PERFORMANCE WORK STATEMENT

FOR

CLEANING OF PLASMA SPRAY BOOTHS

PREPARED BY:

76MXW/OBWK

TINKER AFB, OK

15 Sept 2011

1. DESCRIPTION OF SERVICES.

1.1. Scope. The contractor shall provide all labor, tools, equipment, test equipment, personal protective equipment and clothing, including reflective clothing (belt, vest, etc), hearing and eye protection including prescription safety glasses, safety harness, fall protection equipment, lifting equipment and any incidentals necessary to travel to Tinker AFB, OK to provide cleaning services for Plasma Spray Booths, Plasma Spray Booth Dust Collectors and Grit Blast Dust Collectors in the Plasma Spray Shops, Building 3001 and Building 3221. The contractor shall be responsible for insuring all services provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications, industry standard practices, and this Performance Work Statement (PWS). Equipment is identified at Appendices A and B.

1.1.1. The contractor shall provide and use a High Efficiency Particle Abatement (HEPA) type vacuum filter system (a drum mounted HEPA vacuum is recommended). A secure location in the facility will be provided to store the vacuum.

1.1.2. When replacement drums are required, the contractor shall notify the equipment/ shop Point of Contact (POC) of the exact number of drums needed. A minimum of two (2) days notification is needed prior to time for changing drums.

1.1.3. Based on historical data, approximately 45 drums are changed out each month.

1.1.4. The contractor shall provide a pallet jack to transport drums between the mezzanine and ground floor level and to move loaded pallets at the ground floor level.

1.1.5. All maintenance on contractor provided equipment shall be performed off-site.

1.1.6. After contract award, the contractor shall provide applicable Material Safety Data Sheets (MSDS) to the Contracting Officer Representative (COR) and to the MXRI Unit Environmental Coordinator (UEC) for approval before any services are provided (see paragraph 1.6.).

1.2. Specifics.

1.2.1. Weekly Services. The contractor shall provide the following weekly services for equipment listed in Appendices A and B.

1.2.1.1. The contractor shall check the drums under filtration systems/collectors once a week to determine the fullness of each drum. A drum is considered full when it contains approximately 50% capacity of the drum of blast media and 60% capacity of the drum of powder waste. Full drums shall be replaced with empty drums. The full drum shall be sealed and transported/stored at site designated by the government, which is located in the shop area (Post I73 in building 3001 and post G3 in building 3221).

1.2.1.2. The quantity of waste in plasma spray blast media drums shall be within DOT regulations (49 CFR 178.504(b)(9) & 509(b)(8) and Tinker Instructions (TI-32-7004). The plasma spray blast media and powder dust drums shall not exceed 800 lbs. Based on historical data, 800 lbs weight will be accomplished when drum is full. A definition of full drum is provided in section1.2.1.1. The contractor shall place the lid and shall place the drums in the designated area for pickup.

1.2.1.3. The area around the dust collection drums including the hopper section of the collector (approximately 10’ circle) shall be vacuumed by the contractor to remove any thermal spray or grit blast materials (Appendix B).

1.2.1.3.1. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.1.3.2. The contractor shall not mix the contents of one drum with another and shall not rotate drums between different dust collector systems (Appendix B).

1.2.1.3.3. The contractor shall be responsible for raising and lowering the drums between the floor and mezzanine levels, approximately 16 feet (Appendix B).

1.2.1.3.4. Full drums shall not be left in the mezzanine area overnight.

1.2.1.4. The contractor shall place all drums stored at floor level on government furnished pallets (Appendix B).

1.2.1.4.1. The contractor shall be responsible for generated waste to be placed in government provided drums. The contractor shall notify equipment/shop POC that the drums are full.

1.2.1.5. The contractor, while the dust collection system is on, shall air blast all thermal spray equipment, walls, and floors to dislodge the thermal spray accumulation. The contractor shall vacuum the inside floor area of booths to remove all plasma spray powder/residue that may have accumulated due to overspray during the plasma spray process (Appendix A).

1.2.1.5.1. The contractor shall vacuum and clean the floor area around the powder feeders approximately 4 x 4 sq. ft. to 4 x 6 sq. ft (Appendix A).

1.2.1.5.2. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.1.6. The contractor shall peel/wipe, vacuum, and clean the exterior surface of the galvanized steel exhaust hood and all wall panels to remove plasma spray powder that may have accumulated due to overspray (Appendix A).

1.2.1.6.1. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.1.7. The contractor shall document each maintenance action on Maintenance Log Book. The Maintenance Log shall be annotated, with an explanation of work accomplished for the day, every time the contractor provides services.

1.2.1.7.1. A copy of the Maintenance Log Book shall remain in the shop and a copy shall be provided to the COR within five (5) working days after the end of the month.

1.2.2. Quarterly Services. The contractor shall provide the following services on a quarterly basis.

1.2.2.1. The contractor shall clean the entire floor area of the plasma spray and blast areas (areas around the exterior of each plasma spray booth including the tool crib and main aisle) to remove the grit blast media/residue and plasma spray reside that may have accumulated on the floor. This will require the contract to vacuum and scrub these areas to remove all residues (approximately 12,800 sq. ft).

1.2.2.2. The contractor shall clean the entire floor area of the plasma spray shop mezzanine areas to remove all grit blast media/residue and plasma spray residue that may have accumulated on the floor (approximately 4,000 sq. ft).

1.2.2.2.1. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.2.3. The contractor shall document each maintenance action on the Maintenance Log Book. The Maintenance Log shall be annotated, with an explanation of work accomplished for the day, every time the contractor provides services.

1.2.2.3.1. A copy of the Maintenance Log shall remain in the shop and a copy shall be provided to the Quality Assurance Personnel (COR) within five (5) working days after the end of the month.

1.2.3. Semi-Annual Services. The contractor shall provide the following Semi-Annual services for equipment listed in Appendix B, items 1 through 12.

1.2.3.1. The contractor shall paint entire surface area of the galvanized exhaust hood with environmentally safe, peel coat paint. After initial painting, the contractor shall inspect and strip coating from entire area that requires repainting prior to repainting. The peel coating shall be non-reflective black in color.

1.2.3.1.1. The new coat shall be applied thick enough to facilitate removal by stripping rather than scraping off.

1.2.3.2. The contractor shall paint the wall panels (approximately 9’ x 7’) next to the exhaust hood that are in direct reach of the plasma spray torch with non-reflective black peel coat paint.

1.2.3.2.1. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.3.3. The contractor shall vacuum inside interior floor area of the galvanized steel exhaust hood to remove plasma spray powder that may have accumulated due to overspray during the plasma spray process.

1.2.3.3.1. The contractor shall dispose of all dust and residue in accordance with Section 1.2.4. of this PWS.

1.2.3.4. The contractor shall document each maintenance action on the Maintenance Log Book. The Maintenance Log shall be annotated, with an explanation of work accomplished for the day, every time the contractor provides services.

1.2.4. Collection of Residue and Waste. The contractor shall collect, segregate, and place all residue and generated waste into government provided drums according to TAFB Instructions 32-7004. Containers shall be labeled and disposal action taken by the government.

1.3. Government Acceptance. Designated COR(s) will accomplish inspection and acceptance of services performed based on requirements of the PWS, the inspection of services clause and Quality Assurance Surveillance Plan (QASP).

1.4. Quality Assurance: According to the contract’s inspection clause, the government will evaluate the contractor’s performance under this contract. The COR is a representative of the CO and will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the contractor during the period of this contract will be subject to review by the CO or COR.

1.5. Contractor Response Time: The contractor shall provide written response addressing the root cause, corrective action and preventive action(s). The contractor will be given 2 working days to answer a submitted Corrective Action Report (CAR), Performance Action Report (PAR) and Customer Complaint.

1.6. Continuation of Essential DoD Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.7. Hours of Operation: The contractor shall perform work required under this contract during the following hours Monday through Friday 3:00 PM - 11:00 PM, excluding Federal Holidays.

1.8. Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternate(s) who shall act for the Contractor when the manager is absent and they shall be designated in writing to the Contracting Officer and the COR within five (5) work days after contract award. The Contractor shall provide telephone numbers of the Contract Manager and alternate(s) where these persons may be contacted at any time. The Contract Manager or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at Tinker AFB. The Contract Manager or alternate shall be available to meet on the installation with Government personnel designated by the Contacting Officer to discuss problem areas. The Contract shall provide a Contract Manager who can read, write, speak, and understand English fluently.

The Contractor and all their employees shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, the Contractor and all their employees shall identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.8.1. Listing of Contractor Employees: The contractor shall provide an initial listing of Contractor employees’ names and position titles to the CO and the COR prior to contract start date. The contractor shall also provide an updated listing of personnel to the CO and the COR when employees affecting the work of this contract, statuses change, or position changes within ten (10) work days.

1.8.2. The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well being or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty QAE’s/COR’s who are surveilling any contracts/subcontracts awarded to the Contractor. All contract employees depending on particular condition, occasion or place, or job assignment shall require professional, suitable attire. All contractor employees shall conduct themselves in a professional, courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of Contractor employees in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.9. Environmental Protection & Safety: The contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The contractor shall comply with any laws, instructions or regulation changes during the term of this contract. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, and cleanliness.

1.10. Hazardous Material: Contractor not occupying space on base: The contractor shall not store chemicals/HAZMAT on Tinker AFB. All chemicals/HAZMAT must be approved prior to being transported on base for use by any contractor. The contractor shall prepare and submit to the COR, ten (10) calendar days after contract award date, one (1) each, Chemical/Hazardous Material Request Authorization Form (Air Force Form 3952) and MSDS for each chemical, materials and substance proposed to be used in performance of this PWS. The COR shall forward the completed AF Form 3952s and MSDS to 72 ABW/CEAN for approval. The contractor shall not transport or use any chemical, material or substance on Tinker AFB before written approval is provided by 72 ABW/CEAN. Contractor shall maintain copies of MSDSs for all chemicals. The MSDSs must correspond with the manufacturers of the chemicals on hand. Manufacturer, material, and MSDS must match. NOTE: MSDS refers to manufacturer MSDS.

Once material is approved for use, contractor shall contact base EM (72 ABW/CEAN) and provide a list of all material. 72 ABW/CEAN shall determine any additional material requirements based on the hazard code of the material.

1.10.1. Hazardous Waste: Contractor not occupying space on base: Contractor shall dispose of any spent/processed chemical solutions and used rags in waste drums located in the shop/area the work is being performed in.

1.10.1.1. Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be done in accordance with Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEAN. The contractor shall maintain records of written authorization issued by 72 ABW/CEAN for discharges into IWTP and sanitary sewer.

1.10.1.2. For discharges outside of Tinker AFB, the contractor shall ensure waste water discharges, that may contain RCRA regulated metals resulting from any contracted service, go to a state/federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW).

1.10.1.3. Spills: Upon occurrence of any spills that could enter the storm system or cause any harmful environment effects, the contractor shall immediately call 911 to report the incident. When possible, the contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, request Tinker AFB 911. The contractor shall report all environmental violations to the COR. The contractor shall submit a typed or written report about the incident within four (4) clock hours. The contractor shall provide five (5) copies of the written report. The contractor shall provide one copy to the CO, two copies to the COR, a copy for Unit Environment Coordinator (UEC) and a copy for record. The format of the report shall be left up to the contractor, but the report shall contain the following information.

1.) Name and contact number of person reporting the spill

2.) Date and time of incident

3.) Location and source of spill

4.) Substance or pollutant spilled

5.) Amount spilled and rate of discharge

6.) Any damages or injuries involved

7.) Extent of area impacted

8.) Potential hazards

9.) Actions taken

10.) Organizations contacted

11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.10.1.4. Environmental and Safety Training: The contractor personnel shall have Resource Conservation Recovery Act (RCRA) environmental and safety training required by the state and federal government. The training shall be IAW the following regulations: Resource Conservation Recovery Act (RCRA) 40 Code of Federal Regulation (CFR) 265.16 “Personal Training”, Occupational Safety and Health Administration (OSHA) Hazardous Waste Operations and Emergency Response Standard Title 29, CFR Part 1910.120 “Hazardous Waste Operations and Emergency Reponses” 40 CFR Part 63.741-40 CFR 63.753, Subpart GG- National Emission Standards for Aerospace Manufacturing and Rework Facilities, Oklahoma City Air Logistics Center Tinker Air Force Base Instruction (OC-ALC TAFB) 32-7004, Hazardous Waste Management Instruction, Section 13, and Air Force Instruction (AFI) 32-7042, “Solid and Hazardous Waste Compliance”, Section 2, 76 MXW OI 32-7 “Hazardous Material Management Program” (In its entirety), 76 MXW OI 32-101 “Air Quality Record Keeping Procedure” (In its entirety) & 76 MXW OI 32-7004 “Hazardous Waste Management Program” (In its entirety) . The contractor shall provide the environmental and safety training certificate for all employees to the CO and COR, within ten (10) calendar days after contract award date.

1.11. Housekeeping: The contractor shall keep the work areas clean and neat in accordance with Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS. Foreign Object Damage (FOD) and Dropped Object Prevention (DOP): Contractor personnel who, in performance of their assigned duties on this contract, work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers and the contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps and in aircraft hangers and maintenance areas are required to receive FOD and DOP training and to comply with Air Force Instruction (AFI) 21-101, Air Force Materiel Command (AFCM) Sup1, Chapter 14, paragraph 14.41 and Tinker AFBI 21-449 (in its entirety). The contractor shall contact CORas the FOD POC to obtain the FOD Training information.

1.12. Certificate for Foreign Object Damage (FOD) and Dropped Object Prevention (DOP) Certificate: The contractor and personnel shall acknowledge the Foreign Object Damage (FOD) and Dropped Object Prevention (DOP) training by viewing the DVD and providing a contractor devised certificate to the (COR) for each employee within ten (10) days of contract award. The certificate(s) shall have the title of the training, name of the person who received the training and the date. The contractor shall also ensure that all new employee(s) view the FOD/DOP Training DVD and provide a contractor devised certificate of training to the COR prior to starting work in the 76 MXW shops. Annually, the contractor and personnel shall be required to review the FOD/DOP Training DVD and provide an updated contractor devised certificate of training to the COR.

1.13. Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops including Ramp areas, the contractor shall comply with AFI 21-101_ AFMC Sup 1, 21-101, Chapter 10 (all paragraphs). The contractor or contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (i.e. tool or job box, or tool bag). The COR will report to appropriate government personnel of any missing contractor’s tool(s) not located within one hour after notification of lost or missing tools.

1.14. Housekeeping/FOD/Tool Control Briefing: The contractor manager shall ensure each employee on the job site is briefed on Housekeeping, FOD and Tool Control prior to starting work in 76 MXW Industrial Areas. Acknowledgment of “Housekeeping/Tool Control Briefing for the Contractor Employee”: Each contractor’s employee on the job site shall acknowledge receipt of the “Housekeeping/Tool Control Briefing for Contractor’s Employees” by reviewing, signing, dating and returning the MXRIWRS Form 032 to the COR prior to start of work in 76 MXW Industrial Areas.

1.15. Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB OK per AFI 31-204 (in its entirety), Motor Vehicle Traffic supervision. The contractor shall comply with TAFBI 24-301 (in its entirety) for the operation of POVs within B3001.

1.16. Visitors Pass: The contractor shall make contact with the COR Seven (7) days before coming on TAFB to make arrangements for a Visitors Pass(s). The COR will assign the contractor a Sponsor within the organization. The contractor and the sponsor will arrange to meet at BLDG 6611/Air Depot Gate. The Contractor shall provide two forms of identification (one of which shall be a picture ID) to Security Forces. Security Forces will provide the contractor the AF Form 75 (Visitors Pass) that will be valid for 30 days. If an addition 30 days is required the same process will occur.

1.17. Foreign National(s): The contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a US Government facility.

1.18. Health and Safety on Government Installations: In performing work under this contract on a Government installation, the contractor shall comply with federal, state and local regulations regarding occupational safety and health and the specific health and safety requirements established by this contract and Appendix C. The contractor shall notify the COR of any injuries that occur to contractor personnel while on the installation. The contractor shall notify the COR of damage to government property or equipment during the execution of the contract.

1.19. Emergency Procedures: Contractor employees shall follow the direction of Government employees in regards to emergency procedures, i.e. fire, tornado, active shooter, bomb threats. It is the responsibility of the contractor to provide guidance and establish procedures for responding to emergency for their employees. It is the contractors' responsibility to account for their employees following an emergency evacuation. Contractor Personnel shall participate with government personnel in all fire and tornado drills and no additional cost to the Government.

Section 2

Performance Assessment

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following service summary requirements are accomplished:

2. SERVICE SUMMARY.

SS
PERFORMANCE OBJECTIVE
PWS

PARA

PERFORMANCE THRESHOLD

1
Did the contractor check the drums under filtration systems/collectors weekly to determine the fullness of each drum?

1.2.1.1.

100% Compliance

2
Did the contractor vacuum the area around the dust collection drums including the hopper section of the collector?

1.2.1.3.

100% Compliance

3
Did the contractor rotate drums between different dust collector systems?
1.2.1.3.2.
100% Compliance
4
Did the contractor place drums on pallets?

1.2.1.4.

100% Compliance

5
Did the contractor air blast all thermal spray equipment, walls, and floor and vacuum the inside floor area of booth?

1.2.1.5.

100% Compliance

6
Did the contractor peel/wipe, vacuum, and clean the exterior surface of the galvanized steel exhaust hood and all wall panels?

1.2.1.6.

100% Compliance

7
Did the contractor collect and place all residue and generated waste into government provided drums?
1.2.4.
100% Compliance
8
Did the contractor document the Maintenance Log Book? Were the logs provided to the COR within five working days after the end of the month?

1.2.1.7.

1.2.1.7.1.

100% Compliance

9
Did the contractor clean the entire floor area of the plasma spray and blast areas? Did the contractor vacuum and scrub and remove all residue?
1.2.2.1.
100% Compliance
10
Did the contractor clean the entire floor area of the plasma spray shop mezzanine areas to remove all grit blast media/residue and plasma spray residue on the floor?
1.2.2.2
100% Compliance
11
Did the contractor paint entire surface area of the galvanized exhaust hood with environmentally safe, peel coat paint? Did the contractor strip coating from entire area that requires repainting first? Was new coat applied thick enough to facilitate removal by stripping rather than scraping off?

1.2.3.1.

1.2.3.1.1.

100% Compliance

12
Did the contractor paint the wall panels next to the exhaust hood with non-reflective black peel coat paint?
1.2.3.2.
100% Compliance
13
Did the contractor vacuum inside interior floor area of the galvanized steel exhaust hood?
1.2.3.3.
100% Compliance
14
Did the contractor collect and place all residue and generated waste into government provided drums?
1.2.4.
100% Compliance
15
Did the contractor document the Monthly Drum Usage Log and Maintenance Log? Were the logs provided to the COR within five working days after the end of the month?

1.2.2.3.

1.2.2.3.1.

1.2.1.7.

1.2.1.7.1.

1.2.3.4.

1.2.3.4.1.

100% Compliance

3. GOVERNMENT FURNISHED PROPERTY And SERVICES

3.1. Government Furnished Property is not applicable to the performance of this contract in accordance with FAR Parts 45 and 52.245 plus supplements.

3.2. Shared Property of the Government (As Is Condition). In accordance with (IAW) Government procedures, the Contractor is authorized to share Property of the Government, without cost, with Government personnel at Tinker AFB OK for the duration of this contract and only as needed for the performance of this contract. The Government retains title to all Shared Property of the Government, until the Government properly disposes of this property as authorized by law and regulation. The Government will maintain accountability (property records) for Government reporting requirements.

The Contractor shall conform to the provisions of Air Force Instruction (AFI) 31-101 (Entirety), The Air Force Installation Security Program and Tinker Instruction (TI) 31-101(Entirety), Installation Security Program, for all Shared Property of the Government. The Contractor shall ensure this property is secured at the close of each workday.

This Shared Property of the Government is not considered Government Furnished Property (GFP) requiring property administration IAW FAR Parts 45 and 52.245 plus supplements. However, this Shared Property of the Government will be administered IAW the provisions of this PWS and FAR 52.237-2, Protection of Government Buildings, Equipment, And Vegetation. The Contractor shall comply with the contract terms and conditions and this PWS.

3.2.1. Shared Building Space. Shared Property of the Government includes Building Space the Contractor will be allowed to use to perform only the contract requirements in accordance with Government procedures. Shared Building Space includes Building (Bldg.) 3001, Post I-73 and Building (Bldg.) 3221, Post G-3.

3.2.1.1. The Government will provide a location at a specific “satellite collection” point for the Contractor to place full drums (see paragraph 1.2.1.1.). Only the drums considered “full” shall be stored at the collection point.

3.2.1.2. The Government will provide a secure location for storage of HEPA vacuum.

3.2.2. Shared Equipment/Materials. Shared Property of the Government includes Equipment/Materials the Contractor will be allowed to use to perform only the contract requirements in accordance with Government procedures. Shared Equipment/Materials includes: 55-gallon drums and pallets.

3.2.2.1. The Government will provide 55-gallon drums as needed for replacement of full drums under each dust collector.

3.2.2.2. The Government will provide 55-gallon drums as needed for placement of residue and generated waste.

3.2.2.3. The Government will provide pallets for drum storage at the collection point.

3.2.3. Shared Office Supplies. Shared Property of the Government includes the Maintenance Log Book and Labels for the 55-gallon drums.

3.2.4. Modifications. Prior to the Contractor performing any Modifications to Shared Property of the Government, at the Contractor’s expense, the Contractor shall submit written requests for modifications to the Government COR and Contracting Officer. Approval of modifications shall be in accordance with Government procedures.

3.2.5. Title. The Government retains title to all Shared Property of the Government, even if the Contractor’s modifies the Shared Property of Government at the Contractor’s expense.

3.2.6. Return to Government. During the contract, contract completion, and/or termination, the Contractor shall return all Shared Property of the Government to the Government COR.

3.3. Government Furnished Services are applicable to this requirement at Tinker AFB OK.

3.3.1. The Government will be responsible for pickup and disposal of all full drums, palletized and stored at the collection point.

3.3.2. The Government will ensure that the Maintenance Logbook is available in the general vicinity of Bldg. 3001, Post H-73 and easily accessible by Contractor personnel.

3.3.3. Security Forces. The Government will provide general on base Security Forces service. The Security Forces’ telephone number is 911 for emergencies, 734-2000 for crime in progress and 734-3737 for non-emergency calls.

3.3.4. Fire and Emergency Services. The Government will provide general on-base fire protection services. The contractor shall comply with fire prevention rules and regulations enforced by the Tinker AFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 734-3981. For routine calls to dispatch, call 734-7964.

3.3.5. Emergency Medical Services. The Government will provide 24 hour on-base state certified paramedic level emergency response and patient transport services for contractor personnel who are injured or become seriously ill while on TAFB. The telephone number is 911 for Emergencies.

Note: Calling 911 from a cell phone will be received by Off-Base Emergency 911 Systems, causing a delay in response time by emergency personnel. When possible, use a base Telephone to receive on-base help.

3.3.6. Utilities. The Government will furnish utility services. These utilities include compressed air, natural gas, electricity, water and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.3.7. Refuse collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract for Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use the Government dumpsters for collection of construction debris.

3.3.8. Workspace. The Government will provide adequate workspace around the equipment area.

APPENDIX A

PLASMA SPRAY BOOTHS

NO
DESCRIPTION
OC #
LOC
MFG
Comments
1
Booth #1 Enclosure
14603
B3001/I-71
Air Cleaning Tech.
2
Booth #2 Enclosure
14898
B3001/I-71
Air Cleaning Tech.
3
Booth #3 Enclosure
14604
B3001/I-71
Air Cleaning Tech.
4
Booth #4 Enclosure
14605
B3001/I-71
Air Cleaning Tech.
5
Booth #5 Enclosure
14606
B3001/I-71
Air Cleaning Tech.
6
Booth #6 Enclosure
14899
B3001/I-71
Air Cleaning Tech.
7
Booth #7 Enclosure
14900
B3001/I-71
Air Cleaning Tech.
8
Booth #8 Enclosure
14607
B3001/G-72
Air Cleaning Tech.
9
Booth #9 Enclosure
14609
B3001/G-72
Air Cleaning Tech
10
Booth #10 Enclosure
14608
B3001/I-71
Air Cleaning Tech.
11
Booth #11 Enclosure
14901
B3001/I-71
Air Cleaning Tech.
12
Booth #12 Enclosure
14905
B3001/I-71
Air Cleaning Tech.
13
Booth #13 Enclosure
19289
B3001/H-71
Sulzer Metco
14
Booth #14 Enclosure
14756
B3001/K-10
Swanda Brothers
15
Booth #15 Enclosure
19202
B3001/H-71
Sulzer Metco
16
Booth #16 Enclosure
19292
B3001/G-72
Sulzer Metco
17
Booth #17 Enclosure
15711
B3001/K10
Swanda Brothers
18
Booth #18 Enclosure
19343
B3001/H-71
Sulzer Metco
19
Booth #19 Enclosure
19340
B3001/H-71
Sulzer Metco
20
Booth #20 Enclosure
14906
B3221/J2

SE Corner Progressive Technology

21
Booth #21 Enclosure
14907
B3221/K1 Corner Post
Progressive Technology
22
Booth #22 Enclosure
19238
B3221/ M4 Column

Sulzer Metco

23
Booth #23 Enclosure
14610
B3221/ M4 Column
Swanda Brothers
24
Booth #24 Enclosure
N/A
B3001/H73
METTECH TECHNOLOGIES
25
Booth #25 Enclosure
N/A
B3001/H-74
PRAXAIR
26
Booth #26 Enclosure
20040
B3221/J-5
Sulzer Metco
27
Booth #27 Enclosure
20039
B3221/J-5
Sulzer Metco
28
Automated Grit Blaster Enclosure
12925
B3001/H71
Progressive Technology

APPENDIX B

EQUIPMENT LIST

PLASMA SPRAY BOOTH & GRIT BLAST DUST COLLECTORS

NO
DESCRIPTION
OC #
LOC.
MFG.
BARRELS
COMMENTS
1
Booth #1 Collector
12336
B3001/I-71
Torit
3
2
Booth #2 Collector
12330
B3001/I-71
Torit
3
3
Booth #3 Collector
12335
B3001/I-71
Torit
3
4
Booth #4 Collector
12333
B3001/I-71
Torit
3
5
Booth #5 Collector
12331
B3001/I-71
Torit
3
6
Booth #6 Collector
12334
B3001/I-71
Torit
3
7
Booth #7 Collector
12332
B3001/I-71
Torit
3
8
Booth #8 Collector
12325
B3001/G-72
Torit
3
9
Booth #9 Collector
12326
B3001/G-72
Torit
3
10
Booth #10 Collector
12327
B3001/I-71
Torit
1
11
Booth #11 Collector
12328
B3001/I-71
Torit
1
12
Booth #12 Collector
12329
B3001/I-71
Torit
3
13
Booth #13 Collector
12384
B3001/K-11

HT Annex

Torit
1
14
Booth #14 Collector
12383
B3001/K-10

HT Annex

Torit
1
15
Booth #15 Collector
12925
B3001/L-11

HT Annex

Torit
4
16
Booth #16 Collector
13049
B3001/H-73
Torit
1
17
Booth #17 Collector
15711
B3001/K-10

HT Annex

Torit
1
18
Booth #18 Collector
15711
B3001/K-10

HT Annex

Torit
1
19
Booth #19 Collector
15711
B3001/K-10

HT Annex

Torit
1
20
Booth #20 Collector
14917
B3221, SE Corner Outside
Torit
3
21
Booth #21 Collector
14917
B3221, SE Corner Outside
Torit
3
22
Booth #22 Collector
7809
B3221, SE Corner Outside
Torit
1
23
Booth #23 Collector
7810
B3221, SE Corner Outside
Torit
1
24
Booth #24 Collector
13247
B3001/K-11
Progressive Tech.
1
25
Booth #25 Collector
N/A
B3001/H74
Praxair
1
26
Booth # 26 Collector
N/A
B3221, SE Corner Outside
Torit
2
27
Booth #27 Collector
B3221, SE Corner Outside
Torit
2

PAGE

Other files

File Type Posted
MSDS_Paint.pdf PDF
PLASMA AMEND SOL.doc DOC document
WADE DET.pdf PDF
Plasma Appendix A and B Final New.doc DOC document
PWS - Plasma Booth Annual 09-15-11 —
APPENDIXC PLASMA 11-80.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .