FA812216R0020_______0003.pdf

PDF 21 KB Posted

Attached to
AUG/NOZZLE (ANER) Kit Federal contract opportunity
Solicitation number
FA8122-16-R-0020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

FA8122-16-R-0020-P00003

View the file

Other files for this federal contract opportunity

Other files attached to AUG/NOZZLE (ANER) Kit, newest first.
File Type Posted
AttachmentB_BOM_Revision_2_AO_9_Aug_18.pdf PDF
FA812216R0020_______0002.pdf PDF
FA812216R0020_Attachment_T_Washers_133A1624P50.pdf PDF
FA812216R0020_Attachment_A_Final_Egypt_SLEP_Kit_Revision_1_2018_Shipments.pdf PDF
FA812216R0020_Attachment_Z_HPT_RTR_ASSY_2214M18G03.pdf PDF
FA812216R0020_Attachment_AA_HPT_RTR_ASSY_2214M18G03.pdf PDF
FA812216R0020_Attachment_L_Nut_J626P07.pdf PDF
FA812216R0020_Attachment_P_LWR_Duct_Tube_1264M38G02.pdf PDF
FA812216R0020_Attachment_K_Nut_J630P03.pdf PDF
FA812216R0020_Attachment_M_LWR_Duct_Tube_1296M36G02.pdf PDF
FA812216R0020_Attachment_E_Tube_2171M57G01.pdf PDF
FA812216R0020_Attachment_N_LWR_Duct_Tube_1549M44G02.pdf PDF
FA812216R0020_Attachment_H_Bracket_2279M76G01.pdf PDF
FA812216R0020_Attachment_C_W-3_Red_Cable_1820M63G01.pdf PDF
FA812216R0020_Attachment_B_Final_Egypt_SLEP_Kit_Revision_2_2019_Shipments.pdf PDF
FA812216R0020_AFMCFORM158-0004.pdf PDF
FA812216R0020_Attachment_S_Bolts_2071M36P01.pdf PDF
FA812216R0020_Attachment_V_Igniter_Retainers_5053M36P01.pdf PDF
FA812216R0020_Attachment_Y_RTR_ASSY_CPRSR_2214M14G01.pdf PDF
FA812216R0020_Attachment_J_Bolt_MS9557-24.pdf PDF
FA812216R0020_Attachment_W_Bolts_MS9490_24.pdf PDF
FA812216R0020_Attachment_R_LWR_Duct_Tube_1265M46G01.pdf PDF
FA812216R0020_Attachment_U_Igniter_Retainers_5053M37P01.pdf PDF
FA812216R0020_Attachment_Q_LWR_Duct_Tube_1610M40P03.pdf PDF
FA812216R0020_Attachment_G_Bracket_2145M54G01.pdf PDF
FA812216R0020_DDFORM1653-0004.pdf PDF
FA812216R0020_Attachment_F_Tube_2171M60G01.pdf PDF
FA812216R0020_Attachment_X_COVER_CLG_AIR_1276M30G02.pdf PDF
FA812216R0020_Attachment_O_LWR_Duct_Tube_1331M78G04.pdf PDF
FA812216R0020_Attachment_I_Bolt_MS9556-24.pdf PDF
FA812216R0020.RTF RTF text file
FA812216R0020_Attachment_D_AC_Stator_1376M46P07.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

FA8122-16-R-0020-0003

3. EFFECTIVE DATE

9 AUG 2018

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZAAB

3001 STAFF DR STE 1AG1 98C

TINKER AFB OK 73145-3303

BUYER: LaTanya Harley/AFSC/PZAAB latanya.harley@us.af.mil Phone: (405) 622- 7658 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8122

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA812216R0020

9B. DATED (SEE ITEM 11)

1-AUG-2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Routine

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8122-16-R-0020-0003

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to:

- To update provision 52.230-1 pursuant to a change in threshold for obtaining certified cost and pricing data.

- To remove PNs from Assembly PN, 738L372G03, EAF MEC KIT, and update Attachment B, Revision 2 BOM.

FIRST: In accordance with (IAW) Class Deviation 2018-O0015, contracting officers shall now use $2,000,000 as the threshold for obtaining certified cost or pricing data, in lieu of the $750,000 threshold. The following provisions are hereby updated pursuant to a change in the threshold for obtaining certified cost or pricing data:

52.230-1 Cost Accounting Standards Notices and Certification (Deviation 2018- 00012)

SECOND: The following PNs will be removed from Assembly PN, 738L372G03, EAF MEC KIT, Attachment B, Revision 2 BOM.

Assembly PN Assembly Nomen Part Number Nomenclature

738L372G03 EAF MEC KIT 1-950-28 SEAL

738L372G03 EAF MEC KIT 1006VBL BRG

738L372G03 EAF MEC KIT 5009843 LOCKNUT,BEARING

738L372G03 EAF MEC KIT 5903448 BEARING,BALL

738L372G03 EAF MEC KIT 5903519 VALVE,CHECK

738L372G03 EAF MEC KIT 5908371 OIL SEAL

THIRD: All other terms and conditions remain in full force and effect.

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages AttachmentB_BOM_Revision_2_AO_9_Aug_18.pdf Attachment B_BOM_Revision_2_9_Aug_18

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K

REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS

52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015) (MAY

2018) (MAY 2018)

(IAW DARS Tracking Number: 2018-O0015)

File details come from the government source that posted it.