FA811919R0032_DIDs.pdf
PDF 550 KB Posted
- Attached to
- Repair of the B-2 Shaft Fault Indicator
- Solicitation number
- FA8119-19-R-0032
About this file
Data Item Descriptions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811919R00320001_Amended_Solicitation.pdf | ||
| CDRL's_REPORT.pdf | ||
| CAVAF_Reporting.pdf | ||
| 2791071_TRNSPDATA_REPORT.pdf | ||
| PWS.pdf | ||
| FA811919R0032_RFP.pdf | ||
| Packaging.pdf | ||
| Wage_Determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE/REPORT
Number: DI-QCIC-80798C Approved Date: 20170123 AMSC Number: F9766 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 36 Project Number: QCIC-2017-003 Applicable Forms: N/A Use/Relationship: The Calibration Certificate/Report documents calibration certificates or reports accompanying the calibrations performed on Department of Defense (DoD) test, measurement, and diagnostic equipment.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable to contracts requiring calibration of test equipment prior to delivery.
This DID is consistent with ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, requirements for calibration reports or certificates.
(Copies of this document are available online at http://www.iso.org.)
c. This DID supersedes DI-QCIC-80798B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The calibration certificate or report shall include:
a. Title (e.g., calibration certificate or calibration report);
b. The name and address of the laboratory and the location where the calibrations were carried out, if different from the address of the laboratory;
c. Unique identification of the calibration certificate or test report (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the calibration certificate or test report;
d. The name and address of the client or customer;
e. Identification of the method used;
f. A description of, the condition of, and the unambiguous identification of the item(s) tested or calibrated;
g. The date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2017-03-13T13:39Z Check the source to verify that this is the current version before use.
DI-QCIC-80798C
h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. The test or calibration results with, where appropriate, the units of measurement;
j. The name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the calibration certificate or test report;
k. Where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
l. The conditions (e.g., environmental) under which the calibrations were made that have an influence on the measurement results;
m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. Evidence that the measurements are traceable.
End of DI-QCIC-80798C.
Source: https://assist.dla.mil -- Downloaded: 2017-03-13T13:39Z
Title: COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)/GOVERNMENT
FURNISHED MATERIAL REPORT
Number: DI- MGMT-81634C Approved Date: 20150911 AMSC Number: 9581 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4RM) Project Number: MGMT-2015-025 Applicable Forms: N/A Use/Relationship: CAV AF is a web based system used to permit the reporting of end item repair and Government Furnished Material (GFM) transactions incident to the execution of Contract Depot Maintenance (CDM) contracts for the purpose of providing visibility and oversight of these assets.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.
b. This DID may be used on any depot-level repair contract.
c. This DID supersedes DI-MGMT-81634B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Format. The CAV AF System transactions are processed via the World Wide Web, https://www.cavaf.com. Input formats are found in the CAV AF Users Guide. Repair contractors will be furnished with a copy of the CAV AF Users Guide.
3. Content. The contractor reporting shall contain the following transactions and report types as described in the CAV AF Users Guide:
a. End Items:
(1) Receipt
(2) Induction
(3) Awaiting Parts (AWP)
(4) Re-induction
(5) Survey/Scrap
(6) Completion
(7) Shipment
(8) Proof of Shipment
(9) Reversals
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:40Z https://www.cavaf.com/
DI-MGMT-81634C
(10) Assets Beyond Economic Repair (BER) and Maintenance Expenditure Limit (MEL)
(11) Bulk Process
(12) Borrow/Payback
b. Government Furnished Material (GFM):
(1) Requisitions:
(a) Create
(b) Modify
(c) Cancel
(d) Follow-up as appropriate
(2) Receive material:
(a) Modify/reverse material option
(3) Issue material:
(a) Reverse issue of material
(4) Transfer material.
(5) Turn-in material:
(a) Reverse material turn in
(6) Condemnation/Plant Clearance of material:
(a) Condemn an item
(b) Reverse Condemnation
(c) Plant Clearance
(d) Reverse Plant Clearance
(7) Shipping of material:
(a) Material Release Order (MRO)
(b) Redistribution Order (RDO)
(c) After Receipt of Order (ARO)
(d) Reverse Material Shipment
End of DI-MGMT-81634C
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:40Z
Title: CONFERENCE AGENDA
Number: DI-ADMN-81249B Approved Date: 20160524
AMSC Number: F9658 Limitation:
DTIC Applicable: GIDEP Applicable:
Preparing Activity: 11 (AFLCMC/EZSC) Project Number: ADMN-2015-002
Applicable Forms: None
Use/Relationship: The Conference Agenda provides information concerning purpose, location, and schedule of conferences required to manage the acquisition of systems equipment, related items, and services.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID supersedes DI-ADMN-81249A.
Requirements:
1. Reference documents. None.
2. Format. Contractor format is acceptable.
3. Content. The agenda shall include the following, where applicable:
a. The purpose and objective of the conference.
b. The conference location, date, and duration.
c. A daily chronological listing of each major topic or subtopic to be discussed and the time to be devoted to each topic.
d. A list of activities to be represented and identification of their responsibilities.
e. A list of subcommittees to be established during the conference and the proposed activity representation for each subcommittee.
f. Reference to and brief description of the results of previous meetings, when relevant.
g. Location, schedule, and purpose or subject area to be covered by each subcommittee, when applicable.
h. Names of the conference chairperson, co-chair, and subcommittee chairs, when applicable.
i. Information on billeting, messing, transportation, and administrative services available to conference attendees.
j. Complete list of all documentation to be available for review.
Source: https://assist.dla.mil -- Downloaded: 2016-06-13T19:01Z
DI-ADMN-81249B
k. Brief description of progress on actions or problems identified at previous meetings, when applicable.
l. Other pertinent information such as Forms to be used, identification of any deviations or waivers, security classification, and clearance requirements.
End of DI- ADMN-81249B
Source: https://assist.dla.mil -- Downloaded: 2016-06-13T19:01Z
Title: CONFERENCE MINUTES
Number: DI-ADMN-81250B Approved Date: 20160524
AMSC Number: F9659 Limitation:
DTIC Applicable: GIDEP Applicable:
Preparing Activity: 11 (AFLCMC/EZSC) Project Number: ADMN-2015-001
Applicable Forms:
Use/Relationship: Conference minutes provide documentation of technical information provided and decisions and agreements reached at meetings.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID supersedes DI-ADMN-81250A.
Requirements:
1. Reference documents: None.
2. Format. Contractor format is acceptable.
3. Content. The minutes shall include the following information:
a. A title page containing the following:
(1) Title – type of meeting and date.
(2) Identification of the acquisition (system, equipment, contract number) for which the meeting was held.
(3) Space for signatures of the designated representatives of the contractor and acquisition activity.
(4) The name of the contractor and address to which the acquisition activity should acknowledge receipt of comments.
b. The purpose and objective of the conference.
c. The conference location.
d. A summary of the discussions, decisions, agreements reached, and directions of the conference or individual subcommittees thereof.
e. A list of attendees by name, rank, grade or position, activity represented, activity symbol/code, phone numbers, and emails, as appropriate.
f. Action items resulting from the conference.
g. Briefing charts, if presented, shall be attached to the minutes for information only.
End of DI- ADMN-81250B
Source: https://assist.dla.mil -- Downloaded: 2016-06-13T19:02Z
Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT
Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID may be used on any depot level maintenance contract.
Requirements:
1. Format. This report shall be provided in the format of Table I.
2. Content. The report shall consist of two parts and contain the following information:
a. Part I:
(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.
(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.
(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.
(4) Block 3, Contract number and Program or Weapon System supported.
(5) Block 4, Government item manager or technical Point of Contact.
(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.
(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.
(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z
DI-PSSS-81995
(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.
(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.
(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.
(12) Block G, Reparables inducted into repair during report month.
(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.
(14) Block I, Quantity produced. The quantity produced during the month.
(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.
(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.
(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.
(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.
(19) Block N, Report date. Enter date of report.
b. Part II, Production problems. Report shall be in narrative format and only required if:
(1) Previous reports production forecast was not shipped.
(2) Current forecast does not equal contract scheduled quantity.
(3) Contract anticipates a problem in the near future.
TABLE I. Contract Depot Maintenance (CDM) Production Report format.
CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date
(YYYYMMDD)
Part I
1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC
DURING REPORT PERIOD/TOTAL TO DATE
A.
ITEM
IDENTIFICATION
B.
DELIVERY/
CALL NUMBER
C.
CONTRACT
LINE ITEM
(CLIN)
D.
DOCUMENT/
VOUCHER
NUMBER
E.
QTY ON
CONTRACT
OR
DO/CALL
F.
REPARABLES
RECEIVED
G.
QTY
IND TO
WORK
H.
REPS ON
HAND
I.
QTY
PROD
J.
SERVICEABLES
SHIPPED
K.
SERV ON
HAND
L.
QTY
CONDEMNED
M.
FORECAST PROD
N.
REPORT DATE
FSC NIIN
1 2 1 2 3 1 2 1 2 1 2
Part II, Production Summary
End of DI-PSSS-81995.
Source: https://assist.dla.mil -- Downloaded: 2014-08-19T14:56Z
TITLE: COUNTERFEIT PREVENTION PLAN
Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:
DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A
Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.
a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.
b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).
c. This DID is related to “As Designed” and “As Built” Parts List.
d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).
Requirements:
1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:
a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.
b. Procurement practices and internal processes used for exceptions to buying from
OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.
c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.
d. Training/certification program for receiving inspectors.
e. Process to verify counterfeit.
DI-MISC-81832
- 2 -
f. Processes to identify, store, and report counterfeit parts.
g. Process to ensure subcontracts contain the following requirements (As a minimum):
(1) Requirements to procure only from Original Equipment Manufacturer
(OEM) or OEM franchised distributors
(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained
(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain
(4) Training/certification program for receiving inspectors
(5) Process to verify counterfeit
(6) Processes to identify, store, and report counterfeit parts.
(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)
h. Self-audit of internal processes.
i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.
j. Notification Procedure:
(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.
(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.
Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.
DI-MISC-81832
- 3 -
(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:
a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information
b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence
c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)
d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests
e. List of company products affected
(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)
(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.
(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team
END OF DI-MISC-81832
Title: ENGINEERING CHANGE PROPOSAL (ECP)
Number: DI-SESS-80639D Approval Date: 20150407
AMSC Number: N9521 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: NM Project Number: SESS-2015-011
Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)
Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and how the proposed change will be implemented.
a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in paragraph 3.3.1 (1) of EIA-649-1 and the principles of EIA-649.
b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for
NORs should be contractually imposed in conjunction with this DID.
c. This DID supersedes DI-CMAN-80639C and DI-SESS-81880.
d. Copies of these standards are available online at http://www.sae.org or from SAE International, 400
Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 (inside USA and Canada) or 724-776-4970
(outside USA).
e. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at http://www.dtic.mil/whs/directives/forms/index.htm.
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. The ECP shall be in one of the following formats:
a. DD Form 1692, Engineering Change Proposal (ECP),
b. The schema required by the Acquirer’s Integrated Digital Environment (IDE), or
c. The Supplier’s preferred format.
3. Content. The ECP shall contain all the information in DD Form 1692.
End of DI-SESS-80639D
Source: https://assist.dla.mil -- Downloaded: 2015-05-19T14:32Z http://www.sae.org/ http://www.dtic.mil/whs/directives/forms/index.htm
Title: GOVERNMENT PROPERTY INVENTORY REPORT
Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None
Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.
This DID supersedes DI-MGMT-80441B.
Requirements:
1. Format. The report shall be electronic .xls or .xlsx compatible.
2. Content. The report shall contain the following columns/data fields:
A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or
Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling
(ST))
Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z
DI-MGMT-80441C
S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code
END OF DI-MGMT-80441C
Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z
Title: Status Report
Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship:
The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
It is not intended that all requirements herein should be applied to every program.
Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.
This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.
This DID supersede DI-MGMT-80368.
1. Reference documents. None.
2. Format. The Status Report shall be in contractor format.
2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.
a. Title/identification of the system/component/program/project.
DI-MGMT-80368A
b. Type of report (e.g., monthly, interim, final).
c. Period covered by the report.
d. Contract number.
e. Preparing activity or contractor’s title.
f. Security classification, when required.
g. Distribution Statement.
2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.
3. Content. The report shall contain the following:
3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.
3.2 Body of report. The Status Report shall contain the following items, where applicable:
3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:
a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.
b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.
c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.
d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.
e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.
f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2
DI-MGMT-80368A
g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.
i. Any other information which may cause significant changes in the program schedule.
3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.
3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.
3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.
3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).
3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.
4. END OF DI-MGMT-80368A
| DID_GovernmentPropertyInventory.pdf |
| AMSC Number: 9865 Limitation: |
| Requirements: |
| DID_StatusReport.pdf |
| DATA ITEM DESCRIPTION |
| Requirements: |
File details come from the government source that posted it.