FA8122-24-R-0003.pdf
PDF 378 KB Posted
- Attached to
- Repair/Overhaul of Multiple T53 NSNs
- Solicitation number
- FA812224R0003
About this file
This document is a solicitation (Solicitation Number: FA812224R0003) for the repair and overhaul of multiple National Stock Numbers (NSNs) for the Honeywell T53-L-703 Helicopter Engine. The requirement is for a contractor-furnished material (CFM) effort, where the contractor must be a certified Honeywell Authorized Service Center and possess all current technical manuals and documentation from the Original Equipment Manufacturer (OEM).
The solicitation is for a one-year ordering period with four one-year options, and an additional six-month option. The contractor shall provide all required labor, facilities, equipment, and materials to accomplish the overhaul, repair, testing, preservation, and packaging of serviceable items in accordance with the OEM's specifications. The government will not entitle the contractor to any equitable adjustment in price if the government fails to provide the estimated quantities. The solicitation includes set-asides for small business, HUBZone small business, service-disabled veteran-owned small business, and women-owned small business concerns. The federal agency issuing this solicitation is the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 J
1. REQUISITION NUMBER
FD20302200012 03
5. SOLICITATION NUMBER
FA8122-24-R-0003
6. SOLICITATION ISSUE DATE
b. TELEPHONE NUMBER (No collect calls) (405 ) 734 -4620 ext.
2. CONTRACT NO.
7. FOR SOLICITATION
INFORMATION CALL
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
a. NAME
William Loftis Jr.
8. OFFER DUE DATE/LOCAL TIME
15JUL2024 3:00PM
12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.
UNLESS BLOCK IS MARKED
SEE SCHEDULE
10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED
BUSINESS SMALL BUSINESS PROGRAM
NAICS CODE:
SERVICE-DISABLED EDWOSB 336412
VETERAN-OWNED SIZE STANDARD
SMALL BUSINESS 8 (A) 1,500 :
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS
(15 CFR 700)
13b. RATING
DO: A1 52.211-14, 52.211-15
14. METHOD OF SOLICITATION
RFQ IFB RFP
9. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZAAB
3001 STAFF DR STE 1AG1 98C
TINKER AFB OK 73145-3303
BUYER: William Loftis Jr./AFSC/PZAAB william.loftis@us.af.mil Phone: (405) 734- 4620
15. DELIVER TO CODE
SEE LINE ITEM SCHEDULE
16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR FACILITY
CODE CODE
18a. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED. SEE ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, CLAUSE 252.232-7003.
FA8122
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
T53 REPAIR CONTRACT - COMMERCIAL, REQUIRMENTS, HUBZONE, SOLE-SOURCE.
BASIC YEAR 00/00/2024 – 00/00/2025 $0.00
OPTION YR I 00/00/2025 – 00/00/2026 $0.00
OPTION YR II 00/00/2026 – 00/00/2027 $0.00
OPTION YR III 00/00/2027 – 00/00/2028 $0.00
OPTION YR IV 00/00/2028 – 00/00/2029 $0.00
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
26. AWARD AMOUNT (For Gov’t use only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO
ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
X X
X X
X
X
25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE
X
SCD:B
EFT:T
Total
STANDARD FORM 1449 (REV. 2/2012) BACK
COMPUTER GENERATED 6/14/2024, 2:28 PM
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
32c. DATE
41c. DATE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER36. PAYMENT
COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
FA8122-24-R-0003
SUPPLIES OR SERVICES AND PRICES/COSTS
This is a service contract for a requirement's type, commercial, repair and/or overhaul on Multiple NSNs of the T53 Helicopter engine as specified in the attachments and this schedule. This is a Contractor Furnished Material (CFM) effort. The contractor shall be a Certified Honeywell Service Center & shall furnish all required labor, facilities, equipment and all material to accomplish overhaul or repair, test, preservation, packaging, and return of completely serviceable items to the Government of the Air Force equipment listed below, all in accordance with the provisions herein and the Work Specifications attached.
The Best Estimated Quantities (BEQs) set forth in Section B of this solicitation represent the estimated total annual quantity the Government expects to generate and place orders for repair. Failure of the Government to furnish such items in the amounts or quantities described in the schedule will not entitle the contractor to any equitable adjustment in price. Condemned items will not be counted as production. This requirement will have a one-year ordering period with four one-year options. In addition, an Option, up to six-months may be extended IAW FAR Clause 52.217-8 – Option to Extend Services, as needed.
DELIVERY: As mentioned above, the BEQs set forth in Section B of this solicitation represent the estimated total annual quantities the Government expects to generate and place orders for repair. Each line item in Section B lists the BEQs for each NSN for the specified ordering periods; although the actual Delivery Schedule will be established on each issued Delivery Order with a required delivery of all repaired assets in 45 calendar days after receipt of order or assets; whichever is later. Early deliveries are encouraged and acceptable.
NOTES:
1. Some units of items listed below may, upon disassembly and/or inspection, be determined to be beyond repairable limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond repairable limits, shall be included in the unit price(s) of the listed item(s). CONDEMNED UNITS WILL NOT BE COUNTED
AS PRODUCTION.
2. GOVERNMENT PROPERTY FURNISHED FOR REPAIR (IAW FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
3. RE: DFARS Clause 252.211-7003 - ITEM UNIQUE IDENTIFICATION (IUID) STANDARDS - the NSNs in this requirement are listed as Item Unique Identifier (IUID) candidates by the Government Program Manager. The Contractor is required to IUID mark the parts as the Government and the Contractor have agreed upon. Bag & Tag is acceptable.
4. Transportation requirements are found on (DD Form 1653) as attached- all DATA requirements as applicable with CLINs 0015-4015 and all associated CDRLS (Forms 1423s) will be accepted by the QAR at contractor facility – FOB: Origin for quantitative purposes only. The quality will be assessed by PMS as stated in the schedule for the DATA associated.
5. The Repair / Overhaul as shown in Schedule B of this contract will be in accordance with Honeywell current specs & approved engineering rework processes due to the QRs of the source of this contract being with an approved Honeywell Service Center.
6. In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.
7. Pooling of Hardware as used for improved turnaround time, is an acceptable practice.
8. Delivery schedule shall be defined by each individual task order, but will include a FOB origin, commencing 45 days ARO or receipt of reparable; whichever is later.
9. Mint Turbine is ISO 9001:2008 and AS9100 Rev C certified, and the QAR will conduct inspections in compliance with these requirements.
BASIC YEAR - DRIVE ASSEMBLY,OVER
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 2840-00-893-3787 NL
DRIVE ASSEMBLY,OVER
To stop engine from entering an excessive RPM state Cast Aluminum casing Manufacturer Part Number 520B3 1-160-500-04 Associated Document(s) Line Item(s)
FD20302200012 03 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2015 2008
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAM
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
BASIC YEAR - DRIVE ASSEMBLY,OVER
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
Early Deliveries are Acceptable.
Please contact your PMS/SP for Shipping Instructions prior to shipment.
BASIC YEAR - MANIFOLD ASSEMBLY,C
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 2840-00-960-0174 NL
MANIFOLD ASSEMBLY,C
Supply fuel to combustion chamber Steel Manufacturer Part Number 520B3 1-130-730-02 Associated Document(s) Line Item(s)
FD20302200012 03 0002
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAI
BASIC YEAR - MANIFOLD ASSEMBLY,C
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - CASE,COMPRESSOR,AIR
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0003 AA
NSN: 2840-01-008-5729 NL
CASE,COMPRESSOR,AIR
Houses Compressor Rotor to build compression within the engine.
Steel Manufacturer Part Number
08HK5 1-101-210-04
520B3 1-101-210-04 57784 1-101-210-04 99193 1-101-210-04 L5139 1-101-210-04 Associated Document(s) Line Item(s)
FD20302200012 03 0003
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
BASIC YEAR - CASE,COMPRESSOR,AIR
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAP
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - VALVE,SOLENOID
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0004 AA
NSN: 4810-00-906-2326 NL
VALVE,SOLENOID
TO CONTROL ENGINE BLEED AIR
E2047 STAINLESS STEEL
Manufacturer Part Number 520B3 1-300-194-03 Associated Document(s) Line Item(s)
FD20302200012 03 0004
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAD
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0005 AA
NSN: 4810-00-068-6712 NL
VALVE,SOLENOID
CONTROL OF BLEED AIR
E2047 STAINLESS STEEL
Manufacturer Part Number 520B3 1-300-194-04 Associated Document(s) Line Item(s)
FD20302200012 03 0005
Priority: R
BASIC YEAR - VALVE,SOLENOID
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAE
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - ACTUATOR ASSEMBLY,I
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0006 AA
NSN: 2840-00-924-8648 NL
ACTUATOR ASSEMBLY,I
Change pitch of Inlet Guide Vanes for varying air flows Cast aluminum Manufacturer Part Number
BASIC YEAR - ACTUATOR ASSEMBLY,I
520B3 1-180-150-01 Associated Document(s) Line Item(s)
FD20302200012 03 0006
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAC
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - HOUSING ASSY,INLET
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0007 AA
NSN: 2840-00-925-4186 NL
BASIC YEAR - HOUSING ASSY,INLET
HOUSING ASSY,INLET
Directs Air to the Compressor of the T53 Engine Aluminum Manufacturer Part Number
05KC3 1-060-220-03
08HK5 1-060-220-03
520B3 1-060-220-03 57784 1-060-220-03 99193 1-060-220-03 L5139 1-060-220-03 Associated Document(s) Line Item(s)
FD20302200012 03 0007
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAG
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - FUEL CONTROL,MAIN
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
8 EA
CLIN ACRN ACRN Total
0008 AA
GROUP STOCK NO P/N CAGE
Group 001 Input 2915-01-459-8654 1-170-240-93 And/Or
2915-01-459-8654 1-170-780-01 And/Or 2915-01-459-8654 1-170-780-01
GROUP STOCK NO P/N CAGE
Group 001 Output 2915-01-459-8654 1-170-780-01
NSN: 2915-01-459-8654 NL
FUEL CONTROL,MAIN,T
It takes N1 speed, inlet air temp and pressure and supplies the correct metered fuel to the flow divider/fuel manifold.
Aluminum
Early Deliveries are Acceptable.
Please contact your PMS/SP for Shipping Instructions prior to shipment.
Manufacturer Part Number 520B3 1-170-780-01 54F07 1-170-780-01 Associated Document(s) Line Item(s)
FD20302200012 03 0008
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Delivery
1 EA *45 Calendar Days
Proposed Delivery
1 EA
BASIC YEAR - INFORMATIONAL CLIN - SPEED GOVERNOR
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
EA
CLIN ACRN ACRN Total
0009 AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
THE OVERSPEED GOVERNOR ACTS AS A FUEL FLOW LIMITING DEVICE TO PROTECT THE ENGINE POWER TURBINE SYSTEM FROM EXCESSIVE OVERSPEED IN THE EVENT OF A PROPELLER GOVERNOR FAILURE. THE OVERSPEED GOVERNOR PROVIDES THE FUEL
CONTROL WITH AN N2 SPEED SIGNAL. F
Unknown Manufacturer Part Number 520B3 1-160-850-23 99193 1-160-850-23 L5139 1-160-850-23 Associated Document(s) Line Item(s)
FD20302200012 03 0009
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 EA
Proposed Period of Performance
A SW3211 EA
BASIC YEAR - SPEED GOVERNOR (LESS THAN 2,500 HOURS)
0009AA
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
0009AA AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
Manufacturer Part Number 520B3 1-160-850-23 99193 1-160-850-23 L5139 1-160-850-23 Associated Document(s) Line Item(s)
FD20302200012 03 0009AA
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - SPEED GOVERNOR (GREATER THAN 2,500 HOURS)
0009AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
4 EA
CLIN ACRN ACRN Total
0009AB AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
Manufacturer Part Number 520B3 1-160-850-23 99193 1-160-850-23 L5139 1-160-850-23 Associated Document(s) Line Item(s)
FD20302200012 03 0009AB
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASE YEAR - GEARBOX,ACCESSORY D
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
0010 AA
NSN: 2840-01-331-3053 NL
GEARBOX,ACCESSORY D
To deliver engine torque to drive engine accessories.
Mag Thorium Manufacturer Part Number
08HK5 1-080-250-25
520B3 1-080-250-25 99193 1-080-250-25 L5139 1-080-250-25 Associated Document(s) Line Item(s)
FD20302200012 03 0010
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAN
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASE YEAR - ACTUATOR ASSEMBLY, I
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
0011 AA
NSN: 2995-01-008-7763 NL
ACTUATOR ASSEMBLY,I
Actuate bleed ports to control air flow Cast aluminum Manufacturer Part Number
08HK5 1-170-050-12
520B3 1-170-050-12 99193 1-170-050-12 Associated Document(s) Line Item(s)
FD20302200012 03 0011
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAF
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASE YEAR - CARRIER AND GEAR
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0012 AA
NSN: 2840-01-459-1267 NL
CARRIER AND GEAR
To reduce engine torque and transfer torques to aircraft.
Mag Thorium Manufacturer Part Number 520B3 1-030-350-18 99193 1-030-350-18 L5139 1-030-350-18 Associated Document(s) Line Item(s)
FD20302200012 03 0012
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAK
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed
BASE YEAR - CARRIER AND GEAR
A SW3211 1 EA
BASE YEAR - CARRIER AND GEAR AS
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0013 AA
NSN: 2840-01-462-0765 NL
CARRIER AND GEAR AS
To reduce engine torque and transfer torques to aircraft.
Mag Thorium Manufacturer Part Number
08HK5 1-030-350-19
520B3 1-030-350-19 99193 1-030-350-19 Associated Document(s) Line Item(s)
FD20302200012 03 0013
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAL
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
BASE YEAR - CARRIER AND GEAR AS
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - PUMP,ROTARY
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
0014 AA
NSN: 4320-01-182-9057 NL
PUMP,ROTARY
To pressurize and scavenge the oil system Cast aluminum with Steel internal parts Manufacturer Part Number 520B3 1-300-212-04 99193 1-300-212-04 L5139 1-300-212-04 Associated Document(s) Line Item(s)
FD20302200012 03 0014
Priority: R
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
A SW3211 PAH
BASIC YEAR - PUMP,ROTARY
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - VALVE,LINEAR,DIRECT
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
0015 AA
NSN: 2840-00-782-1771 NL
VALVE,LINEAR,DIRECT
Drain combustion area of fuel at shutdown Aluminum and Steel Manufacturer Part Number
08HK5 1-180-190-03
520B3 1-180-190-03 99193 1-180-190-03 Associated Document(s) Line Item(s)
FD20302200012 03 0015
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
BASIC YEAR - VALVE,LINEAR,DIRECT
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAO
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
BASIC YEAR - DATA
Not Separately Priced Quantity U/I Unit Price
LO NSP
Data IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD-1423 ATTACHMENT C, ATTACHED AND MADE A PART
HEREOF.
CLIN 0016 – 4016 DATA
AND REPORTS
Provide data reporting in accordance with DD Form 1423-1 [CDRLs, Contract Data Requirements List] and DD Form 1664 [DIDs, Data Item Description]:
CDRL Report Frequency Reference
A001 CAVAF Reporting /CFM End Item Reporting
Daily (Data to be current w/in 24 hrs.
of occurrence)
See Block 16
PWS 2.2.2.6
A002 Contract Depot Maintenance (CDM) Monthly Production Report
Monthly PWS
-DI-PSSS-81995A
A003 Government Property (GP) Inventory Report
Annually PWS-DI-MGMT-80 441D
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
BASIC YEAR - OVER AND ABOVE
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
Over and Above Associated Document(s) Line Item(s)
FD20302200012 03 0017
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) *ARO As negotiated by ACO/PCO.
Req No / Pri
Required Delivery
A SW3211 1 LO *45 Calendar Days
Proposed Delivery
A SW3211 1 LO
OPTION YEAR 1 - DRIVE ASSEMBLY,OVER
OPTION YEAR 1 - DRIVE ASSEMBLY,OVER
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1001 AA
NSN: 2840-00-893-3787 NL
DRIVE ASSEMBLY,OVER
To stop engine from entering an excessive RPM state Cast Aluminum casing Manufacturer Part Number 520B3 1-160-500-04 Associated Document(s) Line Item(s)
FD20302200012 03 0001
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAM
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - MANIFOLD ASSEMBLY,C
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1002 AA
NSN: 2840-00-960-0174 NL
MANIFOLD ASSEMBLY,C
Supply fuel to combustion chamber Steel Manufacturer Part Number 520B3 1-130-730-02 Associated Document(s) Line Item(s)
FD20302200012 03 0002
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAM
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - CASE,COMPRESSOR,AIR
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1003 AA
NSN: 2840-01-008-5729 NL
CASE,COMPRESSOR,AIR
Houses Compressor Rotor to build compression within the engine.
Steel Manufacturer Part Number
08HK5 1-101-210-04
520B3 1-101-210-04 57784 1-101-210-04 99193 1-101-210-04 L5139 1-101-210-04 Associated Document(s) Line Item(s)
FD20302200012 03 0003
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAP
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
OPTION YEAR I - VALVE,SOLENOID
Firm Fixed Price Best Estimated Qty
U/I Unit Price Total Estimated Cost
1 EA
CLIN ACRN ACRN Total
1004 AA
NSN: 4810-00-906-2326 NL
VALVE,SOLENOID
TO CONTROL ENGINE BLEED AIR
E2047 STAINLESS STEEL
Manufacturer Part Number 520B3 1-300-194-03 Associated Document(s) Line Item(s)
FD20302200012 03 0004
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAD
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of
OPTION YEAR I - VALVE,SOLENOID
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1005 AA
NSN: 4810-00-068-6712 NL
VALVE,SOLENOID
CONTROL OF BLEED AIR
E2047 STAINLESS STEEL
Manufacturer Part Number 520B3 1-300-194-04 Associated Document(s) Line Item(s)
FD20302200012 03 0005
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAE
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of
A SW3211 1 EA *45 Calendar Days
OPTION YEAR I - VALVE,SOLENOID
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - ACTUATOR ASSEMBLY,I
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1006 AA
NSN: 2840-00-924-8648 NL
ACTUATOR ASSEMBLY,I
Change pitch of Inlet Guide Vanes for varying air flows Cast aluminum Manufacturer Part Number 520B3 1-180-150-01 Associated Document(s) Line Item(s)
FD20302200012 03 0006
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAC
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1
OPTION YEAR I - ACTUATOR ASSEMBLY,I
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - HOUSING ASSY,INLET
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1007 AA
NSN: 2840-00-925-4186 NL
HOUSING ASSY,INLET
Directs Air to the Compressor of the T53 Engine Aluminum Manufacturer Part Number
05KC3 1-060-220-03
08HK5 1-060-220-03
520B3 1-060-220-03 57784 1-060-220-03 99193 1-060-220-03 L5139 1-060-220-03 Associated Document(s) Line Item(s)
FD20302200012 03 0007
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
OPTION YEAR I - HOUSING ASSY,INLET
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAG
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Delivery
A SW3211 1 EA *45 Calendar Days
Proposed Delivery
A SW3211 1 EA
OPTION YEAR I - FUEL CONTROL,MAIN
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
8 EA
CLIN ACRN ACRN Total
1008 AA
NSN: 2915-01-459-8654 NL
FUEL CONTROL,MAIN,T
It takes N1 speed, inlet air temp and pressure and supplies the correct metered fuel to the flow divider/fuel manifold.
Aluminum Manufacturer Part Number 520B3 1-170-780-01 54F07 1-170-780-01 Associated Document(s) Line Item(s)
FD20302200012 03 0008
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
OPTION YEAR I - FUEL CONTROL,MAIN
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAJ
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Delivery
A SW3211 1 EA *45 Calendar Days
Proposed Delivery
A SW3211 1 EA
OPTION YEAR I - INFORMATIONAL CLIN - SPEED GOVERNOR
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
EA
CLIN ACRN ACRN Total
1009 AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
THE OVERSPEED GOVERNOR ACTS AS A FUEL FLOW LIMITING DEVICE TO PROTECT THE ENGINE POWER TURBINE SYSTEM FROM EXCESSIVE OVERSPEED IN THE EVENT OF A PROPELLER GOVERNOR FAILURE. THE OVERSPEED GOVERNOR PROVIDES THE FUEL
CONTROL WITH AN N2 SPEED SIGNAL. F
Unknown Manufacturer Part Number 520B3 1-030-350-18 99193 1-160-850-23 L5139 1-030-350-18 Associated Document(s) Line Item(s)
FD20302200012 03 0009
OPTION YEAR I - INFORMATIONAL CLIN - SPEED GOVERNOR
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 EA
Proposed Period of Performance
A SW3211 EA
OPTION YEAR I- SPEED GOVERNOR (LESS THAN 2,500 HOURS)
1009AA
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
3 EA
CLIN ACRN ACRN Total
1009AA AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
Manufacturer Part Number 520B3 1-160-850-23 99193 1-160-850-23 L5139 1-160-850-23 Associated Document(s) Line Item(s)
FD20302200012 03 0009AA
OPTION YEAR I- SPEED GOVERNOR (LESS THAN 2,500 HOURS)
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Delivery
A SW3211 1 EA *45 Calendar Days
Proposed Delivery
A SW3211 1 EA
OPTION YEAR I - SPEED GOVERNOR(GREATER THAN 2,500 HOURS)
1009AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
1009AB AA
NSN: 2915-01-459-3428 NL
SPEED GOVERNOR
Manufacturer Part Number 520B3 1-160-850-23 99193 1-160-850-23 L5139 1-160-850-23 Associated Document(s) Line Item(s)
FD20302200012 03 0009AB
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Standard Inspection
OPTION YEAR I - SPEED GOVERNOR(GREATER THAN 2,500 HOURS)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Delivery
A SW3211 1 EA *45 Calendar Days
Proposed Delivery
A SW3211 1 EA
OPTION YEAR I - GEARBOX,ACCESSORY D
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1010 AA
NSN: 2840-01-331-3053 NL
GEARBOX,ACCESSORY D
To deliver engine torque to drive engine accessories.
Mag Thorium Manufacturer Part Number
08HK5 1-080-250-25
520B3 1-080-250-25 99193 1-080-250-25 L5139 1-080-250-25 Associated Document(s) Line Item(s)
FD20302200012 03 0010
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
OPTION YEAR I - GEARBOX,ACCESSORY D
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAN
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - ACTUATOR ASSEMBLY,I
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1011 AA
NSN: 2995-01-008-7763 NL
ACTUATOR ASSEMBLY,I
Actuate bleed ports to control air flow Cast aluminum Manufacturer Part Number
08HK5 1-170-050-12
520B3 1-170-050-12 99193 1-170-050-12 Associated Document(s) Line Item(s)
OPTION YEAR I - ACTUATOR ASSEMBLY,I
FD20302200012 03 0011
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAF
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - CARRIER AND GEAR
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1012 AA
NSN: 2840-01-459-1267 NL
CARRIER AND GEAR
To reduce engine torque and transfer torques to aircraft.
OPTION YEAR I - CARRIER AND GEAR
Mag Thorium Manufacturer Part Number 520B3 1-030-350-18 99193 1-030-350-18 L5139 1-030-350-18 Associated Document(s) Line Item(s)
FD20302200012 03 0012
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAK
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - CARRIER AND GEAR AS
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
OPTION YEAR I - CARRIER AND GEAR AS
1 EA
CLIN ACRN ACRN Total
1013 AA
NSN: 2840-01-462-0765 NL
CARRIER AND GEAR AS
To reduce engine torque and transfer torques to aircraft.
Mag Thorium Manufacturer Part Number
08HK5 1-030-350-19
520B3 1-030-350-19 99193 1-030-350-19 Associated Document(s) Line Item(s)
FD20302200012 03 0013
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAL
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - PUMP,ROTARY
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
1014 AA
NSN: 4320-01-182-9057 NL
PUMP,ROTARY
To pressurize and scavenge the oil system Cast aluminum with Steel internal parts Manufacturer Part Number 520B3 1-300-212-04 99193 1-300-212-04 L5139 1-300-212-04 Associated Document(s) Line Item(s)
FD20302200012 03 0014
Priority: R
Inspection: Origin Acceptance: Destination Receiving Report Required Quality Assurance: Commercial Item Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAH
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - VALVE,LINEAR,DIRECT
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
1015 AA
NSN: 2840-00-782-1771 NL
VALVE,LINEAR,DIRECT
Drain combustion area of fuel at shutdown Aluminum and Steel Manufacturer Part Number
08HK5 1-180-190-03
520B3 1-180-190-03 99193 1-180-190-03 Associated Document(s) Line Item(s)
FD20302200012 03 0015
Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAO
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR I - DATA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data 5 Year Estimated Cost:Year 1- Not Separately PricedYear 2- Not Separately PricedYear 3- Not Separately PricedYear 4- Not Separately PricedYear 5- Not Separately Priced
CLIN 0016 – 4016 DATA
AND REPORTS
Provide data reporting in accordance with DD Form 1423-1 [CDRLs, Contract Data Requirements List] and DD Form 1664 [DIDs, Data Item Description]:
CDRL Report Frequency Reference
A001 CAVAF Reporting /CFM End Item Reporting
Daily (Data to be current w/in 24 hrs.
of occurrence)
See Block 16
PWS 2.2.2.6
A002 Contract Depot Maintenance (CDM) Monthly Production Report
Monthly PWS
-DI-PSSS-81995A
A003 Government Property (GP) Inventory Report
Annually PWS-DI-MGMT-80 441D
Associated Document(s) Line Item(s)
FD20302200012 03 0016
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) IAW CDRLS Req No / Pri
Required Delivery
A SW3211 1 LO IAW CDRLS
Proposed Delivery
OPTION YEAR I - OVER AND ABOVE
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
Over and Above Year 1 $100,000Year 2 $100,000Year 3 $100,000Year 4 $100,000Year 5 $100,000Total 5 year $500,000 Associated Document(s) Line Item(s)
FD20302200012 03 0017
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Commercial Item Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) As negotiated by PCO Req No / Pri
Required Delivery
A SW3211 1 LO As negotiated by PCO
Proposed Delivery
OPTION II - DRIVE ASSEMBLY,OVER
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
2001 AA
NSN: 2840-00-893-3787 NL
DRIVE ASSEMBLY,OVER
To stop engine from entering an excessive RPM state
OPTION II - DRIVE ASSEMBLY,OVER
Cast Aluminum casing Manufacturer Part Number 520B3 1-160-500-04 Associated Document(s) Line Item(s)
FD20302200012 03 0001
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAK
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION II - MANIFOLD ASSEMBLY,C
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
OPTION II - MANIFOLD ASSEMBLY,C
2002 AA
NSN: 2840-00-960-0174 NL
MANIFOLD ASSEMBLY,C
Supply fuel to combustion chamber Steel Manufacturer Part Number 520B3 1-130-730-02 Associated Document(s) Line Item(s)
FD20302200012 03 0002
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAM
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION II - CASE,COMPRESSOR,AIR
Firm Fixed Price
OPTION II - CASE,COMPRESSOR,AIR
Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
2003 AA
NSN: 2840-01-008-5729 NL
CASE,COMPRESSOR,AIR
Houses Compressor Rotor to build compression within the engine.
Steel Manufacturer Part Number
08HK5 1-101-210-04
520B3 1-101-210-04 57784 1-101-210-04 99193 1-101-210-04 L5139 1-101-210-04 Associated Document(s) Line Item(s)
FD20302200012 03 0003
Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAP
Place of Perf Quantity (U/I) *ARO Funded Order or Reparable Asset - 1 ea every 45 days
_ Req No / Pri
Required Period of Performance
A SW3211 1 EA *45 Calendar Days
Proposed Period of Performance
A SW3211 1 EA
OPTION YEAR II - VALVE,SOLENOID
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 EA
CLIN ACRN ACRN Total
2004 AA
NSN: 4810-00-906-2326 NL
VALVE,SOLENOID
TO CONTROL ENGINE BLEED AIR
E2047 STAINLESS STEEL
Manufacturer Part Number 520B3 1-300-194-03 Associated Document(s) Line Item(s)
FD20302200012 03 0004
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .