FA812120R0002.pdf

PDF 203 KB Posted

Attached to
Overhaul of of F100-PW-229 Augmentor Fuel Control and Augmentor Fuel Pump
Solicitation number
FA8121-20-R-0002
Issued by

About this file

This combined synopsis and solicitation requests proposals for a firm fixed price requirements contract to repair and overhaul Augmentor Fuel Controls and Pumps for the F100-PW-229 engine. The Air Force Sustainment Center intends to negotiate a five-year contract with Hamilton Sundstrand, including a three-year basic period and two one-year options. The contractor shall provide repair and overhaul services at the unit prices proposed for line items covering controls, pumps, and potential over and above work. There is no small business set-aside. Offerors shall hold proposed prices firm for 180 days and furnish all items subject to terms specified in the solicitation.

View the file

Other files

File Type Posted
USAF CDRLs.pdf PDF
RQR.pdf PDF
USAFPackaging.pdf PDF
IUID NSN 7888.pdf PDF
PWSRev5.pdf PDF
ExhibitAPricingMatrix.xlsx XLSX spreadsheet
GFPAtch.pdf PDF
FMSPackaging.pdf PDF
WD15-4092.txt TXT text file
USAFTransporation.pdf PDF
IUID NSN 2141.pdf PDF
FMSCDRLsDIDs.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 J

1. REQUISITION NUMBER

FD20301900566

5. SOLICITATION NUMBER

FA8121-20-R-0002

6. SOLICITATION ISSUE DATE

b. TELEPHONE NUMBER (No collect calls) (405 ) 739 -7594 ext.

2. CONTRACT NO.

7. FOR SOLICITATION

INFORMATION CALL

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER

a. NAME

Linda Wingenbach

8. OFFER DUE DATE/LOCAL TIME

17FEB2020 3:00PM

12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.

UNLESS BLOCK IS MARKED

SEE SCHEDULE

10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED

BUSINESS SMALL BUSINESS PROGRAM

NAICS CODE:

SERVICE-DISABLED EDWOSB 336412

VETERAN-OWNED SIZE STANDARD

SMALL BUSINESS 8 (A) 1,500 :

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS

(15 CFR 700)

13b. RATING

DO: A1 52.211-14, 52.211-15

14. METHOD OF SOLICITATION

RFQ IFB RFP

9. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZAAA

3001 STAFF DR STE 1AF1 98C

TINKER AFB OK 73145-3303

BUYER: Linda Wingenbach/AFSC/PZAAA linda.wingenbach@us.af.mil Phone: (405) 739- 7594

15. DELIVER TO CODE

SEE LINE ITEM SCHEDULE

16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR FACILITY

CODE CODE

18a. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED.

FA8121

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

FMS REQUIREMENT

Routine Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.

Firm Fixed Price Requirements Type Contract to repair and/or overhaul Augmentor Fuel Control (AFC) and Augmentor Fuel Pump (AFP); three-year basic and two 1-year option periods Basic Period Year I: $TBD (DD MMM YYYY - DD MMM YYYY) Basic Period Year II: $TBD (DD MMM YYYY - DD MMM YYYY) Basic Period Year III: $TBD (DD MMM YYYY - DD MMM YYYY) Option I Year IV: $TBD (DD MMM YYYY - DD MMM YYYY) Option II Year V: $TBD (DD MMM YYYY - DD MMM YYYY)

EST TOTAL............... $TBD

RIC: TBD, EZ Code: TBD Includes USAF & FMS Requirements Critical Safety Items

SEE LINE ITEM SCHEDULE

26. AWARD AMOUNT (For Gov’t use only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

X X

X X

X

25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE

X

SCD:B

EFT:T

Total

STANDARD FORM 1449 (REV. 2/2012) BACK

COMPUTER GENERATED 1/13/2020, 1:12 PM

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

32c. DATE

41c. DATE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER36. PAYMENT

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SEE LINE ITEM SCHEDULE

(Attach Additional Sheets as Necessary)

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

FA8121-20-R-0002

SUPPLIES OR SERVICES AND PRICES/COSTS

PURPOSE

The Contractor shall provide the minimum work requirements to return the F100-PW-229 Augmentor Fuel Control (AFC) and Augmentor Fuel Pump (AFP) to a serviceable condition as defined in the attached Performance Work Statement (PWS). This Firm Fixed Price Requirements-Type contract is for a 3-year basic contract period and two 1-year option periods.

This requirement supports both USAF and FMS customers.

Ordering Period:

Period From: To:

Basic Period Year I TBD TBD

Basic Period Year II TBD TBD

Basic Period Year III TBD TBD

Option I, Year IV TBD TBD

Option II, Year V TBD TBD

Government Furnished Material shall not be provided. Contractor Furnished Material is required for all repairs/overhauls described herein.

Condemnations will be replaced. Condemnations will not count toward deliveries. Cost of condemnations will be included in the unit price.

If the contractor estimates the total cost of the repair and/or overhaul of any end items received will exceed 75% of the Stock List Price, the Contractor shall promptly notify the Administrative Contracting Officer (ACO) in writing and shall not perform further services on any such items except at the direction of the ACO. Upon receipt of the written notification that a particular item is not repairable, the Contractor shall dispose of the unit in the manner directed by the ACO.

The Procuring Contracting Officer (PCO) may authorize the Contractor, through the ACO, to exceed the percentage of the Stock List Price when an item is in critical supply status.

Upon request, serviceable units will be shipped from the contractor to the user using Shipment by Fast Transportation. Accelerated Deliveries are acceptable at no additional cost to the Government.

Qualification Requirements apply to this procurement.

The Overhaul work scope for the AFC and APC include replacement of the Hydraulic Housing and Sequence Piston Assembly (P/N 801038-1).

IAW FAR 16.503 (c) Government property furnished for repair. When a requirements contract is used to acquire work (e.g.,repair, modification, or overhaul) on existing items of Government property, the contracting officer shall specify in the Schedule that failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

Pricing: The Contractor shall complete and provide pricing under ELINs listed under Exhibit A, Pricing Matrix.

Pricing Efforts After Contract Award: For all over and above efforts and contract modifications, in order for the Government to make a determination of price reasonableness, IAW FAR 13.106-3, 14.408-2, and 15.4, contractor shall provide as other than certified cost or pricing data: commercial item prices and supporting data to be used for Government price analysis to include: speed of delivery, length and extent of warranty, limitations of seller’s liability, quantifies ordered, length of performance period, and specific performance requirements. For similar items, contractors shall provide information regarding similarity and adjustment for differences. Contractor shall provide any other basis information as determined reasonable necessary by the PCO. Contractor shall allow Government representatives to verify sales history to all available source documents/invoices to determine if sales occurred at the prices in the published price list. Contractor shall allow Government representatives to validate partnering arrangement transactions as necessary to ensure Government commercial prices paid reflect industries’ commercial prices paid. For commercial items with no historical sales data, proposal shall include: number and type of personnel for each task, hourly rates, indirect rates (overheads, G&A, etc.), profit and supply chain management cost data as determined necessary by the PCO. Contractor shall provide technical support/analysis for items “similar to” commercial items or “of a type” of commercial items to address modification to commercial products. Contractor shall disclose: discounts and rebate arrangements applicable to commercial sales data and commercial practices including revenue sharing arrangement(s) and/or partnering with sellers to support the basis for commercial prices proposed to the Government.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR I, USAF

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

72 EA

CLIN ACRN ACRN Total

0001 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR I, USAF

Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A".

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)

FD20301900566 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring ISO 9001-2008 2008 or equivalent

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 3 each per month and continue at that rate until deliveries are completed.

Accelerated and early delivery is acceptable.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL PUMP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

72 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 2915-01-309-7888 NZ

Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A".

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)

FD20301900566 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 3 each per month and continue at that rate until deliveries are completed.

OVER AND ABOVE

Firm Fixed Price Quantity U/I Estimated Unit Price Not to Exceed Price 1 LO To be Negotiated if

Necessary

OVER AND ABOVE

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR I, FMS

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

0004 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A".

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)

FD20301930173 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is later at the rate of 1 each per month and continue at that rate until deliveries are completed.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

0005 AA

NSN: 2915-01-309-7888 NZ

Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions are listed below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A".

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)

FD20301930173 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days

Proposed Delivery

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

OVER AND ABOVE

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Not to Exceed Price 1 LO To be Negotiated if

Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

DATA - USAF

Item No.

Firm Fixed Price Quantity U/I Total Price 1 LO Not Separately Priced

DATA - FMS

Item No.

Firm Fixed Price Quantity U/I Total Price 1 LO Not Separately Priced

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR II, USAF

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

CLIN ACRN ACRN Total

1001 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A".

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

CLIN ACRN ACRN Total

1002 AA

NSN: 2915-01-309-7888 NZ

Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if

Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR II, FMS

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

1004 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR II, FMS

Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days

Proposed

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

1005 AA

NSN: 2915-01-309-7888 NZ

Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days

Proposed Delivery

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if

Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR III, USAF

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR III, USAF

CLIN ACRN ACRN Total

2001 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)

FD20301900566 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

CLIN ACRN ACRN Total

2002 AA

NSN: 2915-01-309-7888 NZ

Augmentor Fuel Pump Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)

FD20301900566 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if

Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

BASIC PERIOD YEAR III, FMS

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

2004 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)

FD20301930173 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days

Proposed Delivery

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

2005 AA

NSN: 2915-01-309-7888 NZ

AUGMENTOR FUEL PUMP

Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number

73030 4071353 Associated Document(s) Line Item(s)

FD20301930173 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBC AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 1 EA *30 Calendar Days

Proposed Delivery

A TBC 1 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 LO To be Negotiated if

Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

OPTION I YEAR IV, USAF

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

CLIN ACRN ACRN Total

3001 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul

During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished. **Overhaul will include replacement of the Hydraulic Housing and Sequence Piston Assembly, P/N 801038-1 and any labor associated with the process.

Manufacturer Part Number 73030 4070290 Associated Document(s) Line Item(s)

FD20301900566 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAD ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

36 EA

CLIN ACRN ACRN Total

3002 AA

NSN: 2915-01-309-7888 NZ

AUGMENTOR FUEL PUMP

Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and Repair, as required, back to serviceable condition.

Check and Test and Overhaul During Check and Test, if it is determined to be more economical to overhaul the part, full overhaul is accomplished.

Manufacturer Part Number 73030 4071353 Associated Document(s) Line Item(s)

FD20301900566 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

B SW3211 AAC ACCT 09

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

B SW3211 3 EA *30 Calendar Days

Proposed Delivery

B SW3211 3 EA

Delivery shall begin within 30 days after receipt of order (ARO) or reparable assets, whichever is

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price

OVER AND ABOVE

1 LO To be Negotiated if Necessary

Over and Above Work items are not included in the scope of the basic work items above. In accordance with DFARS 252.217-7028 "Over and Above Work" required by this CLIN shall be accomplished only when directed and authorized by the ACO/PCO. To the maximum extent practical, over and above work shall be negotiated prior to performance of the work.

When Over and Above Work is negotiated the ACO will issue a modification establishing the quantities for the Over and Above Work items, a definitive delivery schedule and line item price as necessary.

REPAIR AND/OR OVERHAUL OF AUGMENTOR FUEL CONTROL

OPTION I YEAR IV, FMS

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

3004 AA

NSN: 2915-01-310-2141 NZ

Augmentor Fuel Control Fixed Price shall include all labor, material, equipment, and facilities to accomplish the repair and/or overhaul of the items in accordance with the provisions hereof and the attached Performance Work Statement, Revision 5.

Upon receipt of a delivery order funded with the highest amount (overhaul amount), the Contractor shall inspect and test each reparable as necessary to determine its condition and annotate which ELIN is required to return that reparable to a serviceable condition and document the applicable ELIN in a format prescribed by the ACO. ELIN descriptions can be found below. The ACO or ACO's designated representative will verify that the ELIN(s) proposed by the Contractor are required and issue a modification establishing the quantities for those ELINs, a definitive delivery schedule, and line item price (downward) as necessary.

ELINs described below are found in Section J attachment titled "Exhibit A"

ELIN Title Description

Check and Test Only Upon arrival, the part has sufficient life remaining, and passes all serviceability testing requirements.

No repair.

Check and Test and Repair Check and Test the part and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .