FA812125Q0004-0002.pdf
PDF 675 KB Posted
- Attached to
- Liner, Combustion, Chamber Federal contract opportunity
- Solicitation number
- FA812125Q00040002
About this file
This is Amendment 0002 to solicitation FA812125Q0004 issued by the Department of the Air Force Sustainment Center at Tinker AFB for Combustion Chamber Liners (NSN: 2840-01-449-1573). The amendment extends the proposal due date to March 6, 2025 at 12:00 PM and adds header titles to clarify CLIN descriptions.
The solicitation is for 61 Combustion Chamber Liner parts plus First Article Testing requirements, including 2 test parts and associated test plans/reports. This is a firm-fixed-price contract with award based on lowest price among qualified sources. Parts must be new, unopened, and properly labeled with NSN and contract information. Delivery is required by October 16, 2026 for production units and April 16, 2026 for First Article Test units. The solicitation includes Buy American Act requirements and Higher Level Quality Assurance provisions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Transportation Data Report.pdf | ||
| Item Description Report.pdf | ||
| Packaging Requirement Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8121-25-Q-0004-0002
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
TO BE CITED
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZAAA
3001 STAFF DR STE 1AF1 98C
TINKER AFB OK 73145-3303
BUYER: Dedrian Parmer/AFSC/PZAAA dedrian.parmer@us.af.mil Phone: (405) 406- 2827
7. ADMINISTERED BY (If other than item 6) CODEFA8121
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA812125Q0004
9B. DATED (SEE ITEM 11)
8-JAN-2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 6-MAR-2025 12:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Routine
The purpose of this amendment is to extend the close date and include headings in order to clarify our CLIN titles.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8121-25-Q-0004-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to extend the close date and include headings in order to clarify our CLIN titles.
FIRST: Extend the closing date to 06 March 2025
SECOND: Updated each CLIN's line with a header title.
THIRD: All the other terms and conditions remain in full force and effect.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
LINER,COMBUSTION CH
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
61 EA
NSN: 2840-01-449-1573 NZ
LINER,COMBUSTION CH
detail part that is required for the repair of combustion chamber liner pwa 1042 cobalt Manufacturer Part Number 52661 4084071-01 77445 4084071 77445 4084071-01 Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Government or Commercial Surplus Acceptable Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAB Acct 09 Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
A SW3211 61 EA 16 OCT 2026
Proposed Delivery
A SW3211 61 EA
Parts will be in original unopened package, labeled with the correct part number, NSN and original government contract number.
1st Article Contractor 2 parts part of production
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
NSN: 2840-01-449-1573 NZ
LINER,COMBUSTION CH
Manufacturer Part Number 52661 4084071-01 77445 4084071 77445 4084071-01 Priority: R Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAC First article monitor Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
A SW3211 2 EA 16 APR 2026
Proposed Delivery
A SW3211 2 EA
1st Article Contractor's Test 1ea expended
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
NSN: 2840-01-449-1573 NZ
LINER,COMBUSTION CH
Manufacturer Part Number 52661 4084071-01 77445 4084071 77445 4084071-01 Priority: R Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FA8111 ORIGIN
Type / Ship To PACRN Mark For
A FA8111 PAD
1st Article Contractor's Test 1ea expended
Type / Ship To Quantity (U/I) IAW First article form 260 and CDRL.
Req No / Pri
Required Delivery
A FA8111 1 EA IAW First article form
Proposed Delivery
A FA8111 1 EA
Data - 1st Article Contractor's Test Report
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data First article contractor test plan.
Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For + CNOTE First article monitor.
Type / Ship To Quantity (U/I) IAW First article requirements form and
CDRL.
Req No / Pri
Required Delivery
+ CNOTE 1 LO IAW First article require
Proposed Delivery
+ CNOTE 1 LO
Data - 1st Article Test Plan
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data First article contractor test plan Priority: R
Data - 1st Article Test Plan
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FA8111 ORIGIN
Type / Ship To PACRN Mark For A FA8111 FA Monitor Type / Ship To Quantity (U/I) IAW first article form
260 and CDRL.
Req No / Pri
Required Delivery
A FA8111 1 LO IAW first article form 26
Proposed Delivery
A FA8111 1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + CNOTE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A FA8111
FA8111 AFLCMC LZPED
CP 405 736-7455
3001 STAFF DR STE 1AF1 105A
TINKER AFB OK 73145-3303 73145-3303
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
(IAW FAR 32.706-1(a))
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages 911198_ITMDESC_REPORT.pdf Report
27SEP2024
4014590_PKGRQMT_REPORT.pdf 24SEP2024
4014596_TRNSPDATA_REPORT.pdf 24SEP2024
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
252.215-7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE
CONTRACTORS (JAN 2023)
(IAW DFARS 215.408(6))
Section L – Instructions to Offerors
14. Program Structure and Objective
13. The Government plans to award a single contract for the Overhaul of the F100-PW-229 Combustion Chamber Liner. This firm-fixed-price type contract is for a one-time purchase.
2.0 General Instructions.
2.1. This competitive acquisition will be conducted utilizing price as the only evaluated factor.
Contract award will be made to the offeror with the lowest total evaluated price (TEP). The offer shall be compliant with the requirements as stated in the Statement of Work (SOW).
Non-conformance with the instructions provided in the Instructions to Offeror (ITO) may result in an offeror being ineligible for award. Offerors shall provide evidence of qualification in accordance with FAR 52.209-1.
2.1.1. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
2.1.2. The proposal acceptance period is specified in SF 1447 Section A (Block 18) of the contract/solicitation. By signing the Request for Proposal (RFP), the offeror has made a clear statement that the proposal is valid until the date specified.
2.2. General Information
2.2.1. Point of Contact
The Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the CO. Written requests for clarification may be sent to the CO at the address located in SF 1447 Section A (Block 7) of the contract/solicitation.
2.2.2. Debriefings
The CO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505.
Offerors excluded from the competitive range may request a pre-award debriefing, or they may choose to wait until after the source selection decision to request a post-award debriefing.
However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in accordance with FAR
15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing.
Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
3.0. Factor 1 - Price
3.1. The offeror shall complete Schedule of Supplies or Services and Prices/Costs of the solicitation to include all unit prices and extended prices for each CLIN and/or SubCLIN. These instructions are to assist you in submitting information required to evaluate the reasonableness of your proposed prices/costs. Compliance with these instructions is mandatory and failure to comply may result in rejection of your proposal.
3.1.1. Price Reasonableness and Balance
Offerors’ proposals will be evaluated for reasonableness and balance. The burden of proof for credibility of proposed prices rests with the offeror. Additionally, unbalanced pricing may pose an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal.
3.2. Pricing Information Requirements
In accordance with FAR 15.403-1(b)(1), prices based on adequate price competition do not require submission of certified cost or pricing data. If, after receipt of proposals, there is insufficient information available to determine price reasonableness and balance, the offeror may be required to submit other than certified cost or pricing data. FAR does not preclude the requirement for obtaining other than certified cost or pricing data under certain circumstances, and the Government reserves the right to obtain data as appropriate. If, after receipt of proposals, the CO determines there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit certified cost or pricing data.
4.0. Solicitation Requirements
4.1. Solicitation/Contract Form SF 1447
The offeror shall complete Blocks 13 and 27 of the SF1447. Signature by the offeror on the SF1447 constitutes an offer, which the Government may accept.
4.1.1. Supplies or Services and Prices/Costs
The offeror shall complete pricing information in Supplies or Services and Prices/Costs section of the solicitation.
4.1.2. Contract Clauses
The offeror shall complete provisions/clauses as required.
4.1.3. Representations, Certifications, and other Statements of Offerors
The Offeror has completed the annual representations and certifications electronically via the System for Award Management (SAM). After reviewing the SAM database information, the Offeror verifies by submission of this offer that the representations and certifications currently posted electronically at FAR 52.204-8, Annual Representations and Certifications, are correct.
4.2. Ombudsman
An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The Ombudsman for this acquisition is OC-ALC/PZC. This does not diminish the authority of the program director or CO, but communicates offeror concerns, issues, disagreements and recommendations to the appropriate Government personnel. When requested, the Ombudsman shall maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process; interested parties are invited to call OC-ALC/PZC at 405-736-3273.
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION M
EVALUATION FACTORS FOR AWARD
Section M - Evaluation Factors for Award
1.0. Price-Only Competition
Basis for Contract Award This acquisition will utilize price as the only evaluated factor. Award will be made to the offeror with the lowest total evaluated price (TEP) and whose proposal conforms to the solicitation requirements (to include all stated terms, conditions, representations, and certifications). In order to be eligible for award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government reserves the right to award without discussions.
However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
14. Solicitation Requirements (Terms and Conditions) Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, Performance Work Statement (PWS), in addition to the price factor. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.
1.2 Number of Contracts to Be Awarded
The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.
1.3 Competitive Range Determination
If discussions are conducted, the Government shall establish a competitive range comprised of the most highly rated proposals, in accordance with (IAW) FAR 15.306(c). During the evaluation process multiple competitive range determinations may be made that eliminate Offerors from the competition IAW FAR 15.505. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range they may request a debriefing IAW FAR 15.505.
Discussions The Government intends to award without discussions, but reserves the right to conduct discussions if necessary. Therefore, it is imperative that Offerors submit their best terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussions, the contracting officer may request, or allow for offerors to provide, proposal revisions to clarify and document understandings reached during discussions. At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a FPR. The Request for FPR letter will include specific instructions on how offerors will submit FPRs.
2.0. Evaluation Factor
2.1. Factor 1- Price
Price proposals will be evaluated as follows:
2.1.1. Completeness
Proposals will be reviewed for completeness. Incomplete proposals will be considered ineligible for award.
2.1.2. Price Reasonableness
The proposed prices will be evaluated for reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business.
Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1(b)(2).
2.1.3. Unbalanced pricing
Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced.
Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items (including sub line items) is significantly over or understated as demonstrated by application of price analysis techniques, such that:
15. There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced Offeror; or
16. The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.
2.1.4. Total Evaluated Price (TEP):
The TEP will be calculated as the sum of the total proposed prices for all separately priced line items (including sub line items). The total proposed price for each separately priced line item shall be calculated as the proposed unit price multiplied by the corresponding quantity/BEQ.
The total proposed price for all options will be added to the total proposed price for the basic requirement as a part of the TEP calculation.
TEP will be used for evaluation purposes only. Evaluation of options shall not obligate the Government to exercise such options.
The TEP will be calculated as the sum of the offeror’s proposed prices for the base period and all option periods.
File details come from the government source that posted it. Updated .