3706101_ATTACH.pdf

PDF 21 KB Posted

Attached to
New Manufacture Lock Ring, Turbine N
Solicitation number
FA8121-24-Q-0011
Issued by

About this file

This document is a Data Item Description (DID) that establishes the test procedures, test equipment, and inspection criteria to be used by the contractor for first article qualification testing.

The DID outlines the required content for the First Article Qualification Test Plan and Procedures, including the purpose of the test, applicable documents, description of units to be tested, detailed test procedures, and the inspection criteria that defines the minimum performance requirements the unit under test must meet. The DID is applicable to the federal contract opportunity for the new manufacture of Lock Ring, Turbine N, solicitation number FA8121-24-Q-0011 issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation requests quotes that will be accepted on or before the closing date stated on the bottom of page 2, with no late quotes accepted.

View the file

Other files

File Type Posted
FA812124Q0011.pdf PDF
3706102_ATTACH.pdf PDF
0001_ReqInfoSurplusMaterialEval.pdf PDF
3702250_CDRL1_REPORT.pdf PDF
3716064_PKGRQMT_REPORT.pdf PDF
3716063_TRNSPDATA_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .