FA8125-09-Q-0361-0001.pdf
PDF 18 KB Posted
- Attached to
- Equipment for Cable Shop
- Solicitation number
- FA8125-09-Q-0361
About this file
Amendment to include general specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8125-09-Q-0361.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3YCFH9237A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
To add general description specif ications
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Nov-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8125-09-Q-0361
X 9B. DATED (SEE ITEM 11)
29-Sep-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Nov-2009
CODE
OC-ALC/PKEA
LEIGH ANN NUNN/405-739-4286
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
FA8125 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8125-09-Q-0361
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Oct-2009 12:00 PM to 15-Nov-2000 04:00 PM.
The Issued By organization has changed from
OC-ALC/PKEA
ALAN LEE/405-739-3515
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
to
OC-ALC/PKEA
LEIGH ANN NUNN/405-739-4286
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
The following have been added by full text:
GENERAL SPECIFICATIONS
SUBJECT: General Product Description
1. 16 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement of 120V
2. 24 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement of 120V
3. 32 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement of 120V
4. 36 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement of 120V
5. 48 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement of 120V
6. 64 Carrier Harness Braider to braid electrical wiring harnesses. Power requirement 120V
7. Two Spindle Semi-Automatic Winder for spooling material onto bobbins. Equipped with AC motor drive, Servo motor traverse, set variable winding pitch and traverse limits from operator panel. Constant spindle speed or constant linear speed. Wire break detector. Fault annunciation, CE compliance and approved. Power requirement
220Vac single phase
8. Twelve position static payoff for unwinding of soft copper and textile material. Must include modular design configuration to allow for custom fitting to customer needs. Technical Features:
Ridged reel support post
Plastic balloon guard with ceramic center eye
Hysterisis tension system for fine and accurate tension control
Technical Specifications
Unwinding Speed
Self-adjustable up to 1000 m/min
Ramp up-down
Min 5 sec.
Max reel size
DIN 250
Wire Type
Soft copper and plated coppers
Wire Sizes
32 to 44 AWG
Max full reel weight
25 Kg
FA8125-09-Q-0361
Frame
Single sided to customer requirements
Dimensions
300 x 300 mm per position
Motor
N/A
Net weight
N/A
Voltage
N/A
(End of Summary of Changes)
File details come from the government source that posted it. Updated .