PDF 128 KB Posted
- Attached to
- AMENDED SOLICITATION KC135 FLUTTER DAMPENER Federal contract opportunity
- Solicitation number
- FA8118-20-R-0039
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATCH_11_PKGRQMT.pdf | ||
| ATCH_9_RDL.pdf | ||
| ATCH_4_DID80503.pdf | ||
| EXHIBIT_A_CDRL1_REPORT.pdf | ||
| ATCH_6_Statement_of_Work_SOW_FD2030902425.pdf | ||
| ATCH_5_DID80969.pdf | ||
| ATCH_8_ITMDESC.pdf | ||
| ATCH_12_TRNSPDATA.pdf | ||
| ATCH_2_DID81995.pdf | ||
| ATCH_10_UIIEC.pdf | ||
| ATCH_3_DID80441C.pdf | ||
| FA811820R0039_KC135_FLUTTER_DAMPENER.pdf | ||
| ATCH_7_CAVAF_REPORTING.pdf | ||
| ATCH_1_DID81838.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8118-20-R-0039-0001
3. EFFECTIVE DATE
10 SEP 2020
4. REQUISITION/PURCHASE REQ. NO.
FD20301902425
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZABB
3001 STAFF DR STE 1AC4 99A
TINKER AFB OK 73145-3303
BUYER: Max Simpson/AFSC/PZABB maxwell.simpson@us.af.mil Phone: (405) 739- 5463
7. ADMINISTERED BY (If other than item 6) CODEFA8118
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA811820R0039
9B. DATED (SEE ITEM 11)
18-AUG-2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 8-OCT-2020 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION for REMANUFACTURE OF KC-135 FLUTTER DAMPENER
AMENDED TO INCLUDE NEW FAR & DFARS CLASS DEVIATION CLAUSES
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8118-20-R-0039-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
AMENDED TO INCLUDE NEW FAR & DFARS CLASS DEVIATION CLAUSES, UPDATED REGARDING
THE UNITED STATES-MEXICO-CANADA AGREEMENT, EFFECTIVE IMMEDIATELY, PER THE
FOLLOWING:
DFARS 252.225-7013, Duty-Free Entry (DEVIATION 2020-O0019) DFARS 252.225-7017, Photovoltaic Devices (DEVIATION 2020-O0019) DFARS 252.225-7018, Photovoltaic Devices-Certificate
(DEVIATION 2020-O0019)
DFARS 252.225-7021, Trade Agreements. (DEVIATION 2020-O0019) (Basic and Alternate II) DFARS 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.
(DEVIATION 2020-O0019) (Basic and Alternates II, IV, and V) DFARS 252.225-7036, Buy American—Free Trade Agreements--Balance of Payments Program. (DEVIATION 2020-O0019) (Basic and Alternates II, IV, and V) 252.225-7045 Balance of Payments Program--Construction Material Under Trade Agreements (DEVIATION 2020-O0019) (Basic and Alternates I, II, and III) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (DEVIATION 2020-O0019) 52.225-11, Buy American—Construction Materials Under Trade Agreements (DEVIATION 2020-O0019) (Basic and Alternate I)
ALL OTHER CLAUSES, TERMS AND CONDITIONS REMAIN UNCHANGED.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1. REMANUFACTURE
THIS SOLICITATION IS ISSUED Remanufacture of the KC-135 FLUTTER DAMPENER, NSN: 1650-00-898-3516 .
(a) The contractor shall provide all labor, facilities, equipment and all material to accomplish the overhaul to return the end item to a serviceable condition in accordance with the solicitation requirements and all attachments. in Section J hereof.
(b) IAW the STATEMENT OF WORK (SOW); Item 2.2.1: Basic repair requirements. The end item shall be functionally tested to determine the failure mode causing the unserviceable condition, disassembled to the point necessary to correct the deficiency, cleaned, components inspected, assembled, and tested according to the applicable technical documents. Performance objectives, are specified in SECTION 5. (TABLE 5-1, OF SOW). The pricing for these items shall be included in the repair cost.
(c) A Pre-Award Survey and IPE may be required for each CLIN. Details are provided STATEMENT OF WORK (SOW).
The Pre-Award Survey and/or IPE may be waived at the Government’s discretion.
(d) Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply. Sources must be qualified prior to being considered for award. Interested vendors that have not been previous approved for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405-739-7243, or via email:
afsc.sb.workflow@us.af.mil . As prescribed in FAR 9.202(e). The contracting officer need not delay a proposed award in order to provide a potential offeror with any opportunity to demonstrate its ability to meet the standards specified for qualification.
(e) In order to receive any technical data related to this acquisition, offerors must be registered with WWW.SAM.GOV. Additionally, requests are to be submitted directly to PCO, for Technical Orders (TOs). The request shall include the applicable solicitation number, the specific data needed (including TO numbers), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at:
http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.
The Government is not responsible for misdirected or untimely requests.
(f) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the work Specification and/or Technical Orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). Condemned units shall not be counted as production.
(g) Offerors must clearly identify all proposed deviations from the solicitation requirements and/or exceptions to the terms and conditions. Offerors must also provide complete rationale for all proposed deviations and/or exceptions. See section L, INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS FOR PROPOSAL
PREPARATION USING PRICE-ONLY PROCEDURES.
(h) If you believe that any of the Government's required deliveries are unreasonable or not obtainable, provide a schedule your firm considers to be a reasonable, obtainable delivery schedule and include, as an attachment to your response, delivery is to be IAW the solicitation. Note: Failure to meet or exceed theGovernment's required delivery and/or include the information requested in the solicitation may result in the proposal not being considered for award.
(i) Dates listed in clause 252.216-7006 are based on the estimated effective contract date of 28 SEPTEMBER 2020. These dates will be revised, if necessary, prior to award based on the actual award date. The fill-in data in Clause 252.217-7001 will be (BLANK) until a surge is specified; negotiations will be completed based on surge requirement and subsequent contractor proposal to support the surge.
(j) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003.
Contractor determined location and method of marking is acceptable.
(k) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1 when serviceable assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned serviceable asset. If a DD1348-1 is not included with each returned serviceable asset, DCMA will not sign the DD250.
(l) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum”will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(m) Submission of other than certified cost or pricing data. It is anticipated that pricing of this action, based on adequate price competition; therefore, offerors are not required to submit other than certified cost or pricing data. However, if after receipt of proposals it is determined that adequate price competition does not exist, other than certified cost or pricing data may be required.
(n) "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs."
B.2. ADDITIONAL INFORMATION
THIS SOLICITATION CONTEMPLATES AN AWARD OF A 5-YEAR REQUIREMENTS TYPE
CONTRACT. PERIOD OF PERFORMANCE IS ONE BASIC YEAR AND FOUR ONE-YEAR OPTION PERIODS.
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
BASIC YEAR
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
15 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 1650-00-898-3516 FL
DAMPENER,FLUTTER
Exerts a drag force on the pilot's flight controls that is proportional, to airspeed providing feel in the control system.
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
BASIC YEAR
Staineless Steel, Aluminum, Bronz Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For
+ CNOTE PAB
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ CNOTE 6 EA 6ea 45 days ARO funded or
Proposed Delivery
+ CNOTE 6 EA
CNOTE
OVER & ABOVE
BASIC YEAR
Item No.
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
DESCRIPTION
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
“Over and above work” shall be performed IAW the Appendix A and DFARS clause 252.217-7028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and
ACO/PCO.
FIXED PRICED ITEMS
At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract.
Fixed priced items shall be defined as they are negotiated.
Over and Above Priority: R
DATA
BASIC YEAR
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
N ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
EXHIBIT: A
RELATED LINE ITEM 0001
ITEM NO. ITEM DESCRIPTION
Best Estimated
QTY
UNIT
UNIT
PRICE
TOTAL
PRICE
A001 CAV AF End Item Reporting TBD LO NSP NSP A002 Contract Depot Maintenance (CDM) Production
Report
TBD LO NSP NSP
A003 Government Property Inventory Report TBD LO NSP NSP A004 Report of Shipping (Item) and Packaging Discrepancy TBD LO NSP NSP A005 Production Surge Plan TBD LO NSP NSP
NSP = NOT SEPARATELY PRICED
The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete from the bid price each line item of data and/or reports that the Government does not desire prior to and after final award.
DELIVERY IS IN ACCORDANCE WITH DD FORM 1423-1.
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
Data Data line item Priority: R
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
12 EA
CLIN ACRN ACRN Total
1001 AA
NSN: 1650-00-898-3516 FL
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR I
DAMPENER,FLUTTER
Exerts a drag force on the pilot's flight controls that is proportional, to airspeed providing feel in the control system.
Staineless Steel, Aluminum, Bronz Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For
+ CNOTE PAB
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ CNOTE 6 EA 6ea 45 days ARO funded or
Proposed Delivery
OPTION YEAR I
Item No.
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
DESCRIPTION
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
“Over and above work” shall be performed IAW the Appendix A and DFARS clause 252.217-7028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and
ACO/PCO.
FIXED PRICED ITEMS
At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract.
Fixed priced items shall be defined as they are negotiated.
Over and Above Priority: R
DATA
OPTION YEAR I
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
N ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
EXHIBIT: A
RELATED LINE ITEM 1001
ITEM NO. ITEM DESCRIPTION
Best Estimated
QTY
UNIT
UNIT
PRICE
TOTAL
PRICE
B001 CAV AF End Item Reporting TBD LO NSP NSP B002 Contract Depot Maintenance (CDM) Production
Report
TBD LO NSP NSP
B003 Government Property Inventory Report TBD LO NSP NSP B004 Report of Shipping (Item) and Packaging Discrepancy TBD LO NSP NSP B005 Production Surge Plan TBD LO NSP NSP
NSP = NOT SEPARATELY PRICED
The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete from the bid price each line item of data and/or reports that the Government does not desire prior to and after final award.
DELIVERY IS IN ACCORDANCE WITH DD FORM 1423-1.
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
Data Data line item Priority: R
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR II
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
12 EA
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR II
CLIN ACRN ACRN Total
2001 AA
NSN: 1650-00-898-3516 FL
DAMPENER,FLUTTER
Exerts a drag force on the pilot's flight controls that is proportional, to airspeed providing feel in the control system.
Staineless Steel, Aluminum, Bronz Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For
+ CNOTE PAB
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ CNOTE 6 EA 6ea 45 days ARO funded or
Proposed Delivery
OPTION YEAR II
Item No.
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
DESCRIPTION
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
“Over and above work” shall be performed IAW the Appendix A and DFARS clause 252.217-7028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and
ACO/PCO.
FIXED PRICED ITEMS
At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract.
Fixed priced items shall be defined as they are negotiated.
Over and Above Priority: R
DATA
OPTION YEAR II
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
N ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
EXHIBIT: A
RELATED LINE ITEM 2001
ITEM NO. ITEM DESCRIPTION
Best Estimated
QTY UNIT
UNIT
PRICE
TOTAL
PRICE
C001 CAV AF End Item Reporting TBD LO NSP NSP C002 Contract Depot Maintenance (CDM) Production
Report
TBD LO NSP NSP
C003 Government Property Inventory Report TBD LO NSP NSP C004 Report of Shipping (Item) and Packaging Discrepancy TBD LO NSP NSP C005 Production Surge Plan TBD LO NSP NSP
NSP = NOT SEPARATELY PRICED
The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete from the bid price each line item of data and/or reports that the Government does not desire prior to and after final award.
DELIVERY IS IN ACCORDANCE WITH DD FORM 1423-1.
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
Data Data line item Priority: R
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR III
Item No.
Firm Fixed Price
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR III
Best Estimated Qty
U/I Unit Price Estimated Total Price
12 EA
CLIN ACRN ACRN Total
3001 AA
NSN: 1650-00-898-3516 FL
DAMPENER,FLUTTER
Exerts a drag force on the pilot's flight controls that is proportional, to airspeed providing feel in the control system.
Staineless Steel, Aluminum, Bronz Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For
+ CNOTE PAB
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ CNOTE 6 EA 6ea 45 days ARO funded or
Proposed Delivery
OPTION YEAR III
Item No.
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
DESCRIPTION
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
“Over and above work” shall be performed IAW the Appendix A and DFARS clause 252.217-7028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and
ACO/PCO.
FIXED PRICED ITEMS
At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract.
Fixed priced items shall be defined as they are negotiated.
Over and Above Priority: R
DATA
OPTION YEAR III
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
N ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
EXHIBIT: A
RELATED LINE ITEM 3001
ITEM NO. ITEM DESCRIPTION
Best Estimated
QTY
UNIT
UNIT
PRICE
TOTAL
PRICE
D001 CAV AF End Item Reporting TBD LO NSP NSP D002 Contract Depot Maintenance (CDM) Production
Report
TBD LO NSP NSP
D003 Government Property Inventory Report TBD LO NSP NSP D004 Report of Shipping (Item) and Packaging Discrepancy TBD LO NSP NSP D005 Production Surge Plan TBD LO NSP NSP
NSP = NOT SEPARATELY PRICED
The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete from the bid price each line item of data and/or reports that the Government does not desire prior to and after final award.
DELIVERY IS IN ACCORDANCE WITH DD FORM 1423-1.
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
Data Data line item Priority: R
REMANUFACTURE OF KC-135 FLUTTER DAMPENER
OPTION YEAR IV
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
12 EA
CLIN ACRN ACRN Total
4001 AA
NSN: 1650-00-898-3516 FL
DAMPENER,FLUTTER
Exerts a drag force on the pilot's flight controls that is proportional, to airspeed providing feel in the control system.
Staineless Steel, Aluminum, Bronz Priority: R
Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE ORIGIN
Type / Ship To PACRN Mark For
+ CNOTE PAB
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ CNOTE 6 EA 6ea 45 days ARO funded or
Proposed Delivery
OPTION YEAR IV
Item No.
To Be Negotiated Quantity U/I Unit Price
1 LO TBN
DESCRIPTION
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
“Over and above work” shall be performed IAW the Appendix A and DFARS clause 252.217-7028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and
ACO/PCO.
FIXED PRICED ITEMS
At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract.
Fixed priced items shall be defined as they are negotiated.
Over and Above Priority: R
DATA
OPTION YEAR IV
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
N ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
EXHIBIT: A
RELATED LINE ITEM 4001
ITEM NO. ITEM DESCRIPTION
Best Estimated
QTY
UNIT
UNIT
PRICE
TOTAL
PRICE
E001 CAV AF End Item Reporting TBD LO NSP NSP E002 Contract Depot Maintenance (CDM) Production
Report
TBD LO NSP NSP
E003 Government Property Inventory Report TBD LO NSP NSP E004 Report of Shipping (Item) and Packaging Discrepancy TBD LO NSP NSP E005 Production Surge Plan TBD LO NSP NSP
NSP = NOT SEPARATELY PRICED
The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete from the bid price each line item of data and/or reports that the Government does not desire prior to and after final award.
DELIVERY IS IN ACCORDANCE WITH DD FORM 1423-1.
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423-1, ATTACHED AND MADE A PART HEREOF.
Data Data line item Priority: R
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + CNOTE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA TO BE CITED ON EACH INDIVIDUAL ORDER $0.00
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
(IAW 4.2105(b))
52.222-19 CHILD LABOR COOPERATION WITH AUTHORITIES AND REMEDIES (DEVIATION
2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019 Revision 1)
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
14. Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item--
(1) Means any item of supply (including construction material) that is
13. A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
14. Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(iv)For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(v)For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(iv)A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland,Taiwan, Ukraine, or United Kingdom);
(v)A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(vi)A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means
(iv)An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
Free Trade Agreement country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(v)In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
Least developed country construction material means a construction material that--
(iv) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
15. Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
Excepted Construction Material
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
CONSTRUCTION MATERIAL
DESCRIPTION
UNIT OF MEASURE QUANTITY PRICE (DOLLARS)*
Item 1: Foreign construction material
Domestic construction material
Item 2: Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of clause)
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
252.225-7013 DUTY-FREE ENTRY (DEVIATION 2020-O0019) (JUL 2020)
252.225-7017 PHOTOVOLTAIC DEVICES (DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
252.225-7021 TRADE AGREEMENTS--BASIC (DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
252.225-7021 TRADE AGREEMENTS-- ALTERNATE II (DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
252.225-7036 BUY AMERICAN--FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS
PROGRAM--BASIC (DEVIATION 2020-O0019) (JUL 2020)
252.225-7036 BUY AMERICAN--FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS
PROGRAM--ALTERNATE II (DEVIATION 2020-O0019) (JUL 2020)
252.225-7036 BUY AMERICAN--FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS
PROGRAM--ALTERNATE IV (DEVIATION 2020-O0019) (JUL 2020)
252.225-7036 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS
PROGRAM-ALTERNATE V (DEVIATION 2020-O0019) (JUL 2020)
252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE
AGREEMENTS--BASIC (DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
(a) Definitions. As used in this clause—
“Caribbean Basin country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
“Commercially available off-the-shelf (COTS) item”—
(i) Means any item of supply (including construction material) that is—
(A) A commercial item (as defined in paragraph (1) of the definition of “commercial item” in section 2.101 of the Federal Acquisition Regulation);
(B) Sold in substantial quantities in the commercial marketplace; and
(C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(ii) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. 40102), such as agricultural products and petroleum products.
“Component” means any article, material, or supply incorporated directly into construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(i) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(ii) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Designated country” means—
(i) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade Organization as “the Separate Customs Territory of Taiwan, Penghu, Kinmen, and Matsu” (Chinese Taipei)), Ukraine, or the United Kingdom);
(ii) A Free Trade Agreement country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Panama, Peru, or Singapore);
(iii) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(iv) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
“Designated country construction material” means a construction material that is a WTO GPA country construction material, a Free Trade Agreement country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
“Domestic construction material” means—
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if—
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(B) The construction material is a COTS item.
“Free Trade Agreement country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a Free Trade Agreement country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Free Trade Agreement country into a new and different construction material distinct from the material from which it was transformed.
“Least developed country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a least developed country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“United States” means the 50 States, the District of Columbia, and outlying areas.
“WTO GPA country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) This clause implements the Balance of Payments Program by providing a preference for domestic construction material. In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements apply to this acquisition. Therefore, the Balance of Payments Program restrictions are waived for designated country construction materials.
(c) The Contractor shall use only domestic or designated country construction material in performing this contract, except for—
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition
Regulation;
(2) Information technology that is a commercial item; or
(3) The construction material or components listed by the Government as follows:
Excepted Construction Material
AGREEMENTS--ALTERNATE I (DEVIATION 2020-O0019) (JUL 2020)
(IAW Deviation 2020-O0019)
(a) Definitions. As used in this clause—
“Bahrainian or Mexican construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of Bahrain or Mexico; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in Bahrain or Mexico into a new and different construction material distinct from the materials from which it was transformed.
“Caribbean Basin country construction material” means a construction material that—
(i) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
“Commercially available off-the-shelf (COTS) item”—
(i) Means any item of supply (including construction material) that is—
(A) A commercial item (as defined in paragraph (1) of the definition of “commercial item” in section 2.101 of the Federal Acquisition Regulation);
(B) Sold in substantial quantities in the commercial marketplace; and
(C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(ii) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. 40102), such as agricultural products and petroleum products.
“Component” means any article, material, or supply incorporated directly into construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(i) For components purchased by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .