Exhibit_A002_Contract_Depot_Maintenance_(CDM)_Production_Report.pdf

PDF 208 KB Posted

Attached to
Overhaul of B1B Electro Mechanical Actuator
Solicitation number
FA811820R0019
Issued by

View the file

Other files

File Type Posted
FA811820R0019 0004.pdf PDF
FA811820R0019 0004.pdf PDF
FA811820R0019 0004.pdf PDF
FA811820R0019 0003.pdf PDF
FA8118-20-R-0019_0002.pdf PDF
Exhibit_A001_Commercial_Asset_Visibility_(CAV)_Reporting.pdf PDF
Exhibit_A005_Production_Surge_Plan.pdf PDF
Transportation_Data.pdf PDF
Exhibit_Contract_Data_Requirements_List.pdf PDF
Packaging_Requirments.pdf PDF
Exhibit_A004_Report_of_Shipping_and_Packaging_Discrepancy.pdf PDF
Exhibit_A003_Government_Property_Inventory_Report.pdf PDF
Exhibit_Performance_Work_Statement_(PWS).pdf PDF
FA811820R00190001.pdf PDF
CAVAF.pdf PDF
Surge.pdf PDF
FA811820R0019.pdf PDF
Depot.pdf PDF
CDRL.pdf PDF
Property.pdf PDF
PWS.pdf PDF
Packaging.pdf PDF
Transportation.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904

AMSC Number: 9576 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009

Applicable Forms: N/A

Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

DI-PSSS-81995

End of DI-PSSS-81995.

File details come from the government source that posted it. Updated .