Vendor_Questions_and_Government_Responses_Document_Final.pdf
PDF 111 KB Posted
- Solicitation number
- FA8122-20-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA812220R0002_______0002.pdf | ||
| Vendor_Questions_and_Government_Responses_Document.pdf | ||
| Pricing_Matrix_Amendment_01_Protected_Final.xlsx | XLSX spreadsheet | |
| SOW_Revision1_3June2020.pdf | ||
| FA812220R0002_______0001.pdf | ||
| DI-PSSS-81995.pdf | ||
| Pricing_Matrix_Protected.xlsx | XLSX spreadsheet | |
| Repair_Data_List.pdf | ||
| DI-MGMT-80503.pdf | ||
| SOW Mod 13 15 Navy 10Jun2019.pdf | ||
| CDRLs.pdf | ||
| Transportation_Data_01.pdf | ||
| Packaging_Requirements_01.pdf | ||
| FA812220R0002.pdf | ||
| GFP Attachment.pdf | ||
| DI-MGMT-81324C.pdf | ||
| DI-PSSS-81535A.pdf | ||
| DI-MGMT-80441C.pdf | ||
| DI-MGMT-81838.pdf | ||
| RQR.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F108 Mod 13/15 Navy Additional Vendor Questions - 21 May 2020
Question Number
Question Gov't Response
Chromalloy - SOW - Request for Clarification and/or Changes
1 Page 3, Subparagraph 1.8, Paragraph 1, Sentence 2: Usage of F108-201, should this be F108-200?
Changed Page 3, Subparagraph 1.8, Paragraph 1, Sentence 2: from "Usage of F108-201" to "Usage of F108-200".
Page 3, Subparagraph 1.8, Paragraph 1, Last Sentnce: Is the following callout correct, “…determine condition using CFM56 ESM (CMM) 72-54-XX and 72-56-XX”?
Changed Page 3, Subparagraph 1.8, Paragraph 1, Last Sentence: from “CFM56 ESM (CMM) 72- 54-XX and 72-56-XX” to "CFM56 Engine Shop Manual (ESM) 72-54 and 72-56".
Page 3, Subparagraph 1.8, Paragraph 2, Last Sentence: “…and for such shipments as described above via the DoD web-based application WebSDR, located at: https://www.transactionservices.dla.mil/daashome/websdr.asp.” Contractor requests waiver from this reporting requirement as special clearance is required to support a CAC card. Contractor can support CDRL A005, SF 364 submission outside of the WebSDR system.
No waiver can be granted at this time, however may be approved at time of award. Per
1.28.4.2 of the SOW, Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.
W.H. 6/2/20
4 Page 4, Subparagraph 1.11, Paragraph 2: what is meant by the term “(LLP) remanufactured from Government inventory”?
Changed Page 4, Subparagraph 1.11, Paragraph 2 to remove "Government inventory".
Changed from "Replacement Life Limited Parts (LLP) shall be new and unused from USAF and/or Navy approved sources or remanufactured from Government inventory. New and unused non-LLP shall be from Navy approved vendors, Government inventory, or OEM approved vendors." to "Replacement Life Limited Parts (LLP) shall be new and unused from USAF and/or Navy approved sources. New and unused non-LLP shall be from Navy approved vendors or OEM approved vendors."
Page 4, Subparagraph 1.11, Paragraph 2, Last Sentence: Addition of CoC - The Contractor shall provide FAA Form 8130-3 or Certificate of Conformance documentation for each used component in a module at time of delivery.
CoC documentation added to Page 4, Subparagraph 1.11, Paragraph 2, Last Sentence. The last sentence now reads "The Contractor shall provide FAA Form 8130-3 documentation or Certificate of Conformance for each used component in a module at time of module delivery."
6 Page 4, Subparagraph 1.11.1.1, Line 1: Repair 0001 should be Repair 001. Corrected Page 4, Subparagraph 1.11.1.1, Line 1 by changing Repair 0001 to Repair 001
Page 4, Subparagraph 1.11.1.2.2: Please add: The pre-twist angle requirements do not apply to new, unused OEM blades. (This requirement was incorporated into the current contractual requirements via prior Q&A)
Changed Page 4, 1.11.1.2.2 to read: All blades used must meet the following pre-twist angle requirements (The pre-twist angle requirements do not apply to new, unused OEM blades):
8 Page 5, Subparagraph 1.11.1.5: HPT Rear Turbine Frame should be LPT Rear Turbine Frame.
Page 5, Subparagraph 1.11.1.5 Title changed to "Low Pressure Turbine Frame Cleaning and NDI Inspection"
9 Page 5, Subparagraph 1.12: RFD to be replaced by RFV. Vendor will have to elaborate on why RFD is not sufficient per MIL-HDBK-61A 6.3.
10 Page 5, Subparagraph 1.12: Engine Shop Manual (ESM) corrections: 72-54-020 to 72-54-20; and 72-56-010 to 72-56-10.
Corrected Page 5, Subparagraph 1.12 to: ESM 72-54-00 thru 72-54-20 and 72-56-00 thru 72-56- 10.
11 Page 5, Subparagraph 1.16: How is the contractor to determine “equal or superior to the original”?
Changed to: materials, parts, and accessories used for replacement items shall meet serviceable inspection criteria and are interchangeable without alteration per CFM56-2A Engine Manual.
Page 6, Subparagraph 1.18.1: SOW Adds SB 72-0228. Will the Navy consider Chromalloy MCP#046, Application of Titanium Aluminum Dioxide Coating to Pre SB72-0365 R0 Blades, to produce the cutter (hardened teeth) blades in lieu of SB 72-0228?
Vendor shall submit RFD for deviations from Service Bulletin 72-0228.
13 Page 6, Subparagraph 1.18.1, Note: Reference to Module 14 to be corrected to read Module 13/15.
Changed Page 6, Subparagraph 1.18.1, Note to read "Currently the above mentioned Service Bulletins require compliance. Should, in the future, additional Service Bulletin(s) be released and required to return a Module 13/15 to like new condition they will be addressed on a case by case basis and may be incorporated in this SOW via contract modification."
14 Page 6, Subparagraph 1.18.3: Add Certificate of Conformance, FAA 8130-3 Form or Certificate of Conformance.
Changed Page 6, Subparagraph 1.18.3 to read "FAA 8130-3 Form or Certificate of Conformance"
Page 6, Subparagraph 1.18.3, Last Sentence: “Maintenance Release Tag” – serviceable tag, maintenance release tag. (FAA document is the maintenance release tag)
Request clarification. This statement is unclear and is not a question or request.
16 Page 6, Subparagraph 1.18.4, Line 2 and Line 3: Change 30 to 60. Changed Page 6, Subparagraph 1.18.4, Line 2 and Line 3 to 60 day time frame.
Page 6, Subparagraph 1.18.4: The ability to find replacement nozzles that have documentation reflecting no-more-than “one remanufacturing cycle” is becoming very hard to find? Pre-SB nozzles are no longer manufactured. If one-(1) each post nozzle is used, all nozzles of this stage must also be replaced. Conversation is required to (1) either removed the “one-manufacturing-cycle” requirement or (2) include a CLIN for full stage Post-SB nozzle replacement – in excess of a million dollars.
Changed Page 6, Subparagraph 1.18.4 last sentence to read "If Navy assets are not available to replace those that have been condemned, and the only assets available are commercial assets; commercial assets may be used provided that they are from Navy approved vendors or OEM approved vendors, and meet serviceable inspection criteria and are interchangeable without alteration per CFM56-2A Engine Manual."
18 Page 7, Subparagraph 1.18.5: Add Certificate of Conformance in addition to FAA Form 8130-3.
Changed Page 7, Subparagraph 1.18.5 to read "FAA 8130-3 Form or Certificate of Conformance"
19 Page 7, Subparagraph 1.19, Note: add Conical Support (See CLIN X001AK) Added Conical Seal to Page 7, Subparagraph 1.19, Note. "The parts included at this time are the Conical Seal, Stage 1 Disk, Stage 2 Disk, Stage 3 Disk and Stage 4 Disk."
20 Page 7, Subparagraph 1.19, Note: Stage 1 Blades are not LLPs and should be removed from this subsection. Removed stage 1 blades from Page 7, Subparagraph 1.19, Note.
21 Page 7, Subparagraph 1.21: What is your definition of ensure materials, parts and accessories are restored to “like new condition”?
Remanufacture is determined and shall be deemed manufacturing per FAR 22.1003-6 and 48 CFR §22.1003-6. Specifically, but not exclusive: The items or equipment overhauled are restored to original life expectancy, or nearly so whereas the item or equipment is required to be completely or substantially torn down into individual component parts. Substantially all of the parts are reworked, rehabilitated, altered and/or replaced. The parts are reassembled so as to furnish a totally rebuilt item or piece of equipment. C.M. 6/2/20
22 Page 7, Subparagraph 1.22: Update (ISO) 9001:2000 to (ISO) 9001:2015. Updated ISO 9001:2000 to 9001:2015.
Page 8, Subparagraph 1.24: Request the SOW inclusion of the following statement, “Component condemnation will then be processed in accordance with Contractor’s internal scrap processes and procedures. Proceeds will be retained by the Contractor to cover the expense of processing and disposing of condemned material.”
Changed SOW Page 8, Subparagraph 1.24, second sentence to read: "Component condemnation and scrap disposal shall be in accordance with (IAW) FAR 46.605 and FAR
45.606 as well as DFARS 252.245-7004, Reporting, Reutilization, and Disposal. Disposal shall be through the Defense Reutilization and Marketing Office (DRMO). Utilization of contractor’s internal scrap procedures may be approved after receipt and approval the contractors plan or Standard Operating Procedures (SOP) for condemnation and scrap process. All scrap disposal shall be IAW Defense Logistics Agency Demilitarization (DMIL) Code requirements with coordination through DCMA Plant Clearance Officer on SF 1424.
Change SOW 1.24.1 Condemned Asset Reporting to read: Condemned F108-200 Module 13/15 component shall be reported via CDRLs Form 413, Monthly Production Report and Commercial Asset Visibility for Air Force (CAV AF). Condemnations shall be reported to 421 SCMS/GUMBA, Air Force Global Logistics Support Center (AFGLSC) to establish usage rates and cost planning.
C.M. 6/2/20
24 Page 8, Subparagraph 1.25, Paragraph 2, Line 1: Correct Mil Standard Number to MIL-STD-129R.
Corrected Page 8, Subparagraph 1.25, Paragraph 2, Line 1 to read: In addition, all marking and labeling of unit and shipping containers shall be IAW MIL-STD-129R, Department of Defense Standard Practice, Military Marking for Shipment and Storage.
Page 8, Subparagraph 1.26: Add Note: Contractor is authorized to utilize reusable or older shipping containers as received, i.e., missing or broken latches. Contractor will continue to band the containers utilizing metal strapping.
Changed Page 8, Subparagraph 1.26 to read: The contractor shall not destroy reusable shipping containers, and will reuse them for return shipment. Contractor is authorized to utilize shipping containers as received, i.e., missing or broken latches. Contractor will continue to band the containers utilizing metal strapping. In the event that a shipping container is no longer usable or requires extensive repair, the contractor will contact the PCO for disposition instructions. Units shall be packed IAW with T.O. 00-85B-3
Page 8, Subparagraph 1.27: (Request deletion of the provided direction.) Contractor to accomplish UID in accordance with WAWF requirements.
The IUID requirements are per MIL-STD-130N and in accordance with DFARS 252.211-7003 for $5,000 or more which allows for equivilants for commercial items - The commercial unique identifiers meeting these criteria that the Department recognizes as DoD IUID equivalents are the:
•EAN.UCC Global Individual Asset Identifier (GIAI) for serially-managed assets, •EAN.UCC Global Returnable Asset Identifier (GRAI) for returnable assets, and •ISO Vehicle Identification Number (VIN) for vehicles.
•Electronic Serial Number (ESN) for cellular telephones only •Mobile Equipment Identifier (MEID) for cellular telephones only •Cellular Mobile Telephone Identifier (CMTI) for cellular telephones only In addition to these equivalents, the data requirements of 14 CFR Part 45, Identification and Registration Marking, for only aircraft, aircraft engines, propellers, and propeller blades and hubs are consistent with the data elements required by our IUID constructs.
C.M.
6/2/20
Page 9, A003: Propose optional wording as access to CEMS requires higher level clearances from the USAF. Suggested Language:
CEMS Reporting can be accomplished by providing remanufacture CEMS data within the Contractor’s Certificate of Conformance.
CEMS access does not require higher level clearance. Per CEMS Security, the following are required for contractor access:
1. DD FM 2875 SAAR: Part II completed by Supervisor/Government Sponsor; Part III completed by Security Management Officer.
2. Completed Non-Disclosure Statement (NDS): Part II must be signed by a Government Sponsor (Military or Civil Service).
3. A copy of their DoD IAA Cyber Awareness Challenge training certificate from either the ADLS training website (accessible by CAC) or DISA's IASE website (non-CAC). Refer to the Contractor Access Process Instructions on this site for further information.
All required documents can be obtained from CEMS Security at (CEMS.PMO.Security@us.af.mil).
28 Page 12, Subject: Correct HPT to reflect LPT Rear Turbine Frame. Page 12, Subject Title changed to "Low Pressure Turbine Frame Cleaning and NDI Inspection"
Additional: Solicitation CLIN - Stage 1 LPT New OEM blades – discuss usage and cost impacts.
The solicitation contains a CLIN for new OEM 1st Stage LPT blades. Please advise the intended usage for this CLIN, I have not found any notes or SOW direction defining what the application or usage of how the CLIN for new OEM LPT blades is to be used.
Current price of new OEM Stage 1 blades is around $5200.00 each. The OEM catalog does not provide a firm price thus the unit price continues to be a moving target…we ran across this issue with the USAF Module 13/15. There is also the OEM Suspect Blade (non-warranty) service bulletin to be considered.
Does the Navy want the remanufacture CLIN price to be reflective of $5200.00 blade replacement and associated risk?
Or does the Navy want the CLIN to reflect all reasons associated with 1st stage LPT blade replacement?
The contractor is to identify and recommend Stage I Blade replacement to the Navy Engineer through the PCO. Final determination and approval to replace LPT Blades with new LPT Blades will continue to be made by the Navy on an individual basis, and will be funded on individual delivery orders as required.
CFM/GE
With the USAF Mod 13-15 contract awarded and due to similar workscopes for the Navy Mod 13-15, can USAF provide a list, if any, of government approved DERs, Variances or Non-OEM part repairs that would applicable to the Navy Mod 13-15?
There are no approved DER's for this action at this time; please refer to Para 1.13 of the SOW for future deviations.
F108 13 15 Vendor Questions