FA812120R0002.pdf
PDF 203 KB Posted
- Solicitation number
- FA8121-20-R-0002
About this file
This combined synopsis and solicitation requests proposals for a firm fixed price requirements contract to repair and overhaul Augmentor Fuel Controls and Pumps for the F100-PW-229 engine. The Air Force Sustainment Center intends to negotiate a five-year contract with Hamilton Sundstrand, including a three-year basic period and two one-year options. The contractor shall provide repair and overhaul services at the unit prices proposed for line items covering controls, pumps, and potential over and above work. There is no small business set-aside. Offerors shall hold proposed prices firm for 180 days and furnish all items subject to terms specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USAF CDRLs.pdf | ||
| RQR.pdf | ||
| USAFPackaging.pdf | ||
| IUID NSN 7888.pdf | ||
| PWSRev5.pdf | ||
| ExhibitAPricingMatrix.xlsx | XLSX spreadsheet | |
| GFPAtch.pdf | ||
| FMSPackaging.pdf | ||
| WD15-4092.txt | TXT text file | |
| USAFTransporation.pdf | ||
| IUID NSN 2141.pdf | ||
| FMSCDRLsDIDs.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 J
1. REQUISITION NUMBER
FD20301900566
5. SOLICITATION NUMBER
FA8121-20-R-0002
6. SOLICITATION ISSUE DATE
b. TELEPHONE NUMBER (No collect calls) (405 ) 739 -7594 ext.
2. CONTRACT NO.
7. FOR SOLICITATION
INFORMATION CALL
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
a. NAME
Linda Wingenbach
8. OFFER DUE DATE/LOCAL TIME
17FEB2020 3:00PM
12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.
UNLESS BLOCK IS MARKED
SEE SCHEDULE
10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED
BUSINESS SMALL BUSINESS PROGRAM
NAICS CODE:
SERVICE-DISABLED EDWOSB 336412
VETERAN-OWNED SIZE STANDARD
SMALL BUSINESS 8 (A) 1,500 :
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS
(15 CFR 700)
13b. RATING
DO: A1 52.211-14, 52.211-15
14. METHOD OF SOLICITATION
RFQ IFB RFP
9. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZAAA
3001 STAFF DR STE 1AF1 98C
TINKER AFB OK 73145-3303
BUYER: Linda Wingenbach/AFSC/PZAAA linda.wingenbach@us.af.mil Phone: (405) 739- 7594
15. DELIVER TO CODE
SEE LINE ITEM SCHEDULE
16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR FACILITY
CODE CODE
18a. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED.
FA8121
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
FMS REQUIREMENT
Routine Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.
Firm Fixed Price Requirements Type Contract to repair and/or overhaul Augmentor Fuel Control (AFC) and Augmentor Fuel Pump (AFP); three-year basic and two 1-year option periods Basic Period Year I: $TBD (DD MMM YYYY - DD MMM YYYY) Basic Period Year II: $TBD (DD MMM YYYY - DD MMM YYYY) Basic Period Year III: $TBD (DD MMM YYYY - DD MMM YYYY) Option I Year IV: $TBD (DD MMM YYYY - DD MMM YYYY) Option II Year V: $TBD (DD MMM YYYY - DD MMM YYYY)
EST TOTAL............... $TBD
RIC: TBD, EZ Code: TBD Includes USAF & FMS Requirements Critical Safety Items
SEE LINE ITEM SCHEDULE
26. AWARD AMOUNT (For Gov’t use only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO
ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
X X
X X
X
25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE
X
SCD:B
EFT:T
Total
STANDARD FORM 1449 (REV. 2/2012) BACK
COMPUTER GENERATED 1/13/2020, 1:12 PM
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
32c. DATE
41c. DATE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER36. PAYMENT
COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary)
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
FA8121-20-R-0002
SUPPLIES OR SERVICES AND PRICES/COSTS
PURPOSE
The Contractor shall provide the minimum work requirements to return the F100-PW-229 Augmentor Fuel Control (AFC) and Augmentor Fuel Pump (AFP) to a serviceable condition as defined in the attached Performance Work Statement (PWS). This Firm Fixed Price Requirements-Type contract is for a 3-year basic contract period and two 1-year option periods.
This requirement supports both USAF and FMS customers.
Ordering Period:
Period From: To:
Basic Period Year I TBD TBD
Basic Period Year II TBD TBD
Basic Period Year III TBD TBD
Option I, Year IV TBD TBD
Option II, Year V TBD TBD
Government Furnished Material shall not be provided. Contractor Furnished Material is required for all repairs/overhauls described herein.
Condemnations will be replaced. Condemnations will not count toward deliveries. Cost of condemnations will be included in the unit price.
If the contractor estimates the total cost of the repair and/or overhaul of any end items received will exceed 75% of the Stock List Price, the Contractor shall promptly notify the Administrative Contracting Officer (ACO) in writing and shall not perform further services on any such items except at the direction of the ACO. Upon receipt of the written notification that a particular item is not repairable, the Contractor shall dispose of the unit in the manner directed by the ACO.
The Procuring Contracting Officer (PCO) may authorize the Contractor, through the ACO, to exceed the percentage of the Stock List Price when an item is in critical supply status.
Upon request, serviceable units will be shipped from the contractor to the user using Shipment by Fast Transportation. Accelerated Deliveries are acceptable at no additional cost to the Government.
Qualification Requirements apply to this procurement.
The Overhaul work scope for the AFC and APC include replacement of the Hydraulic Housing and Sequence Piston Assembly (P/N 801038-1).
IAW FAR 16.503 (c) Government property furnished for repair. When a requirements contract is used to acquire work (e.g.,repair, modification, or overhaul) on existing items of Government property, the contracting officer shall specify in the Schedule that failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
Pricing: The Contractor shall complete and provide pricing under ELINs listed under Exhibit A, Pricing Matrix.
Pricing Efforts After Contract Award: For all over and above efforts and contract modifications, in order for the Government to make a determination of price reasonableness, IAW FAR 13.106-3, 14.408-2, and 15.4, contractor shall provide as other than certified cost or pricing data: commercial item prices and supporting data to be used for Government price analysis to include: speed of delivery, length and extent of warranty, limitations of seller’s liability, quantifies ordered, length of performance period, and specific performance requirements. For similar items, contractors shall provide information regarding similarity and adjustment for differences. Contractor shall provide any other basis information as determined reasonable necessary by the PCO. Contractor shall allow Government representatives to verify sales history to all available source documents/invoices to determine if sales occurred at the prices in the published price list. Contractor shall allow Government representatives to validate partnering arrangement transactions as necessary to ensure Government commercial prices paid reflect industries’ commercial prices paid. For commercial items with no historical sales data, proposal shall include: number and type of personnel for each task, hourly rates, indirect rates (overheads, G&A, etc.), profit and supply chain management cost data as determined necessary by the PCO. Contractor shall provide technical support/analysis for items “similar to” commercial items or “of a type” of commercial items to address modification to commercial products. Contractor shall disclose: discounts and rebate arrangements applicable to commercial sales data and commercial practices including revenue sharing arrangement(s) and/or partnering with sellers to support the basis for commercial prices proposed to the Government.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR I, USAF
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
72 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR I, USAF
Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A".
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)
FD20301900566 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 2008 or equivalent
Buy American Act/Balance of Payments Program IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days Non-MilStrip
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 3 each per month and continue at that rate until deliveries are completed.
Accelerated and early delivery is acceptable.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL PUMP
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
72 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 2915-01-309-7888 NZ
Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A".
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)
FD20301900566 0002
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 3 each per month and continue at that rate until deliveries are completed.
OVER AND ABOVE
Firm Fixed Price Quantity U/I Estimated Unit Price Not to Exceed Price 1 LO To be Negotiated if
Necessary
OVER AND ABOVE
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR I, FMS
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
0004 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A".
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)
FD20301930173 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Foreign Military Sales :FMS Case:
Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days Non-MilStrip
Proposed Delivery
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 1 each per month and continue at that rate until deliveries are completed.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
0005 AA
NSN: 2915-01-309-7888 NZ
Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A".
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)
FD20301930173 0002
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days
Proposed Delivery
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
OVER AND ABOVE
Item No.
Firm Fixed Price Quantity U/I Estimated Unit Price Not to Exceed Price 1 LO To be Negotiated if
Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
DATA - USAF
Item No.
Firm Fixed Price Quantity U/I Total Price 1 LO Not Separately Priced
DATA - FMS
Item No.
Firm Fixed Price Quantity U/I Total Price 1 LO Not Separately Priced
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR II, USAF
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
CLIN ACRN ACRN Total
1001 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A".
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
CLIN ACRN ACRN Total
1002 AA
NSN: 2915-01-309-7888 NZ
Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if
Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR II, FMS
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
1004 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR II, FMS
Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days
Proposed
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
1005 AA
NSN: 2915-01-309-7888 NZ
Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days
Proposed Delivery
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if
Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR III, USAF
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR III, USAF
CLIN ACRN ACRN Total
2001 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)
FD20301900566 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001-2008 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
CLIN ACRN ACRN Total
2002 AA
NSN: 2915-01-309-7888 NZ
Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)
FD20301900566 0002
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if
Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
BASIC PERIOD YEAR III, FMS
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
2004 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)
FD20301930173 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days
Proposed Delivery
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
2005 AA
NSN: 2915-01-309-7888 NZ
AUGMENTOR FUEL PUMP
Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number
73030 4071353 Associated Document(s) Line Item(s)
FD20301930173 0002
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
A TBC AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
A TBC 1 EA *30 Calendar Days
Proposed Delivery
A TBC 1 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if
Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
OPTION I YEAR IV, USAF
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
CLIN ACRN ACRN Total
3001 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul
During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.
Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)
FD20301900566 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAD ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
36 EA
CLIN ACRN ACRN Total
3002 AA
NSN: 2915-01-309-7888 NZ
AUGMENTOR FUEL PUMP
Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.
Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.
Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)
FD20301900566 0002
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B SW3211 ORIGIN
Class I ODS Substance Application/Use Quantity
NONE
Type / Ship To PACRN Mark For
B SW3211 AAC ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
_ Req No / Pri
Required Delivery
B SW3211 3 EA *30 Calendar Days
Proposed Delivery
B SW3211 3 EA
Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is
Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price
OVER AND ABOVE
1 LO To be Negotiated if Necessary
Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.
When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.
REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL
OPTION I YEAR IV, FMS
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
6 EA
CLIN ACRN ACRN Total
3004 AA
NSN: 2915-01-310-2141 NZ
Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.
Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.
ELINs described below are found in Section J attachment titled "Exhibit A"
ELIN Title Description
Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.
No repair.
Check and Test and Repair Check and Test the part and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .