Synopsis of Repair Services for B-2 Power Drive Unit Controller Motor Controller

This is a Federal contract synopsis issued by the Department of the Air Force for repair services of the B-2 Power Drive Unit Controller (PDUC) Motor Controller, NSN 6130-01-317-2372 FW, manufactured by The Boeing Company. The solicitation number is FA8119-26-R-0010, issued March 6, 2026, by the contracting office at Tinker Air Force Base, Oklahoma. The anticipated solicitation issue date is April 1, 2026, with a closing date of April 30, 2026. The contract award is anticipated for June 2026, with contract performance at the contractor's facility.

The procurement involves a two-year period of performance structured with ten line items across two one-year ordering periods (June 2026-June 2027 and June 2027-June 2028). Line items include Test, Tear Down, and Evaluation services (5 units per period), Repair services (5 units per period), No Fault Found services, Data NSP, and Over & Above services. This is a sole-source requirement to Safran Electronics & Defense, Avionics USA, LLC, identified as the only approved acquisition source per a teaming agreement. The contracting officer is Jimmy Culver, PCO, reachable at (405) 739-4549. All responsible sources may submit capability statements, proposals, or quotations for consideration despite the sole-source designation under FAR 6.302-1 authority.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

In accordance with FAR 5.207 Preparation and Transmittal of Synopses.

(1) Action Code:

N/A.

(2) Date:

06 March

(3) Year:

(4) Contracting Office Zip Code:

73145

(5) Product or Service Code:

6110 - ELECTRICAL CONTROL EQUIPMENT

Includes:

Contactors: Motor Controllers; Power Servomechanisms; Switchgear; Voltage Regulators

(6) Contracting Office Address:

DEPARTMENT OF THE AIR FORCE (DAF)

BLDG 3001 SUITE 1AF1-99A

TINKER AFB, OK. 73145

(7) Subject:

Synopsis of Repair Services for B-2 Power Drive Unit Controller (PDUC) Motor Controller.

(8) Proposed Solicitation Number:

FA8119-26-R-0010

(9) Closing Response Date:

Anticipated solicitation issue date: 1 Apr 2026 Anticipated solicitation closing date: 30 Apr 2026

(10) Contact Point or Contracting Officer:

Jimmy Culver Procuring Contracting Officer, (PCO)

(405) 739-4549

(11) Contract Award and Solicitation Number:

(12) Contract Award Dollar Amount:

(13) Contract Line Item Numbers:

Proposed Line Items

Line Item 0001: Test, Tear down, and Evaluation (TT&E) of NSN: 6130-01-317-2372 FW Basic Ordering Period June 2026-June 2027 Best Estimated Quantity – 5 Ea

Line Item 0002: Repair of NSN: 6130-01-317-2372 FW Basic Ordering Period June 2026-June 2027 Best Estimated Quantity – 5 Ea

Line Item 0003: No Fault Found Basic Ordering Period May June 2026-June 2027

Line Item 0004: Data NSP Basic Ordering Period June 2026-June 2027

Line Item 0005: Over & Above Basic Ordering Period October June 2026-June 2027

Line Item 1001: Test, Tear down, and Evaluation (TT&E) of NSN: 6130-01-317-2372 FW Basic Ordering Period June 2027-June 2028 Best Estimated Quantity – 5 Ea

Line Item 1002: Repair of NSN: 6130-01-317-2372 FW Basic Ordering Period June 2027-June 2028 Best Estimated Quantity – 5 Ea

Line Item 1003: No Fault Found Basic Ordering Period May June 2027-June 2028

Line Item 1004: Data NSP Basic Ordering Period June 2027-June 2028

Line Item 1005: Over & Above Basic Ordering Period October June 2027-June 2028

(14) Contract Award Date:

(15) Contractor:

This is a Sole- Source to Northrup Grumman.

(16) Description:

(a) National Stock Number (NSN) if assigned:

NSN: 6130-01-317-2372 FW

(b) Specification and whether an offeror, its product, or service must meet a qualification requirement in order to be eligible for award, and identification of the office from which additional information about the qualification requirement may be obtained (see Subpart 9.2).

(c) Manufacturer, including part number, drawing number, etc:

The original equipment manufacturer is The Boeing Company

(d) Size, dimensions, or other form, fit or functional description:

N/A

(e) Predominant material of manufacture:

(f) Quantity, including any options for additional quantities:

Line Item 0001 (Basic): Tear Down Test & Evaluation Best Estimated Quantity – 5 Ea

Line Item 0002 (Basic): Repair

Line Item 0003: No Fault Found

Line Item 0004: Data

Line Item 0005: Over and Above

Line Item 1001 (Basic): Tear Down Test & Evaluation Best Estimated Quantity – 5 Ea

Line Item 1002 (Basic): Repair

Line Item 1003: No Fault Found

Line Item 1004: Data

Line Item 1005: Over and Above

(g) Unit of issue:

Line Item 0001 (Basic): Tear Down Test & Evaluation Unit: Each

Line Item 0002 (Basic): Repair

Line Item 0003 (Basic): No Fault Found Unit: Lot

Line Item 0004 (Basic): Data Unit: Each

Line Item 0005 (Basic): Over and Above Unit: Each

Line Item 1001 (Basic): Tear Down Test & Evaluation Unit: Each

Line Item 1002 (Basic): Repair Unit: Each

Line Item 1003 (Basic): No Fault Found Unit: Lot

Line Item 1004 (Basic): Data Unit: Each

Line Item 1005 (Basic): Over and Above

(h) Destination information:

(i) Delivery schedule:

(j) Duration of the contract period.

The period of performance (PoP) for this service contract is for a two (2) year period, starting on the day of contract award.

(k) Sustainable acquisition requirements (or a description of high-performance sustainable building practices required, if for design, construction, renovation, repair, or deconstruction) (see parts 23 or 36).

(l) For a proposed contract action in an amount estimated to be greater than $25,000 but not greater than the simplified acquisition threshold, enter—

i. A description of the procedures to be used in awarding the contract (e.g., request for oral or written quotation or solicitation), and

The solicitation will be posted by GPE on Sam.gov.

ii. The anticipated award date.

June 2026

(m) For Architect-Engineer projects and other projects for which the product or service codes are insufficient, provide brief details with respect to: location, scope of services required, cost range and limitations, type of contract, estimated starting and completion dates, and any significant evaluation factors.

(n) In the case of noncompetitive contract actions (including those that do not exceed the simplified acquisition threshold), identify the intended source and insert a statement of the reason justifying the lack of competition.

This is a sole source requirement to Safran Electronics & Defense, Avionics USA, LLC. Safran Electronics & Defense, Avionics USA, LLC is the only approved acquisition source for this asset per a teaming agreement.

(o)

i. Except when using the sole source authority at 6.302-1, insert a statement that all responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency.

ii. When using the sole source authority at 6.302-1, insert a statement that all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.

Safran Electronics & Defense, Avionics USA, LLC is the only approved acquisition source for this asset. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.

(p) If solicitations synopsized through the GPE will not be made available through the

GPE, provide information on how to obtain the solicitation.

(q) If the solicitation will be made available to interested parties through electronic data interchange, provide any information necessary to obtain and respond to the solicitation electronically.

(r) If the technical data required to respond to the solicitation will not be furnished as part of such solicitation, identify the source in the Government, such as https://www.fedbizopps.gov/, from which the technical data may be obtained.

(17) Place of Contract Performance:

Contractor’s facility.

(18) Set-aside Status:

This requirement is sole source, therefore it is not a set-aside.