PERFORMANCE WORK STATEMENT (PWS)
FOR
PREVENTIVE & REMEDIAL MAINTENANCE
MIRA-X LARGE CHAMBER SCANNING ELECTRON
MICROSCOPE (LC-SEM)
PREPARED BY:
76 MXW/OBWK
Jan 2010
| 1. |
| DESCRIPTION OF SERVICES. |
1.1. Scope. The contractor shall provide all labor, tools, equipment, test equipment personal protective equipment and clothing, hearing protection, eye protection including prescription safety glasses, materials and parts, transportation and other incidentals necessary to travel to Tinker AFB, OK, to perform Preventive Maintenance (PM) and Remedial Maintenance (RM) on MIRA-X LARGE Chamber Scanning Electron Microscope (LC-SEM). The contractor shall be responsible for insuring all services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). Equipment is listed in Appendix A.
1.2. Preventive Maintenance (PM). The objective of Preventive Maintenance (PM) is to protect the equipment capability and investment by removing causes of failure and making adjustments to compensate for normal wear before failures occur.
| 1.2.1. |
| Pre-Preventive Maintenance (PM) Requirements. |
1.2.1.1. The contractor, using applicable manufacturer’s specifications and industry standard practices, this Performance Work Statement (PWS) shall develop, concurrent with contractor’s quote, preventive maintenance instructions in accordance with AFMC 21-127, Depot Maintenance Plant Management, paragraphs 2.3.1. through 2.3.1.3.3. and paragraphs 2.3.1.4. through 2.3.1.7.3.
1.2.1.2. The contractor shall provide, concurrent with the Contractor’s quote, Preventive Maintenance (PM) Instructions on AFMC Form 306, Preventive Maintenance (PM) Instructions.
| 1.2.2. |
| Preventive Maintenance (PM) Schedule. |
1.2.2.1. The contractor, based upon the Preventive Maintenance instructions per the completed AFMC Form 306, Preventive Maintenance instructions, shall develop and maintain a schedule to ensure all Preventive Maintenance (PM) tasks are scheduled and performed from onset of the contract period of performance.
1.2.2.1.1. The first PM shall be scheduled within 15 calendar days after award of contract and six (6) months thereafter.
1.2.2.2. The contractor shall notify the QAE or a 76 MXSS/MXDTAC Designated Representatives two (2) weeks prior to each scheduled PM visit.
1.2.2.3. The contractor, using the Preventive Maintenance (PM) Instructions submitted in paragraph 1.2.2.1., shall perform four (4) PM’s within (90) days apart on the MIRA-X LARGE Chamber Scanning Electron Microscope (LC-SEM) to maintain maximum, performance of the equipment in accordance with Original Equipment Manufacturer (OEM) specifications and PM Checklist.
| 1.2.4. |
| PM Documentation. |
1.2.4.1. After completion of any PM or RM action, the contractor shall document completed maintenance on AFTO Form 244/245, Industrial Support Equipment Record, in accordance with Technical Order 00-20-1, Chapter 4 and 7, AFMCI 21-127, paragraph 2.6. and 76 MXWOI 21-203, Chapter 1.’’
Note: The AFTO Form 244/245 card can be found on the equipment, in the near proximity, or may be obtained from the Quality Assurance Evaluator (QAE) or a 76 MXSS/MXDTAC Designated Representatives. The annotated form shall remain with the equipment.
1.2.4.2. Repair documentation.
1.2.4.3. At the completion of the service or repair action, the contractor shall annotate the AFTO 244/245 card, if affixed, in accordance with Technical Order 00-20-1, Chapter 7 and AFMCI 21-127, paragraphs 7.11.6.10, 7.11.611. and 7.11.6.12. The annotated form shall remain with the equipment.
1.3 Remedial Maintenance (RM).
1.3.1. Malfunction and Notification Process.
1.3.1.1. Upon discovery of equipment malfunction, the QAE or a 76 MXSS/MXDTAC Designated Representatives shall request troubleshooting assistance by email; Klein@visitec-em.de, Klein@voagroup.com or placing a telephone call, (865) 824-2817 to the designated contractor point of contact (POC).
1.3.1.2. The QAE or a 76 MXSS/MXDTAC Designated Representatives will provide a brief description of the malfunction and the name and telephone number of the equipment technical contact.
1.3.1.3. The contractor shall respond to the QAE or a 76 MXSS/MXDTAC Designated Representatives request for assistance within twenty four (24) work hours after notification of a malfunction by contacting the equipment technical contract and troubleshooting via telephone communications.
1.3.1.3.1. The contractor, if after 24 clock hours of troubleshooting over the telephone cannot resolve the problem; shall notify the QAE or a 76 MXSS/MXDTAC Designated Representatives that a site visit is required.
1.3.1.3.2. The contractor shall travel to Tinker AFB, OK, arriving no later than 7 Calendar days after discontinuance of troubleshooting efforts.
1.3.1.3.3. The contractor, upon arrival, shall inspect the equipment/system as necessary to determine the cause of the malfunction.
1.3.1.3.4. The contractor shall prepare a written repair estimate using MXRIWRS Form 011, Repair Estimate worksheet or a contractor devised format.
1.3.1.3.5. The contractor shall submit the Repair Estimate worksheet, MXRIWRS Form 011 or a contractor devised format, to the (QAE) on a best effort basis but no later than four (4) clock hours after completion of the inspection.
1.3.1.3.5.1. The QAE will review the Repair Report and verify that sufficient funds are available to cover the cost of the repairs, permission will then be given to repair the equipment in accordance with the terms and conditions outlined herein and conform to the equipment specifications published by the manufacturer.
1.4. Parts and Materials.
1.4.1. The contractor shall provide and use only new parts and material from the Original Equipment Manufacturer (OEM) in performance of this PWS unless authorized by the CO who will seek guidance from QAE.
1.4.2. The following parts are not covered by the Contractor
· Turbo pump #78501843
· Turbo pump #78501850
· Rootspump #21191473
· Rootspump #21192159
· E-gun #1430VP-06-64
1.5. Completion of the Service/Repair
1.5.1. The contractor, upon completion of the repair services, shall demonstrate to the on-site Government technical POC that all aspects of the system are repaired and are properly functioning in accordance with manufacturer’s specifications, industry standards and this PWS.
1.5.2. Repair documentation.
1.5.2.1. At the completion of the service or repair action, the contractor shall annotate the AFTO 244/245 card, if affixed, in accordance with Technical Order 00-20-1, Chapter 7 and AFMCI 21-127, paragraphs 7.11.6.10, 7.11.611. and 7.11.6.12. The annotated form shall remain with the equipment.
1.5.3. Red “X” Documentation Symbol.
1.5.3.1. A Red “X” indicates that the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected or the symbol cleared. No one shall authorize or direct equipment to be used until the Red “X” has been properly cleared in accordance with applicable technical data and TO 00-20-1, Chapter 4.
1.5.4. Red “X” Special Certification Roster.
1.5.4.1. The contractor shall provide to the QAE or a 76 MXSS/MXDTAC Designated Representatives by contract start date, a list of personnel who are authorized to certify that the equipment is safe for use in accordance with T.O. 00-20-1, paragraph 1.3.2.
1.6. Service Report.
1.6.1. The contractor, upon completion of the contact service call, shall provide a legibly written service report to the QAE or a 76 MXSS/MXDTAC Designated Representatives.
1.6.1.1. The service report shall contain the following minimum information: Name of company, service date, time of arrival, description of service performed, additional service needed (if any), time of departure, legible name and signature of technician performing the services, completion date of services, signature of on-site government technical POC.
1.7. Security Requirements/Identification Badges.
1.7.1 The contractor shall provide the name(s) of all contractor personnel requiring en-try authorization to Tinker AFB, OK, for performance of services associated with this requirement.
1.7.1.1. The contractor and/or his/her personnel shall have a valid driver’s license and car insurance verification.
1.7.1.2. The following information is necessary to coordinate entry to the base.
Company Name
Technician Full Name
Cell phone number or pager (optional)
Estimated date and time of arrival Length of visit
1.7.1.3. The contractor shall contact the QAE for directions to the base if unknown. After arriving at the Eaker Gate (off of I-40) parking area, the contractor shall telephone the QAE for further instructions to be escorted onto the base.
1.7.1.4. Foreign National(s).
1.7.1.4.1. The contractor shall notify the QAE before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a US Government facility.
1.8. Availability of Equipment.
1.8.1. Equipment shall be available for scheduled services Monday through Friday, 7:00 a.m. until 3:00 p.m., excluding Federal Holidays, unless otherwise directed by the Administrative Contracting Officer (CO).
1.9. Acknowledgement of “Housekeeping/FOD/Tool Control Briefing for Contractor Employee(s)”.
1.9.1. The contractor and personnel shall acknowledge receipt of the “Housekeeping/FOD/Tool Control Briefing Employee(s)’ by reviewing, signing, dating and returning MXRIWRS Form 032 to the Primary QAE or Alternate QAE prior to starting work in 76 MXW Shops.
1.9.2. The contractor shall ensure that each new employee receives and signs the “Housekeeping/FOD/Tool Control Briefing for Contractor Employees” before starting work in 76 MXW Shops.
1.10. Foreign Object Damage (FOD) and Dropped Object Prevention (DOP).
1.10.1. Contractor personnel who, in performance of their assigned duties on this contract, work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers and the contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps and in aircraft hangers and maintenance areas are required to receive FOD and DOP training and to comply with Air Force Instruction (AFI) 21-101, Air Force Materiel Command (AFCM) Sup1, Chapter 14, paragraph 14.41 and Tinker AFB Instruction (TAFBI) 21-449 (in its entirety).
1.10.2. The contractor and personnel can request a copy of the FOD Training and Prevention DVD at email OC-ALC/FOD/DOP@tinker.af.mil.
1.11. Foreign Object Damage (FOD) and Dropped Object Prevention (DOP) Certificate.
1.11.1. The contractor and personnel shall acknowledge the FOD and DOP by viewing a training DVD and providing a contractor devised certificate of training to the QAE for each employee within five (5) days of contract award.
1.11.1.1. The certificates shall have the title of the training, name of the person who received the training and the date.
1.11.2. The contractor shall also ensure that each new employee view the FOD/
DOP Training DVD and provides a contractor devised certificate of training to the QAE prior to starting work in the 76 MXW shops.
1.11.3. Annually, the contractor and personnel shall be required to review the FOD/DOP Training DVD and provide an updated contractor devised certificate of training to the QAE.
1.12. Applicable Laws.
1.12.1. The contractor, in the event that applicable laws or regulations change during the terms of this contract, shall be required to comply as laws come into effect.
1.13. Safety.
1.13.1. The contractor shall also comply with all safety practices posted in the assigned work area and the attached Appendix C, provided by the Safety Office.
1.14. Housekeeping.
1.14.1. The contractor shall keep the work areas clean and neat in accordance with (IAW) industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.
1.15. Tool Control.
1.15.1. The contractor, while performing contract services in or around Maintenance Production Shops, shall comply with AFI 21-101 and AFMCI Sup 21-101, Chapter 10.
1.15.1.1. The minimum requirements are as follows:
1.15.2. All tools brought into the 76 MXW Wing areas by a contractor shall be secured in a container or bag.
1.15.3. The contractor shall identify each tool and list it separately on a contractor devised “tool listing” kept inside each container or bag.
1.15.4. The contractor and/or contractor’s personnel shall make the contractor devised “tool listing” available to government personnel when requested.
1.15.5. The contractor and/or contractor’s personnel shall ensure all tools are secured when not in use.
1.15.6. The contractor and/or contractor’s personnel shall ensure that no tools are left unattended at any time.
1.15.7. The contractor and/or contractor’s personnel shall inventory the container or bag of tools at the beginning of each day.
1.15.8. The contractor and/or contractor’s personnel shall inventory the container or bag of tools at the end of each day.
1.15.9. The contractor and/or contractor’s personnel shall immediately notify the QAE of any tool(s) that are missing.
1.15.10. Tool(s) not located within one hour after notification will be reported by the QAE to the appropriate government personnel.
1.16. Forms and Publications, Technical Orders (TO), Air Force Instructions (AFI) and Air Force Material Command Instruction (AFMCI).
1.16.1. The contractor shall obtain the forms and publications. T.O.’s, AFI’s, AFMCI’s and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil.
1.16.1.1. In the event that a form or publication is not available on-line, the QAE will provide the form, instruction, publication to the contractor upon writ-ten request (e-mail is acceptable).
1.17. Affirmative Procurement.
1.17.1. Affirmative Procurement has been determined not to be applicable to this PWS.
1.18. Government Acceptance.
1.18.1. Designated QAE will accomplish inspection and acceptance of services per-formed based on requirements of the PWS, the contract, the ‘Inspection Clause’ and the Quality Assurance Surveillance Plan (QASP).
2. SERVICE SUMMARY.
| SS |
| PERFORMANCE |
OBJECTIVE
PWS
PARAGRAPH
PERFORMANCE
THRESHOLD
SS 1
| The contractor shall provide, concurrent with the Contractor’s quote, Preventive Maintenance (PM) Instructions on AFMC Form 306, Preventive Maintenance (PM) Instructions. |
| 1.2.1.2. |
| 100% Compliance |
SS 2
| The contractor, based upon the Preventive Maintenance instructions per the completed AFMC Form 306, Preventive Maintenance instructions, develop and maintain a schedule to ensure all Preventive Maintenance (PM) tasks are scheduled and performed from onset of the contract period of performance. |
| 1.2.2.1. |
| 100% Compliance |
SS 3
| The contractor, using the Preventive Maintenance (PM) Instructions submitted in paragraph 1.2.2.1., shall perform four (4) PM’s within (90) days apart on the MIRA-X LARGE Chamber Scanning Electron Microscope (LC-SEM) to maintain maximum, performance of the equipment in accordance with Original Equipment Manufacturer (OEM) specifications and PM Checklist. |
| 1.2.2.3. |
| 100% Compliance |
SS 4
| The contractor shall document completed maintenance on AFTO Form 244/245, Industrial Support Equipment Record, in accordance with Technical Order 00-20-1, Chapter 4 and 7, AFMCI 21-127, paragraph 2.6. and 76 MXWOI 21-203, Chapter 1.’’ |
| 1.2.4.1. |
| 100% Compliance |
SS 5
The contractor respond to the Quality
Assurance Evaluator (QAE) request for assistance within twenty four (24) work hours after notification of a malfunction by contacting the equipment technical contact and troubleshooting via telephone communications.
1.3.1.3.
100% Compliance
SS 6
| The contractor, if after 24 clock hours of troubleshooting over the telephone cannot resolve the problem; shall notify the QAE that a site visit is required. |
| 1.3.1.3.1. |
| 100% Compliance |
SS 7
The contractor, upon arrival, shall inspect the equipment/system as necessary to determine the cause of the malfunction.
| 1.3.1.3.3. |
| 100% Compliance |
SS 8
The contractor shall prepare a written repair estimate using MXRIWRS Form 011, Repair
Estimate worksheet or a contractor devised
Format.
| 1.3.1.3.4. |
| 100% Compliance |
SS 9
The contractor shall submit the Repair Estimate worksheet, MXRIWRS Form 011 or a contractor devised format, to the (QAE) on a best effort basis but no later than four (4) clock hours after Completion of the Inspection.
| 1.3.1.3.5. |
| 100% Compliance |
| SS 10 |
| The contractor shall provide and use only new parts and material from the Original Equipment Manufacturer (OEM) in performance of this PWS unless authorized by the CO who will seek guidance from QAE. |
| 1.4.1. |
| 100% Compliance |
SS 11
The contractor, upon completion of the repair services, shall demonstrate to the on-site Government technical POC that all aspects of the system are repaired and are properly functioning in accordance with manufacturer’s specifications, industry standards and this PWS.
| 1.5.1. |
| 100% Compliance |
SS 12
At the completion of the service or repair action, the contractor shall annotate the AFTO 244/245 card, if affixed, in accordance with Technical Order 00-20-1, Chapter 7 and AFMCI 21-127, paragraphs 7.11.6.10, 7.11.611. and 7.11.6.12. The annotated form shall remain with the equipment.
1.5.2.1.
100% Compliance
SS 13
The contractor shall provide to the QAE by contract start date, a list of personnel who are authorized to certify that the equipment is safe for use in accordance with T.O. 00-20-1, paragraph 1.3.2.
| 1.5.4.1 |
| 100% Compliance |
| SS 14 |
| The contractor, upon completion of the contact service call, shall provide a legibly written service report to the QAE. |
| 1.6.1 |
| 100% Compliance |
| SS 15 |
| The contractor and personnel shall acknowledge receipt of the “Housekeeping/FOD/Tool Control Briefing Employee(s)’ by reviewing, signing, dating and returning MXRIWRS Form 032 to the Primary QAE or Alternate QAE prior to starting work in 76 MXW Shops. |
| 1.9.1. |
| 100% Compliance |
| SS 16 |
| The contractor and personnel shall acknowledge the FOD and DOP by viewing a training DVD and providing a contractor devised certificate of training to the QAE for each employee within five (5) days of contract award. |
| 1.11.1. |
| 100% Compliance |
3. PREVENTIVE AND REMEDIAL MAINTENANCE on PROPERTY OF THE GOVERNMENT.
3.1. Government Furnished Property and Services.
3.1.1. Government Furnished Property is not applicable to the performance of this contract.
3.2. Government Furnished Services are applicable services, to this requirement.
3.3. Workspace.
3.3.1. The government will provide adequate workspace around the machine areas.
3.4. Security Forces.
3.4.1. The government will provide general on base security forces service. The Security Forces’ telephone number is 911 for emergencies, 734-2000 for crime in progress, and 734-3737 for non-emergency calls.
3.5. Fire and Emergency Services.
3.5.1 The government will provide general on base fire protection services. The contractor shall comply with fire prevention rules and regulations enforced by the Tinker AFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 734-3981. For routine calls to dispatch call 734-7964.
3.6. Emergency Medical Services.
3.6.1. The government will provide 24 hour on-base state certified paramedic level emergency response and patient transport services for contractor personnel who are injured or become seriously ill while on Tinker AFB. Medical. The telephone number is 911 for emergencies. The contractor shall be responsible for any associated costs.
Note: Calling 911 from a cell phone will be received by Off Base Emergency 911 Systems, causing a delay in response time by emergency personnel. When possible use a base telephone to receive on base help.
3.7. Utilities
3.7.1. The government will furnish utility services. These utilities include natural gas, electricity, water and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.
3.8. Refuse Collection.
3.8.1. The government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract for government provided facilities. The government will only allow non-hazardous refuse to be emptied into the authorized refuse dumpster for trash collection. Do not use the government dumpsters for collection of construction debris generated by this contract.
APPENDIX A
EQUIPMENT LIST
FOR
MIRA-X LARGE CHAMBER SCANNING ELECTRON
MICROSCOPE (LC-SEM)
F3YCEB0007-AQ01
| DESCRIPTION |
| MODEL # |
| SERIAL# |
| MANUF# |
| LOCATION |
Large Chamber Scanning
Electron
Microscope (LC-SEM)
| MIRA |
| X |
| Visitec |
| Metallurgical Analysis Section |
Bldg 3001, Post L-69
CONTACT LIST EMAIL ADDRESS
Rosalyn Marshall, Quality Assurance Evaluator (QAE)
(405) 736-7694 rosalyn.marshall@tinker.af.mil
Scott Roswurm, Section Chief/Senior Materials Engineer
(405) 736-2615
Cell# (405) 409-5832 scott.roswurm@tinker.af.mil
Karl Koch, Materials Engineer/MIRA Principal Engineer
(405) 734-6495
Cell# (405) 370-7648 karl.kock@tinker.af.mil
Judith Freer, Materials Engineering Technician/MIRA Principal Technician
(405) 734-6502 judith.freer@tinker.af.mil
REPAIR ESTIMATE WORK SHEET
| Equipment Identification: |
| Date of Evaluation: |
| Name of Company: |
| Contract No: |
Description of Evaluation Findings (malfunction information):
Repair Information
| Part Number Required, Item Description |
| Qty |
| Unit Cost |
| Total Unit |
Cost
Total Cost of ALL Parts
| Estimated Labor Hours to Repair: |
| Cost Per Hour IAW contract: |
| Total Labor |
to Repair:
Other Associated Costs itemized IAW contract:
Total Cost to Repair:
Performance Dates:
| Name and Signature of Authorized Contractor Representative |
| Current Date |
Government QAE
I agree the price quoted, above to complete system repairs are in compliance with Contract
I also confirm that sufficient funds are available on Contract
| QAE Signature |
| Date Processed to Contractor (faxed or e-mailed) |
MXRIWRS FORM 011 (January 2006)
PAGE
Other files
| File | Type | Posted |
|---|---|---|
| SAFETY APPENDIX.doc | DOC document | |
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .