FA812210R0037_______0004.pdf
PDF 24 KB Posted
- Attached to
- Engine Accessories Federal contract opportunity
- Solicitation number
- FA8122-10-R-0037
About this file
Amendment 04
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted J A.pdf | ||
| FA812210R0037 Amendment03.pdf | ||
| FA812210R0037 Amendment02.pdf | ||
| PackagingRequirements.pdf | ||
| AppendixB.pdf | ||
| RDL.pdf | ||
| SafetySpecAppC.pdf | ||
| PerformanceWorkStatementAppendixA.pdf | ||
| 1423s1664s.pdf | ||
| AppendixB.pdf | ||
| AppendixC.pdf | ||
| AppendixD.pdf | ||
| AppendixA.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8122-10-R-0037-0004
3. EFFECTIVE DATE
2 JUN 2011
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, TINKER GLSC 848 SCMG/PKAB
BLDG 3001 SUITE 2AH82A
TINKER AFB OK 73145-3015
BUYER: Rondie Thornton/PKAB rondie.thornton@tinker.af.mil Phone: (405) 734- 4634 Fax: (000) 000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8122
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA812210R0037
9B. DATED (SEE ITEM 11)
8-JUL-2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 9-JUN-2011 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Routine
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8122-10-R-0037-0004
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this Amendment is to revise the Over and Above line items and the Beyond Economical Repair line items for the Basic Year and all Options as denoted below;
FIRST: Line Item Numbers 0004, 0005, 1004, 1005, 2004, 2005, 3004, 3005, 4004, and 4005 are hereby revised as denoted below in Section B.
SECOND: The offer due date for all offerors is hereby extended as follows:
From: 3-Jun-2011 3:00PM
To: 9-Jun-2011 3:00PM
THIRD: All other terms and conditions remain in full force and effect.
Request for Proposal FA8122-10-R-0037-0004
SUPPLIES OR SERVICES AND PRICES/COSTS
OVER & ABOVE
Item No.
Over and Above work in support of work performed in Schedule B The over and above items set forth below are not included in the scope and prices of the basic work items in Appendix A.
The work called for under these items shall be accomplished when directed by the ACO/PCO in accordance with Clause 252.217-7028 entitled "Over and Above Work". The over and above items set forth below are not included in the scope and prices of the basic work items.
(1) Fixed Price Items. __RESERVED___
(2) Fixed Hourly Rate Items. For the accomplishment of work set forth in these items, the fixed hourly rate of $________ per hour will be used in negotiating a price.
Delivery will be as negotiated between the Contractor and ACO/PCO and specified on each Work request issued thereafter.
The Over and Above work unit of measure is Lot and each Lot shall be defined as a unit of time of one hour.
BEYOND ECONOMIC REPAIR (BER)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO To be Negotiated
Items beyond Economical Repair Work performed on items subsequently determined by the ACO/PCO to be Government economic overhaul IAW Appendix A, para
1.6 the contractor services and direct materials furnished in the amount as set forth in the Work Request to be performed. On those items which exceed 75% of the new buy replacement cost for the USAF, but for which a critical requirement exists, the PCO will inform the ACO when ever such a requirement exists and the ACO/PCO will then authorize the contractor to proceed with overhaul of said items.
Same as O&A CLIN 0004
OVER & ABOVE
Item No.
Over and Above work in support of work performed in Schedule B
OVER & ABOVE
The over and above items set forth below are not included in the scope and prices of the basic work items in Appendix A. The work called for under these items shall be accomplished when directed by the ACO/PCO in accordance with Clause 252.217-7028 entitled "Over and Above Work". The over and above items set forth below are not included in the scope and prices of the basic work items.
(1) Fixed Price Items. __RESERVED___
(2) Fixed Hourly Rate Items. For the accomplishment of work set forth in these items, the fixed hourly rate of $________ per hour will be used in negotiating a price.
Delivery will be as negotiated between the Contractor and ACO/PCO and specified on each Work request issued thereafter.
The Over and Above work unit of measure is Lot and each Lot shall be defined as a unit of time of one hour.
Firm Fixed Price Quantity U/I Unit Price Amount
LO To be Negotiated
Items beyond Economical Repair Work performed on items subsequently determined by the ACO/PCO to be Government economic overhaul IAW Appendix A, para
1.6 the contractor services and direct materials furnished in the amount as set forth in the Work Request to be performed. On those items which exceed 75% of the new buy replacement cost for the USAF, but for which a critical requirement exists, the PCO will inform the ACO when ever such a requirement exists and the ACO/PCO will then authorize the contractor to proceed with overhaul of said items.
Same as O&A CLIN 1004
OVER & ABOVE
Item No.
Over and Above work in support of work performed in Schedule B The over and above items set forth below are not included in the scope and prices of the basic work items in Appendix A. The work called for under these items shall be accomplished when directed by the ACO/PCO in accordance with Clause 252.217-7028 entitled "Over and Above Work". The over and above items set forth below are not included in the scope and prices of the basic work items.
(1) Fixed Price Items. __RESERVED___
(2) Fixed Hourly Rate Items. For the accomplishment of work set forth in these items, the fixed hourly rate of $________ per hour will be used in negotiating a price.
Delivery will be as negotiated between the Contractor and ACO/PCO and specified on each Work request issued thereafter.
The Over and Above work unit of measure is Lot and each Lot shall be defined as a unit of time of one hour.
BEYOND ECONOMIC REPAIR (BER)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO To be Negotiated
Items beyond Economical Repair Work performed on items subsequently determined by the ACO/PCO to be Government economic overhaul IAW Appendix A, para
1.6 the contractor services and direct materials furnished in the amount as set forth in the Work Request to be performed. On those items which exceed 75% of the new buy replacement cost for the USAF, but for which a critical requirement exists, the PCO will inform the ACO when ever such a requirement exists and the ACO/PCO will then authorize the contractor to proceed with overhaul of said items.
Same as O&A CLIN 2004
OVER & ABOVE
Item No.
Over and Above work in support of work performed in Schedule B The over and above items set forth below are not included in the scope and prices of the basic work items in Appendix A. The work called for under these items shall be accomplished when directed by the ACO/PCO in accordance with Clause 252.217-7028 entitled "Over and Above Work". The over and above items set forth below are not included in the scope and prices of the basic work items.
(1) Fixed Price Items. __RESERVED___
(2) Fixed Hourly Rate Items. For the accomplishment of work set forth in these items, the fixed hourly rate of $________ per hour will be used in negotiating a price.
Delivery will be as negotiated between the Contractor and ACO/PCO and specified on each Work request issued thereafter.
The Over and Above work unit of measure is Lot and each Lot shall be defined as a unit of time of one hour.
Firm Fixed Price Quantity U/I Unit Price Amount
LO To be Negotiated
Items beyond Economical Repair Work performed on items subsequently determined by the ACO/PCO to be Government economic overhaul IAW Appendix A, para
1.6 the contractor services and direct materials furnished in the amount as set forth in the Work Request to be performed. On those items which exceed 75% of the new buy replacement cost for the USAF, but for which a critical requirement exists, the PCO will inform the ACO when ever such a requirement exists and the ACO/PCO will then authorize the contractor to proceed with overhaul of said items.
Same as O&A CLIN 3004
OVER & ABOVE
Item No.
Over and Above work in support of work performed in Schedule B The over and above items set forth below are not included in the scope and prices of the basic work items in Appendix A. The work called for under these items shall be accomplished when directed by the ACO/PCO in accordance with Clause 252.217-7028 entitled "Over and Above Work". The over and above items set forth below are not included in the scope and prices of the basic work items.
(1) Fixed Price Items. __RESERVED___
(2) Fixed Hourly Rate Items. For the accomplishment of work set forth in these items, the fixed hourly rate of $________ per hour will be used in negotiating a price.
Delivery will be as negotiated between the Contractor and ACO/PCO and specified on each Work request issued thereafter.
The Over and Above work unit of measure is Lot and each Lot shall be defined as a unit of time of one hour.
Firm Fixed Price Quantity U/I Unit Price Amount
LO To be Negotiated
Items beyond Economical Repair Work performed on items subsequently determined by the ACO/PCO to be Government economic overhaul IAW Appendix A, para
1.6 the contractor services and direct materials furnished in the amount as set forth in the Work Request to be performed. On those items which exceed 75% of the new buy replacement cost for the USAF, but for which a critical requirement exists, the PCO will inform the ACO when ever such a requirement exists and the ACO/PCO will then authorize the contractor to proceed with overhaul of said items.
Same as O&A CLIN 4004
File details come from the government source that posted it. Updated .