vert_mills_sol_amend.doc

DOC document 72 KB Posted

Attached to
TEST, TEARDOWN, EVALUATE & REPAIR VERTICAL MILLING MACHINES.
Solicitation number
FA8125-13-Q-0026
Issued by

About this file

AMENDMENT OF SOLICATION DOCUMENT.

View the file

Other files

File Type Posted
Appendix_A_-_2_Vertical_Milling_Machine.docx DOCX document
APPENDIX_C_Vertical_Mills.docx DOCX document
VERT_MILLS_SOL.doc DOC document
WAGE_DETR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from TTE for 76 PMXG 1 each Vertical Milling Machine.The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to test, teardown and evaluate one (1) Vertical Milling Machine. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the (1) each Vertical Milling Machine.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 18 Apr 13 through 31 May 13***PRICING: Pricing is for TT& E of 1 each Vertical Mills Machine; this price is a Firmed Fixed Price amount. After the TT&E and it's determined what repairs are required, the contractor shall obtain approval to proceed.FFP: $----CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006 to TTE for 76 PMXG 1 each Vertical Milling Machine.The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to test, teardown and evaluate one (1) Vertical Milling Machine. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the (1) each Vertical Milling Machine.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 14 May 13 through 14 Aug 13***PRICING: Pricing is for TT& E of 1 each Vertical Mills Machine; this price is a Firmed Fixed Price amount. After the TT&E and it's determined what repairs are required, the contractor shall obtain approval to proceed.FFP: $----CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.

CLIN 0002

The CLIN extended description has changed from The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to REPAIR one (1) Vertical Milling Machine. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair one (1) Vertical Milling Machine.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 18 Apr 13 through 31 May 13***PRICING: Pricing is for the Repair services to the Vertical Mills Machine. Travel costs, per Diem will be Reimbursed at the established rates per the Joint Travel Regulation (JTR). Must be supported by proof of payment via receipts.***Travel receipts SHALL be submitted with invoice.All parts will be reimbursed at cost and therefore original receipts are required.**LABOR RATE (Fixed):$**TRAVEL LABOR RATE (Fixed): $**Labor hours per basic Esimated Quantity (BEQ) of 32 total hours.**Material Costs are estimated at $2,000.00. ***These Costs will be added at the time of award. Material Costs will be added to the Total Evaluated Price of contractRepair estimated at a Not to Exceed (NTE) price. NTE Price: $----POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO: to The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to REPAIR one (1) Vertical Milling Machine. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair one (1) Vertical Milling Machine.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 14 May 13 through 14 Aug 13***PRICING: Pricing is for the Repair services to the Vertical Mills Machine. Travel costs, per Diem will be Reimbursed at the established rates per the Joint Travel Regulation (JTR). Must be supported by proof of payment via receipts.***Travel receipts SHALL be submitted with invoice.All parts will be reimbursed at cost and therefore original receipts are required.**LABOR RATE (Fixed):$**TRAVEL LABOR RATE (Fixed): $**Labor hours per basic Esimated Quantity (BEQ) of 32 total hours.**Material Costs are estimated at $2,000.00. ***These Costs will be added at the time of award. Material Costs will be added to the Total Evaluated Price of contractRepair estimated at a Not to Exceed (NTE) price. NTE Price: $----POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:.

CLIN 0003

The CLIN extended description has changed from TTE for 76 CMXG 2 each Vertical Milling Machines.The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to test, teardown and evaluate two (2) Vertical Milling Machines. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the Vertical Milling Machines.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 18 Apr 13 through 31 May 13***PRICING: Pricing is for TT& E of 2 each Vertical Mills Machines; this price is a Firmed Fixed Price amount. After the TT&E and it's determined what repairs are required, the contractor shall obtain approval to proceed.FFP: $----CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006 to TTE for 76 CMXG 1 each Vertical Milling Machines.The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to test, teardown and evaluate ONE (1) Vertical Milling Machines. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the Vertical Milling Machines.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 14 May 13 through 14 Aug 13***PRICING: Pricing is for TT& E of 1 each Vertical Mills Machine; this price is a Firmed Fixed Price amount. After the TT&E and it's determined what repairs are required, the contractor shall obtain approval to proceed.FFP: $----CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.

CLIN 0004

The CLIN extended description has changed from The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to REPAIR two (2) each Vertical Milling Machines. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the Vertical Milling Machines.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 18 Apr 13 through 31 May 13***PRICING: Pricing is for the Repair services to the 2 each Vertical Mills Machines. Travel costs, per Diem will be Reimbursed at the established rates per the Joint Travel Regulation (JTR). Must be supported by proof of payment via receipts.***Travel receipts SHALL be submitted with invoice.All parts will be reimbursed at cost and therefore original receipts are required.**LABOR RATE (Fixed):$**TRAVEL LABOR RATE (Fixed): $**Labor hours per basic Esimated Quantity (BEQ) of 48 total hours.***Material Cost estimated at $7,500.00***These Costs will be added at the time of award. Material Costs will be added to the Total Evaluated Price of contract.Repair estimated at a Not to Exceed (NTE) price. NTE Price: $----POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO: to The Contractor shall provide all labor, parts, materials, tools, equipment, test equipment, quality control, transportation, inspection manuals, as well as personal protective equipment (PPE) and clothing. The PPE and clothing shall include the following: hearing and eye protection, plus prescription safety glasses, lifting equipment, and any other incidentals necessary to travel to Tinker AFB, OK, to REPAIR ONE (1) each Vertical Milling Machine. Should equipment require repair at contractor’s site, the contractor shall provide all labor, tools, equipment, parts, supplies, materials, transportation and other incidentals necessary to repair the Vertical Milling Machine.The contractor shall provide transportation to contractor’s facility and back to Tinker Air Force Base. The Contractor shall be responsible for insuring that all of the services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed at Appendix A. **PERIOD OF PERFORMANCE: 14 May 13 through 14 Aug 13***PRICING: Pricing is for the Repair services to the 1 each Vertical Mills Machine. Travel costs, per Diem will be Reimbursed at the established rates per the Joint Travel Regulation (JTR). Must be supported by proof of payment via receipts.***Travel receipts SHALL be submitted with invoice.All parts will be reimbursed at cost and therefore original receipts are required.**LABOR RATE (Fixed):$**TRAVEL LABOR RATE (Fixed): $**Labor hours per basic Esimated Quantity (BEQ) of 48 total hours.***Material Cost estimated at $7,500.00***These Costs will be added at the time of award. Material Costs will be added to the Total Evaluated Price of contract.Repair estimated at a Not to Exceed (NTE) price. NTE Price: $----POINT OF CONTACT(POC)/ INSPECTION and ACCEPTANCE:Sandra Petersen 76 MXW/OBWK 405-734-1811CONTRACTOR TO SUBMIT INVOICES MONTHLY IN ARREARS OF SERVICES THROUGH WIDE AREA WORKFLOW (WAWF). SEE CLAUSE 252.232-7006.CONTRACTOR IS SAM REGISTERED.REGISTRATION VALID UNTIL:DUNS NO:.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 18-APR-2013 TO

31-MAY-2013

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

FOB: Destination

F3YCEB

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 14-MAY-2013 TO

14-AUG-2013

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 18-APR-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 14-MAY-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 18-APR-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 14-MAY-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 18-APR-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 14-MAY-2013 TO

N/A
F3YCEB

SANDRA CAMPBELL

OC-ALC/MADWRS

3001 STAFF DR STE S69

TINKER AFB OK 73145

405-582-1230

F3YCEB

(End of Summary of Changes)