the labor cost

(hours and rate)

• material(s) and part(s) used

• details of any other charges

• printed name and signature stating only new parts and materials were used.

1.6. 100% Compliance

SS 8

The Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimated Repair Report.

1.7. 100% Compliance

PERFORMANCE

THRESHOLD

SS 9

The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

1.7.1. 100% Compliance

SS 10

The Contractor shall provide to the COR, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Freight On Board (FOB) Destination. The ship to address is listed below. Ship to:

ATTN: SURVEILLANCE COR #/Contract

No:_____________

OC-ALC/OBWK

BLDG 9001, Door E69-3

Tinker AFB OK 73145-3052

1.7.2. 100% Compliance

SS 11

The Contractor shall establish and provide a written plan to ensure continued support during a crisis IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.237-7023 and 252.237-7024, which is incorporated in full text in the contract. This plan shall be submitted with the Contractor’s proposal.

1.11. 100% Compliance

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Government Furnished Property.

3.1.1. Government Property Repair/Maintenance On-Base.

Government Property Repair/Maintenance On-Base is not considered Government Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government Organizations (76 PMXG) for Government Property Repair/Maintenance On-Base will be responsible for the Government Property record keeping, reporting requirements (including Report of Survey), and/or disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.

3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base.

In Accordance With (IAW) FAR Part 45 Rewrite June 2007 – FAR 45.107(d), the Government Property Clause(s) are applicable when the GFP requires repair/maintenance off-base and the cumulative acquisition cost of all the GFP going off-base exceeds the Simplified Acquisition Threshold (SAT) $150,000. The Contractor shall ensure all GFP is secured at the close of each work-day. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property clauses will be cited in the solicitation/contract. The GFP is identified in Appendix B.

3.1.2.1. Shipment to Contractor or Pick up by Contractor. In Accordance With PWS Section 1.

3.1.2.2. Return Shipment or Delivery to Government. In Accordance With PWS Section 1.

3.1.2.3. Loss of Government Property. IAW the Government Property contract clauses.

3.1.2.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.

3.1.2.5. Plant Clearance (Disposition) Instructions. Disposition of GFP will be IAW the Government Property clause, other contractual requirements, and/or the direction from the Government CO. Disposition instructions may include Defense Logistics Agency (DLA) Disposition Services [formerly Defense Reutilization Marketing Office (DRMO)] for disposal.

Plant Clearance Automated Reutilization Screening System (PCARRS) shall not be required for disposal of Government Property.

3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base.

In Accordance With (IAW) FAR Part 45 Rewrite June 2007 – FAR 45.107(d), the Government Property Clause(s) are not applicable when the GFP requires repair/maintenance off-base and the cumulative acquisition cost of all the GFP going off-base does not exceed the Simplified Acquisition Threshold (SAT) $150,000. However, the Contractor shall comply with the contract terms and conditions which includes this PWS. The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The GFP is identified in Appendix B.

3.1.3.1. Shipment to Contractor or Pick up by Contractor. In Accordance With PWS Section 1.

3.1.3.2. Return Shipment to Government or Delivery to Government. In Accordance With PWS Section 1.

3.1.3.3. Loss of Government Property.

3.1.3.3.1. The Contractor’s off-site (not on Tinker AFB) liability for the Government Property shall begin when the GFP is removed from Tinker AFB. The Contractor’s off-site liability for this GFP shall remain in effect until the return shipment/delivery is received by the Government at the destination specified in the contract, FOB Destination (Contractor’s expense).

3.1.3.3.2. Since the GFP is less than the Simplified Acquisition Threshold (SAT) $150,000, the Government will use the Report of Survey (ROS) to process Loss of Government Property incidents/accidents.

3.1.3.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.

3.1.3.5. GFP Records, Reports, and/or Disposal.

The responsible Government Organization (76 PMXG) for GFP will be responsible for GFP record keeping, reporting requirements (includes Report of Survey), and/or disposal of all GFP that was used and/or in the possession of the Contractor during the performance of this contract.

3.2. Shared Property of the Government. Not Applicable.

3.3. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB, OK:

3.3.1. Security Forces. The Government will provide general on-base security forces' service. The security forces’ telephone numbers are 911 for emergencies, 734-2000 for crime in progress, and 734-3737 for non-emergency calls.

3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 734-3981. For routine calls to dispatch call 734-7964.

3.3.3. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the Contractor requires additional utility services, it shall be the Contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.3.4 Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris.

3.4. Intangible Government Property (Patents, Data, Copyrights, Software, etc.)

Intangible Government Property is not covered by FAR Part 45 plus supplements, but is covered by FAR Part 27 and DFARS 227 plus supplements.

When applicable and in accordance with Government procedures, the Government will furnish, without cost, Intangible Government Property to the Contractor. All Intangible Government Property shall remain at all times sole property of the U.S. Government. All Intangible Government Property used, input, processed, acquired, modified, developed, and/or generated by the Contractor in support of this contract, in any media, shall remain at all times sole property of the U.S. Government.

The Contractor may not use or disclose any Intangible Government Property for any purpose or in any manner not specifically authorized or required by the contract and this PWS.

The Contractor shall ensure all Intangible Government Property is secured at the close of each workday. The Contractor shall use reasonable care to avoid losing and/or damaging Intangible Government Property. If the Contractor’s failure to use reasonable care causes loss and/or damage to Intangible Government Property, the Contractor shall be liable for the cost to replace the Intangible Government Property, which may be deducted from the contract price.

The Contractor shall use, input, process, maintain, and return all Intangible Government Property in the English language, readable and in a readily retrievable format, which requires no additional software or tools to read and retrieve beyond those already installed on the affected U.S. Government computers.

During contract performance, contract completion, and/or termination, the Contractor shall return all Intangible Government Property to the Government COR. The Contractor shall comply with the applicable contract clauses and this PWS.

3.5. Contractor Acquired Property (CAP). Not Applicable

PERFORMANCE WORK STATEMENT (PWS)
PREPARED BY:
OC-ALC/OBWK
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1. Government Furnished Property.

3.1.3.3. Loss of Government Property.

File details come from the government source that posted it. Updated .