Indonesia_Remanufacture_PWS-1_dd.docx
DOCX document 65 KB Posted
- Attached to
- Indonesian Air Force F100 Engine Remanufacture
- Solicitation number
- FA8124-13-R-0005
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8124-13-R-0005-0001_Final.pdf | ||
| FA8124-13-R-0005.pdf | ||
| GOVERNMENT_FURNISHED_PROPERTY_LIST.docx | DOCX document | |
| Safety_Spec.doc | DOC document | |
| CDRL_-_Status_Report.pdf | ||
| QASP.docx | DOCX document | |
| DID_DI-MISC-80915.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
For F100-PW-220/E Engine Remanufacture
FILE NUMBER: PR # FD2030-12-35821
REV. 0
DATE: September 26, 2012
PREPARING ORGANIZATION:
AFLCMC/LPS
TINKER AFB, OK 73145-3030
| TABLE OF CONTENTS | Page | ||
| SECTION I | 3 | ||
| 1.1 | DATA | 3 | |
| 1.2 | SECURITY | 4 | |
| 1.3 | QUALITY | 4 | |
| 1.4 | DELIVERY PERFORMANCE | 5 | |
| 1.5 | CONDEMNATION, REMANUFACTURE AND OVERHAUL | 5 | |
| 1.6 | HANDLING | 6 | |
| 1.7 | INVENTORY | 6 | |
| 1.8 | PRESERVATION | 6 | |
| 1.9 | RECEIPT/HANDLING OF PQDR EXHIBITS | 6 | |
| 1.10 | GENERAL WORK REQUIREMENTS | 6 | |
| 1.11 | SPECIFIC WORK REQUIREMENTS | 8 | |
| 1.12 | APPLICABLE TECHNICAL ORDERS | 11 | |
| 1.13 | APPLICABLE DIRECTIVES | 12 | |
| 1.14 | APPLICABLE DOCUMENTS | 13 | |
| SECTION II | 15 | ||
| 2.1 | SERVICE SUMMARY REQUIREMENTS | 15 | |
| 2.2 | CONTRACTOR PERFORMANCE EVALUATION | 15 | |
| SECTION III | 17 | ||
| 3.1 | GOVERNMENT PROPERTY | 17 | |
| APPENDIX 1 | 18 | ||
| A1.1 | ACRONYMS | 18 | |
| APPENDIX 2 | 19 | ||
| A2.1 | NOTES | 19 | |
| APPENDIX 3 | 20 | ||
| A3.1 | PRODUCT VERIFICATION AUDIT PROCEDURES | 20 | |
| A3.2 | TERMS EXPLAINED | 20 | |
| A3.3 | RESPONSIBILITIES | 20 | |
| A3.4 | AUDIT PROCEDURES | 21 | |
| A3.5 | AUDIT RESULTS | 24 |
SECTION I
DESCRIPTION OF SERVICES
This PWS establishes the minimum work requirements for F100-PW-220/E engine remanufacture to a serviceable but not like new condition. Engines received by the contractor, as set forth in this contract shall be remanufactured, modified, tested, prepared for aircraft installation or storage and shipped in accordance with (IAW) the requirements in this PWS and the contract.
1.1 DATA
1.1.1 Reporting Requirements
1.1.1.1 Product Quality Deficiency Report (PQDR – SF 368): The contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54. The contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in T.O. 2J-F100-13-1, WP 600 00.
1.1.1.2 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFLCMC/LPSAAB. Minor discrepancies of non-technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc, shall not be reported. The contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TO’s, or desired changes to TO data shall likewise use the AFTO Form 22.
1.1.1.3 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any PQDR exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.
1.1.2 Other Records, Forms and Reports
1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.
1.1.2.2 CEMS/EMMS Reporting: The status of all serialized life limited parts must be known at all times. This status is to be reported to the Comprehensive Engine Management System (CEMS) or Engine Maintenance Management System (EMMS) as appropriate, IAW T.O. 00-25-254-1 as required by DD Form 1423. Any questions regarding the reporting requirements are to be directed through the ACO.
1.1.2.3 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-129P, paragraph 5.2.21.a.
1.1.3 Technical Data
1.1.3.1 T.O.’s listed in this specification are the basic directives to be used in accomplishing the remanufacture requirements of the contract.
1.1.3.2 T.O. illustrated parts breakdowns (IPB’s) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.
1.1.3.3 Directives listed in paragraphs 1.11.10, 1.12, 1.13 & 1.14 and instructions provided throughout this PWS shall be adhered to. Thus obtaining the highest possible quality of workmanship and to maintain acceptable quality standards.
1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a T.O. represent publication changes to the Technical Order System and shall be complied with. The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.
1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.
1.2 SECURITY
1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.
1.3 QUALITY
1.3.1 The contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.
1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled/remanufactured by the contractor and/or their subcontractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of T.O. 00-35D-54.
1.3.3 No defective parts shall be delivered to the Government.
1.4 DELIVERY PERFORMANCE
1.4.1 The delivery schedules shall be IAW the contract delivery schedules.
1.5 CONDEMNATION, REMANUFACTURE AND OVERHAUL
1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall by IAW T.O. 00-25-113, 00-25-113-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.
1.5.2 Condemnation: The contractor without written approval of the ACO or his representative shall not condemn End Items.
1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical remanufacture shall be disposed of as directed by the ACO in writing.
1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure that purchasers of scrap are unable to remanufacture the item for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished.
1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in T.O. 2J-F100-13-1, WP 600 00.
1.5.3 Remanufacture & Overhaul: End Items determined to be beyond economical remanufacture & overhaul shall not be remanufactured & overhauled by the contractor unless authorized in writing by the ACO.
1.6 HANDLING
1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.
1.6.1.1 The receipt and status of all serialized components or accessories, which are tracked in CEMS/EMMS, must be reported IAW Para 1.1.2.2 of the PWS.
1.7 INVENTORY
1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.
1.8 PRESERVATION
1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.
1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements. Government owned items and parts shall not be co-mingled with non-Government owned property.
1.9 RECEIPT/HANDLING OF PQDR EXHIBITS
1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal remanufacture assets until the investigation is completed. The contractor shall provide the exhibit receipt date through the ACO with the F100 Engineering Source Authority listed in T.O. 2J-F100-13-1, WP 600 00.
1.10 GENERAL WORK REQUIREMENTS
1.10.1 The instructions for the remanufacture of engines stipulated in this PWS shall be performed IAW the applicable T.O.’s and the below exceptions.
1.10.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality Assurance Document).
1.10.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.
1.10.3 The contractor shall inspect the various disassembled components or part of the end item to determine if further remanufacture is needed. Subsequent remanufacture shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.
1.10.4 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.
1.10.5 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this PWS.
1.10.6 The contractor shall replace condemned parts of the end item with like serviceable parts listed in the applicable technical order IPB unless otherwise specified in or within this PWS.
1.10.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.
1.10.8 Where the contractor is directed to hold an item for AFLCMC disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO through the GPA for disposition.
1.10.9 Remanufacture, to the maximum extent, is desired when such remanufacture is economically feasible. The contractor is encouraged to submit new or improved remanufacture procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the contractor’s submission of remanufacture procedures, which are not economically feasible, when such remanufactures are advantageous to the Government.
1.10.10 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.
1.10.11 Fit and tolerance limits shall be IAW applicable overhaul TO/contractor’s processes and procedures unless otherwise specified.
1.10.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul T.O. and instructions contained in this PWS.
1.11 SPECIFIC WORK REQUIREMENTS
1.11.1 Removal
1.11.1.1 Not Applicable.
1.11.2 Disassembly
1.11.2.1 F100-PW-220/E engines shall be disassembled to the module level IAW work packages in Depot level (2J-F100-13 series) technical data.
1.11.2.2 F100-PW-220/E modules shall be disassembled IAW work packages in Depot level (2J-F100-13 series) module specific technical data.
1.11.2.3 F100-PW-220/E engine controls and accessories shall be removed IAW work packages in Depot level (2J-F100-13 series) technical data.
1.11.3 Cleaning
1.11.3.1 F100-PW-220/E Modular and non Modular parts shall be cleaned IAW work packages in Depot level (2J-F100-13 series) general and module specific technical data.
1.11.3.2 F100-PW-220/E engine controls and accessories shall be cleaned IAW workpackages in Depot level (2J-F100-13 series) technical data.
1.11.3.3 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in Depot level (2J-F100-13 series) general and module specific technical data, or T.O. 2-1-111, and that such materials are properly used during application.
1.11.4 Inspection
1.11.4.1 F100-PW-220/E Modular and non Modular parts and assemblies shall be inspected IAW work packages in Depot level (2J-F100-13 series) general and module specific technical data.
1.11.4.2 F100-PW-220/E engine controls and accessories shall be inspected IAW workpackages in Depot level (2J-F100-13 series) technical data.
1.11.5 Corrosion Control
1.11.5.1 The corrosion control of F100-PW-220/E Modular and non Modular parts during remanufacture and storage shall be accomplished IAW work packages in Depot level (2J-F100-13 series) general and module specific technical data and T.O. 2-1-111.
1.11.5.2 The corrosion control of F100-PW-220/E engine controls and accessories during remanufacture and storage shall be accomplished IAW work packages in Depot level (2J-F100-13 series) technical data and T.O. 2-1-111.
1.11.6 Remanufacture
1.11.6.1 F100-PW-220/E Modular and non Modular parts and assemblies shall be remanufactured IAW work packages in Depot level (2J-F100-13 series) general and module specific technical data.
1.11.6.2 F100-PW-220/E engine controls and accessories shall be remanufactured, tested and inspected IAW control or accessory specific technical data.
1.11.6.3 The contractor shall identify all remanufactured F100-PW-220/E Modules with the contractor’s CAGE IAW MIL-STD-130N.
1.11.7 Module Assembly
1.11.7.1 F100-PW-220/E modules shall be assembled IAW work packages in Depot level (2J-F100-13 series) module specific technical data.
1.11.8 Engine Assembly
1.11.8.1 F100-PW-220/E engines shall be assembled IAW work packages in Depot level (2J-F100-13 series) technical data.
1.11.9 Engine Test And Government Acceptance
1.11.9.1 F100-PW-220/E engines shall be tested IAW Depot level engine test (2J-F100-11 series) technical data.
1.11.9.2 The Government shall accomplish acceptance.
1.11.10 Product Verification Audit (PVA)
1.11.10.1 Remanufactured items shall be subject to PVA if requested by the government.
1.11.10.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.
1.11.10.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.
1.11.11 Technical Publication Compliance
1.11.11.1 Compliance with all T.O.’s, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:
1.11.11.1.1 They have not been previously accomplished
1.11.11.1.2 They are pertinent to the end item.
1.11.11.1.3 They prescribe Air Force Policies, use of materials and procedures for remanufacture.
1.11.11.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source Authority listed in T.O. 2J-F100-13-1, WP 600 00, for Instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW T.O. 00-5-2; and be placed on initial distribution for one copy each of the T.O.’s and TCTO’s listed in this PWS. The contractor shall contact AFLCMC/LPS-TOMA, 405-734-8770 within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all T.O.’s and TCTO’s and other technical directives listed in the PWS in an updated and current status IAW T.O. 00-5-1 and T.O. 00-5-2. The contractor is required to comply with the latest dated T.O.; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest T.O. revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to T.O.’s, TCTO’s, and other applicable directives received during that period. However, if a change is received that has a cost impact greater then 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.
1.11.11.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. T.O. 00-5-1 and T.O. 00-5-2 are provided in explanation of the Technical Order System and for pertinent distribution, requisition and storage information.
1.11.11.4 In the event a follow-on to this contract is awarded, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.
1.12 APPICABLE TECHNICAL ORDERS
This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.
TECH ORDER
NUMBER
CHANGE
DATE
SHORT TITLE
| 00-5-1-WA-1 |
| LATEST REVISION |
| AF TECH ORDER SYSTEM |
| 00-5-15-WA-1 |
| LATEST REVISION |
| TIME COMPLIANCE TECH ORDER SYSTEM |
| 00-20-1-WA-1 |
| LATEST REVISION |
| AEROSPACE EQUIPMENT MAINTENANCE |
| 00-20-2-WA-1 |
| LATEST REVISION |
| MAINT DATA DOCUMENTATION |
| 00-20-3-WA-1 |
| LATEST REVISION |
| MAINT PROC OF REPARABLE PROP |
| 00-25-113-2835-WA-1 |
| LATEST REVISION |
| CRITICAL ALLOY AND PRECIOUS METAL |
| 00-25-113-F100-ENG-WA-1 |
| LATEST REVISION |
| CONS SEQ & DIS CRITICAL ALLOY |
| 00-25-254-1-WA-1 |
| LATEST REVISION |
| SYS MANUAL COMPREHENSIVE ENGINE MGT. SYS. (CEMS) |
| 00-35D-54-WA-1 |
| LATEST REVISION |
| USAF DEFICIENCY REPORTING & INVEST SYSTEM |
| 2-1-111 |
| LATEST REVISION |
| STAND MAINT PROCEDURES |
| 2J-F100-9 |
| LATEST REVISION |
| NONDESTRUCTIVE INSPECTION |
| 2J-F100-94 |
| LATEST REVISION |
| SUPPORT EQUIPMENT ILLUSTRATED PARTS BREAKDOWN |
| 2J-F100-11-1 |
| LATEST REVISION |
| ENGINE TEST F100-PW-220/E |
| 2J-F100-13-1 |
| LATEST REVISION |
| INTRODUCTION AND GENERAL INFORMATION |
| 2J-F100-13-2 |
| LATEST REVISION |
| MAINT INSTR – DEPOT OCM |
| 2J-F100-13-3 |
| LATEST REVISION |
| SUPPORT EQPT- NUM TOOL |
| 2J-F100-13-4-1 |
| LATEST REVISION |
| ENG ACC-RIG PROCEDURE 220/E |
| 2J-F100-13-5 |
| LATEST REVISION |
| MAINT INSTR-DEPOT ENGINE |
| 2J-F100-13-6 |
| LATEST REVISION |
| FAN 100/200/220/E MODULES |
| 2J-F100-13-7 |
| LATEST REVISION |
| CORE 100/200/220/E MODULES |
| 2J-F100-13-8-1 |
| LATEST REVISION |
| REAR COMP DRIVE TURBINE 220/E |
| 2J-F100-13-9 |
| LATEST REVISION |
| FAN DRIVE TURB |
100/200/220/E MODULE
| 2J-F100-13-10 |
| LATEST REVISION |
| AUG DUCT & NOZ 100/200/220/E MODULE |
| 2J-F100-13-11 |
| LATEST REVISION |
| GEAR BOX 100/200/220/E MODULE |
| 2J-F100-24 |
| LATEST REVISION |
| IPB 220/E ENGINES |
| 33B-1-1-WA-1 |
| LATEST REVISION |
| NON-DESTRUCTIVE INSP. METHODS |
| 35E20-3-1-103-WA-1 |
| LATEST REVISION |
| METAL CONTAINERS |
| 35E20-3-33-1-WA-1 |
| LATEST REVISION |
| FIBERGLASS CONTAINERS |
| 42B-1-1-WA-1 |
| LATEST REVISION |
| QUAL CONTROL FUEL & LUBS |
| 42B5-1-2-WA-1 |
| LATEST REVISION |
| USE & HANDLING GAS CYLINDERS |
| 42C2-1-7-WA-1 |
| LATEST REVISION |
| PROCESS INSTR METAL TREATMENTS |
| 42E1-1-1-WA-1 |
| LATEST REVISION |
| AEROSPACE HOSE ASSY |
| 44B-1-15-WA-1 |
| LATEST REVISION |
| ANTI-FRICTION BEARINGS |
1.13 APPLICABLE DIRECTIVES
| AIR FORCE INSTRUCTION |
| CHANGE DATE |
| TITLE |
| AFI 21-101 |
| JUL 2010 |
| AIRCRAFT AND EQUIPMENT MAINTENANCE MANAGEMENT |
| AFI 21-118 |
| OCT 2003 |
| IMPROVING AIR AND SPACE EQUIPMENT RELIABILITY AND MAINTAINABILITY |
| MILITARY STANDARDS |
| CHANGE DATE |
| TITLE |
MIL-STD-129P
| 19 SEP 07 |
| U.S. MILITARY MARKING FOR SHIPMENT AND STORAGE |
| MIL-STD-130N |
| 17 DEC 07 |
| ID MARKING OF U.S. MILITARY PROP. |
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
| ISO - 9001 |
| 15 DEC 00 |
| QUALITY MANAGEMENT SYSTEMS – REQUIREMENTS – THIRD EDITION |
1.14 APPLICABLE DOCUMENTS
1.14.1 LPF-QAR-001: “GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100 ENGINE FC/DC BREAKOUT COMPONENTS”
1.14.2 LPF-QAR-002: “CHANGE PROCEDURES FOR PROCESS ORDERS”
1.14.3 LPF-QAR-004: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR F100 ENGINE COMPONENTS”
1.14.4 LPF-QAR-006: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND REPORTS
1.14.5 LPF-QPR-007: “LPFR QUALITY PLAN REQUIREMENTS FOR PLASMA SPRAYED COATINGS”
1.14.6 LPF-QPR-009: “LPFR QUALITY PLAN REQUIREMENTS FOR VACUUM BRAZED ASSEMBLIES”
1.14.7 LPF-QPR-016: “LPFR QUALITY PLAN REQUIREMENTS FOR DURABILITY CRITICAL PARTS
1.14.8 LPF-QPR-017: “LPFR QUALITY PLAN REQUIREMENTS FOR CAST HONEYCOMB RING SEGMENTS AND RING ASSEMBLIES”
1.14.9 LPF-QPR-018: “LPFR QUALITY PLAN REQUIREMENTS FOR NONDESTRUCTIVE INSPECTION”
1.14.10 LPF-QR-001: “BASIC TECHNICAL DATA REQUIREMENTS FOR FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS”
1.14.11 LPF-QR-002: “CONDITIONS OF WAIVER FOR FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS”
1.14.12 EI FOR RQR-1: “GENERIC ENGINEERING INSTRUCTIONS FOR REMANUFACTURE OF F100 PARTS IN RQR-1”
1.15 CONTRACTOR IDENTIFICATION
Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
1.16 MISSION ESSENTIAL SERVICES N/A- Note: Not required in this contract.
1.16.1 The contractor shall prepare for the continuation of essential DoD services during crisis IAW Defense Federal Acquisition Regulation Supplement (DFARS) 252.237-7023. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours. IAW DFARS 252.237-7023, the contractor shall develop a contingency plan and furnish a copy to the PCO for those tasks identified as essential to provide reasonable assurance of continuation during crisis conditions.
SECTION II
SERVICE SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract. The government will use the surveillance methods contained in the Surveillance Plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.
NOTE: For those requirements listed in Section II, Service Summary, the Surveillance Plan will follow the methods of surveillance specified in the Surveillance Plan. The Surveillance Plan is authorization for the Government’s PCO to participate in the administration of this contract.
2.1 SERVICE SUMMARY REQUIREMENTS
2.1.1 The contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:
Table 2-1
| Performance Objective |
| Reference Paragraph |
Performance Threshold
SS-1 Quality
| Section 2 Para 1.3.3 |
| No defective parts shall be delivered to the government. |
SS-2 Delivery
| Section 2 Para 1.4 |
| The contractor shall meet the delivery schedule in accordance with the contract. |
2.2 CONTRACTOR PERFORMANCE EVALUATION
2.2.1 The contractor shall be aware that the evaluation of performance will occur when the Program Manager evaluates the services of the contractor to determine whether or not it meets the performance measures of the contract.
2.2.1.1 SS-1: The contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.246-4 Inspection of Services-Fixed Price.
2.2.1.2 SS-2: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and remedies as allowed under FAR 52.246-4 Inspection of Services-Fixed Price.
SECTION III
GOVERNMENT PROPERTY
3.1 GOVERNMENT PROPERTY
3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnished Material shall not be provided.
APPENDIX 1
1.1 ACRONYMS
| ACO |
| Administrative Contracting Officer |
| AFLCMC |
| Air Force Life Cycle Management Center |
| AFMC |
| Air Force Material Command |
| ALC |
| Air Logistics Center |
| CAGE |
| Contractor and Government Entity |
| CAO |
| Contract Administration Office |
| CEMS |
| Comprehensive Engine Management System |
| DOD |
| Department of Defense |
| EC |
| Engineering Change |
| ESA |
| Engineering Source Authority |
| FAR |
| Federal Acquisition Regulation |
| GFM |
| Government Furnished Material |
| GFP |
| Government Furnished Property |
| GPA |
| Government Property Administrator |
| IAW |
| In Accordance With |
| IPB |
| Illustrated Parts Breakdown |
| MRB |
| Material Review Board |
| NDI |
| Nondestructive Inspection |
| OEM |
| Original Equipment Manufacturer |
| PCO |
| Procurement Contracting Officer |
| PIR |
| Publication Improvement Report |
| PQDR |
| Product Quality Deficiency Report |
| PVA |
| Product Verification Audit |
| QAD |
| Quality Assurance Document |
| QAR |
| Quality Assurance Representative |
| QCD |
| Quality Control Deficiency |
| SL |
| Salvage Layout |
| SR |
| Service Remanufacture |
| TO |
| Technical Order |
| USAF |
| United States Air Force |
| WP |
| Work Package |
APPENDIX 2
A2.1 NOTES
A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the contractor identifies non-conformance of material or parts during and after assembly. The MRB is not authorized to violate any T.O. limit. When MRB action is required on material or parts during and after assembly, the contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSA via email within (5) working days after approval of the MRB.
APPENDIX 3
A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES
A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract remanufacture work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of a remanufactured item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.
A3.2 TERMS EXPLAINED
A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor remanufacture effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.
A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.
A3.2.3 Remanufacture Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for remanufacture and rehabilitation of a reparable/unserviceable item.
A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:
A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.
A3.3 RESPONSIBILITIES
A3.3.1 The contractor shall:
A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and Air Logistics Center (ALC) representative(s).
A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.
A3.3.2 The cognizant DOD QAR shall:
A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).
A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.
A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.
A3.4 AUDIT PROCEDURES
A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:
A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are furthered identified as follows:
A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.
A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).
A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:
A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with contractual requirements.
A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.
A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:
A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with contractual requirements.
A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.
A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.
A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.
A3.4.2 Scheduling/Frequency
A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.
A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.
A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the PCO or his designated representative has been obtained.
A3.4.3 Inspection and Test
A3.4.3.1 Audit candidates shall be randomly selected by the cognizant DOD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.
A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.
A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container. A visual inspection and functional test shall be performed prior to disassembly.
A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants. Normally, audit participation will be limited to specified contractor production and quality control personnel, the cognizant DOD QAR and ALC personnel.
A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.
A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.
A3.4.4 Corrective Actions
A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor will promptly advise the Government of the identity and destination of such previously shipped items.
A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the remanufacture process which will preclude recurrence.
A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.
A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.
A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions necessary to correct the procedures or operations concerned.
A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable remanufacture specifications including preservation, packing, packaging, marking and update of records.
A3.4.4.7 After the audit is completed, the DOD QAR shall conduct a critique attended by contractor personnel and ALC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.
A3.5 AUDIT RESULTS
A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:
A3.5.1.1 Name and address of the contractor.
A3.5.1.2 Contract number.
A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.
A3.5.1.4 Summary of total defects.
A3.5.1.4.1 Category IA
A3.5.1.4.2 Category IB
A3.5.1.4.3 Category IIA
A3.5.1.4.4 Category IIB
A3.5.1.4.5 Category IIIA
A3.5.1.4.6 Category IIIB
A3.5.1.4.7 Category IV
A3.5.1.5 A complete listing of audit findings.
A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.
A3.5.1.7 Cause(s) for each noted defect.
A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.
A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.
A3.5.1.10 The signature of the DOD QA participants, contractor management personnel and ALC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non-concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."
FD2030-12-35821 Page 25 of 25
File details come from the government source that posted it. Updated .